• Title/Summary/Keyword: building-up construction

Search Result 958, Processing Time 0.022 seconds

A study on the development of the construction project for the preliminary estimate based on a database of the BIM technique. (데이터베이스 중심의 BIM기반 개산견적을 위한 모델 개발)

  • Bae, Seong-Jae;Suh, Bong-Gyo;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.92-93
    • /
    • 2013
  • Recently, a technique based on BIM has been rapidly increased on the construction project. Task such as a calculation of supply easily is proceeded by the technique. Also, an quick and precise preliminary estimate is possible because this technique can be applied. To sum up, this study suggests that the preliminary estimate based on a database of the BIM technique is applicable for the early stage of the construction project.

  • PDF

New Building Materials and Methods for Modernized Korean Housing (Hanok) (보급형 신한옥을 위한 부위별 공법 개발 및 영향도 분석)

  • Kim, Min;Kim, Hyosun;Ryu, Jaeseon;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.23-32
    • /
    • 2014
  • Modernized Korean housing (Hanok) with competitive price has been actively developed due to the increased interests in traditional Korean housing. Developing new building materials and methods is an essential area for Modernized Hanok. This paper compared and analyzed two mock-up buildings of Modernized Hanok and one mock-up of Traditional Hanok those were actually constructed as test-beds. Many different new methods were introduced, and their influences on construction cost and schedule were analyzed in order to verify the research results as well as to find implications for future direction. As a result, the construction cost and schedule of Modernized Hanok have been decreased by about 40% and 20%, respectively, when compared with traditional one. 'Wood frame' and 'Roof' are found as being the most influencing areas with highest weights in terms of cost and schedule. Therefore, further development in these two areas would facilitate to reduce overall cost of Modernized Hanok with improved building performance.

Experimental Investigation of Rotation-Up Erection for Keel Truss Spatial Structures (Rotation-Up 공법에 의한 킬 트러스 대공간 구조물의 Erection 실험에 관한 연구)

  • Kim, Cheol-Hwan;Chae, Won-Tak;Baek, Ki-Youl;Jung, Hwan-Mok
    • Journal of Korean Association for Spatial Structures
    • /
    • v.13 no.2
    • /
    • pp.57-66
    • /
    • 2013
  • There are a number of construction methods to build spatial structures such as erection method, Element method, Block method, Sliding method, Lift-up method and Push-up method. These methods are uneconomical and low accuracy, and require long construction duration because of a need of a scaffold or a tower crane to build spatial roof frame. In this study, the construction method to erect a truss structure was proposed as an economical and easy installation method. The proposed method has end hinges of keel truss and winches with horizontal cable. This method makes safe and accurate production and reduces construction duration because trusses are built on the floor or supporter. The goal of this study is to verify the validity of construction method by building scale model using the proposed method.

Study on the Construction Method to Develop an Building Site After the Woongjin Period of Baekjae (백제 웅진기 이후 대지조성 공법의 연구)

  • Cho, Weon-Chang
    • Journal of architectural history
    • /
    • v.18 no.5
    • /
    • pp.25-39
    • /
    • 2009
  • The examples of developing a building site after the Woongjin period are mainly found in temple sites, tile-roofed building sites of unidentified features, and palace remains including the pavilion site with the river in the front(임류각지) inside the Castle of Gongsan, Gongjoo. In case of the Hanseong period, a glimpase of the features has gained in Poongnab mud castle and Mongchon mud castle, but the excavated relics are not yet enough to make some date out of them. After the Woongjin period of Baejae, the earth-ramming development method was used mostly to construct a building site, which is divided into horizontal and slant raising of the ground level. Both are used simultaneously, but there are the significant differences in the way of raising the ground level between them. Particularly, in case of the Wanggoong-ri relics in Iksan, the ground level was raised in a narrow line slantly, which is differentiated from other slant raising of the ground level, and its time of construction also is after that of others. In addition, the board-building development method used for narrow space is usually found in the remains since the seventh century. However, there are not enough the relics of Baekjae to reveal the whole aspect of building site development. It should be studied later through the subsequent excavation and research.

  • PDF

A Study on the Investigation of Application in Construction Field of Strength Prediction Model using Maturity Method (적산온도를 활용한 강도예측모델의 건설생산현장 적용성 검토에 관한 연구)

  • 주지현;장종호;김재환;길배수;남재현;김무한
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2004.05a
    • /
    • pp.101-104
    • /
    • 2004
  • If predicting of compressive strength of construction in construction field at early age is possibile, rational strength management & schedule plan is possible. With method for predicting strength of concrete, many researchers have been making study of maturity method. On the other hand, nowadays rationalization of construction capacity and reduction of a term of works due to improvement of construction capacity and application of a new method of construction is gathering strength with important issue. In accordance with this present condition, construction is being progressed in winter, but proper construction mothed and countermeasure for strength management is not established in case of winter construction. Therefore to investigate application in construction field at winter of strength prediction model that developed at former study, this study aim to measure application of developed strength prediction model through manufacture of mock-up concrete according to kind of strength level at 5$^{\circ}C$.

  • PDF

A study on the comparison of a steel building with braced frames and with RC walls

  • Buyuktaskin, Almila H. Arda
    • Earthquakes and Structures
    • /
    • v.12 no.3
    • /
    • pp.263-270
    • /
    • 2017
  • In this study, two geometrically identical multi-storey steel buildings with different lateral load resisting systems are structurally analyzed under same earthquake conditions and they are compared with respect to their construction costs of their structural systems. One of the systems is a steel structure with eccentrically steel braced frames. The other one is a RC wall-steel frame system, that is a steel framed structure in combination with a reinforced concrete core and shear walls of minimum thickness that the national code allows. As earthquake resisting systems, steel braced frames and reinforced concrete shear walls, for both cases are located on identical places in either building. Floors of both buildings will be of reinforced concrete slabs of same thickness resting on composite beams. The façades are assumed to be covered identically with light-weight aluminum cladding with insulation. Purpose of use for both buildings is an office building of eight stories. When two systems are structurally analyzed by FEM (finite element method) and dimensionally compared, the dual one comes up with almost 34% less cost of construction with respect to their structural systems. This in turn means that, by using a dual system in earthquake zones such as Turkey, for multi-storey steel buildings with RC floors, more economical solutions can be achieved. In addition, slender steel columns and beams will add to that and consequently more space in rooms is achieved.

Application of fiber optic BOTDA sensor for measuring the temperature distributed on the surfaces of a building (빌딩표면에 분포된 온도를 측정하기 위한 광섬유 BOTDA센서의 적용)

  • Kwon, Il-Bum;Kim, Chi-Yeop;Park, Man-Yong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2002.10a
    • /
    • pp.505-510
    • /
    • 2002
  • We have focused on the development of a fiber optic BOTDA (Brillouin Optical Time Domain Analysis) sensor system in order to measure temperature distributed on large structures. Also, we present a feasibility study of the fiber optic sensor to monitor the distributed temperature on a building construction. A fiber optic BOTDA sensor system, which has a capability of measuring the temperature distribution, attempted over several kilometers of long fiber paths. This simple fiber optic sensor system employs a laser diode and two electro-optic modulators. The optical fiber of the length of 1400 m was installed on the surfaces of the building. The change of the distributed temperature on the building construction was well measured by this fiber optic sensor. The temperature changed normally up to 4℃ through one day.

  • PDF

The Management Method for Preventing Frequent Defect about Each Inspection Part from The Data Analysis of Pre-qualification of Residential Building Reconstruction (주택 재건축 예비평가 자료분석을 통한 분야별 주요결함의 예방·조치방안)

  • Kim, chun hag;Bae, cheol hak
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.181-186
    • /
    • 2008
  • The purpose of this study is analyzing the frequent defect about each inspection part of Pre-qualification of residential building reconstruction and finding the cause of occurrence so that can supply a solution of the problem during the plalnning and constructure. The frequent defects are naturally following the deterioration and more occur in the structure body than a skin. The meaning that supply the cause and the managing method for preventing frequent defects about each inspection part is as follows. To prevent the defects, it is needed that the choice of the appropriate materials, giving a sufficient space for facilities, reliable constructure for the part of expecting the defects. The quality of life will go up due to making a good dwelling environment and extending the life cycle of structures from the inspection and managing the part of expecting defects.

  • PDF

Basic Study of Distribution Management Model of the Free-Form Concrete Panels (SCM 기법에 의한 비정형 콘크리트 패널의 공급관리 모델 기초연구)

  • Cho, Wonhyun;Na, Youngju;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.115-116
    • /
    • 2016
  • Numerous of free-form buildings come up with external appearances using various types of free-form panels. If the panel types produced, transport and installation order and maintenance history are not properly managed, it is difficult to complete a given project successfully. For free-form building projects that satisfy 5 factors (proper time, place, price, product and quantity), a supply chain management technique is applied for distribution management of free-form concrete panels. In addition, the study listed the whole production process of free-form concrete panels and any necessary information, and suggested a basic model for the management. The study result will be a great help in effective distribution management of free-form panels for free-form building projects.

  • PDF

A Fundamental Study on the Comparison of As-Planned with As-Built of Free-form Building Skins Using Laser Scanning Technology (Laser Scanning 기술을 이용한 비정형 건축외피의 As-Planned와 As-Built 비교에 관한 기초적 연구)

  • Kwen, Soon-Ho;Shim, Hyoun-Woo;Jang, Hyoun-Seung;Ock, Jong-Ho
    • Korean Journal of Computational Design and Engineering
    • /
    • v.16 no.2
    • /
    • pp.126-136
    • /
    • 2011
  • The existing approaches to freeform building construction cause many problems. However, recent BIM technique development based on parametric modeling method and improvement of freeform materials manufacturing technology using IT technology encouraged many advanced countries to try experimental projects. Thus, laser scanning technique is in the limelight as a new alternative in the field of freeform building construction and inspection. This study selected a domestic small freeform building and practiced laser scanning and as-planned modeling by using Reverse Engineering. Then each deviation was comparatively analyzed through figures which extracted data by numerically analyzing the newly modeled as-built and Excel spread sheet. Through the process, limits and follow-up research subjects are discussed as well.