• Title/Summary/Keyword: building scope

Search Result 402, Processing Time 0.02 seconds

Direction of CM Services Defect Liability in the CM Contract

  • Cho, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.3
    • /
    • pp.209-217
    • /
    • 2013
  • The execution of a construction project involves the engagement of many participants. Generally, the Authority uses CM to certify that the Work is built according to the contract documents. The CM work scope is expressed in the Construction Technology Management Act and its Regulation. The mandated and delegated CM services are limited to the construction period. If Contractor is required to repair a construction defect, the Contractor should bear the burden of the inspection service for the defect repair, because it is associated with him. Nevertheless, CM should submit a bond to provide the inspection and supervision service for the defect repair. These may result in conflict with each liability. Therefore, CM service in the law and regulation was investigated and analyzed in this study to classify the characteristics of CM contracts, and it was suggested that the CM liability for the inspection and supervision service for the defect repair should be reconsidered.

The Pilot Study of the structural design based on the Building Information Model(BIM) (Building Information Model(BIM) 기반의 건축 구조설계 Pilot Study)

  • Shin, Tae-Song;Cho, Young-Sang;Cheon, Jin-Ho;Eom, Jin-Up;Yang, Jong-Min
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.265-268
    • /
    • 2008
  • With application of IT convergence technique in AEC industry, it is currently conducted the research on the virtual construction system. This paper aims at the pilot study on the structural design based on BIM used in collaboration environment. The work scope of structural design includes the structural analysis model, structural detail model and analytic model and we focuse the research on the interoperability among them. It is partly utilized the transfer module supplied by software developer and partly developed here the interface module through API. This paper shows the interoperability process to pilot test and indicates the problems occurred in interface.

  • PDF

Fundamental Properties of Controlled Low Strength Materials Mixed Blast Furnace Slag and Sewage Sludge (고로슬래그미분말 및 하수슬러지를 혼입한 시멘트계 저강도 재료의 기초적 물성)

  • Kim, Dong-Hun;Park, Shin;Lim, Nam-Gi
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.53-54
    • /
    • 2015
  • As the result of uniaxial compression strength test on the CLMS mixing BFS and SS with BFS 4000, it required to determine the desired strength through increasing unit quantity of cement in mixing process because of dramatic strength deterioration of strength according to increasing replacing rate. In this study's result, regardless of differences in fine aggregates used, in order to get uniaxial compression strength in the scope exceeding criteria of minimum strength for applying to the field, the most reasonable combination was to mix replacing BFS with fineness of 6000 in 30%. For the CLMS mixing BFS and SS, in order to improve flow ability by securing quantity of minimum unit and to repress bleeding rate with securing uniaxial compress strength considering the field applicability, regardless of differences in fine aggregates used, to mix BFS over 6000 in 30% was most effective.

  • PDF

A Comparative Analysis on the Work Importance of Customized and Expansion Remodeling Project (맞춤형 및 증축형 리모델링 공사의 업무중요도 비교·분석)

  • Kim, Min-Jae;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.66-67
    • /
    • 2015
  • This study compared and analyzed the job importance that site managers perceived by dividing the study scope into customized and expansion remodeling projects and deriving the job descriptions from previous studies. As a result, a total of 7 construction stages and 53 job descriptions were derived. As job importance in customized remodeling projects, removal and demolition works were the most important, followed by preliminary survey, and repair and reinforcement works. In addition, as job importance in expansion remodeling projects, preliminary survey is the most important, followed by civil engineering work, and repair and reinforcement works. It is considered that the job importance of the remodeling projects derived in this study will contribute to improving their job efficiency in the future.

  • PDF

Performance Analysis of SMART Frame Applied to RC Column-Beam Structures (RC 라멘조에 SMART Frame 적용 시 효용성 분석)

  • Cho, Wonhyun;Lim, Chaeyeon;Jang, Duk Bea;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.168-169
    • /
    • 2015
  • SMART Frame is a composite precast concrete structure system to deliver the advantages of both steel frame and reinforced concrete. Many studies have established to date that SMART Frame is more advantageous than conventional frame-type structure in terms of structural stability, constructability, economic viability as well as reduction of construction schedule. However, such studies have focused primarily on wall-type or flat slab-type apartment housing structures, failing to include Rahmen structures in their scope. Accordingly, this study aims to analyze the benefits of potential application of SMART Frame to RC Rahmen structures. As the structural stability and constructability of SMART Frame is already proven, this study reviews its benefits from the perspective of cost reduction. Conclusion of this study will be used subsequently in predicting the benefits of SMART Frame when it is adapted to RC Rahmen structures.

  • PDF

A Study on Development and Application of Waterproofing and repair material mixed Ruberic Asphalt Component With Adhesive and Swelling Performance (콘크리트 구조물의 누수방지를 위한 점착.팽창성 유연형 도막방수재의 개발 및 적용에 관한 연구)

  • 오상근;곽규성;이성일;강혜정
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.05a
    • /
    • pp.65-68
    • /
    • 2002
  • This study of concrete movement confronting a scope inspects the problems about the waterproofing method and leakage/repairement at present and research the mechanism with the variety of applying examples introducing adhesion and inflation using the flexible type of waterproofing and repairement and the substitution method developed with polymer resign composite. The polymer resign transmitted into adhesion or inflation materials under wet environment absorbs adjoining moisture, wraps impurities of concrete surface. get the waterproofing layer and concrete surface adhere toughly, reorganizes the impaired waterproofing layer and get over the detachment of it from concrete surface.

  • PDF

A Study on Prototype of Just In Time Production Management System (적시생산 관리시스템에 관한 연구 - 철근공사를 중심으로 -)

  • Lee, Kyoo-Hyun;Choi, In-Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.4 s.18
    • /
    • pp.153-164
    • /
    • 2005
  • This study aims at establishing JIT production management system to enable manage the resources input into from procurement through construction based on correct identification of the process, an analysis on the amount of input materials and information sharing. This study has focused on the process control and working process of rebar work in domestic apartment house construction where the overall scope of Process from the planning phase to the construction phase has been analyzed in this study. Also construction phase was selected for the application of a sample case. A basic model for JIT production was generated with these processes. Furthermore A questionnaire and the on-site survey with process, checklist and control data were prepared and performed for the application of JIT production management model into rebar work. The governing scopes of JIT production management system include process management, material management, yard loading and moving management and inventory control, and the operation of each control item

A Study on Severe Accident Management Capabilities and Strategies for CANDU Reactor (가압중수로형원전의 중대사고 대응능력 연구)

  • Choi, Young;Park, Jong-Ho
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.5
    • /
    • pp.160-165
    • /
    • 2014
  • The realistic cases causing severe core damage should be analyzed and arranged systematically for preparing an accident management of the specific nuclear power plant. The objective of this paper is to establish basic technical information for reactor safety and reactor building integrity management strategies in CANDU reactor severe accident. For the development of severe accident management strategies, plant specific features and behaviors must be studied by detailed analysis works. This analysis scope will serve to cover overall methods and analyzing results to understand the reactor building integrity status in the most likely severe accident sequences that could occur at CANDU reactor. Also analysis results could help prevent or mitigate severe accidents for the identification of any plant specific vulnerabilities to severe accidents using the probabilistic safety assessment (PSA) quantified results.

Process Model for development of EVMS in Nuclear Power Plant Project (원전건설 성과관리시스템(EVMS) 개발을 위한 프로세스 모델 연구)

  • Kim, Yun-Myung;Won, Seo-Kyung;Shin, Il-Sub
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.58-59
    • /
    • 2014
  • EVM(Earned Value Management) is a management methodology for integrating scope, schedule and resources, and for objectively measuring project performance and progress. EVMS(Earned Value Management System) has been used for the performance measurement of R&D and construction projects in developed countries such as United States, United Kingdom and Australia. The nuclear power plant (NPP) projects in Korea have not applied EVMS. However, EVMS has come into request for overall schedule and cost risk management and performance measurement in overseas project of the nuclear power plant as a contractor. In this paper, based on the global EVMS guidelines, EVMS per unit processes have been developed for NPP projects. Moreover, using Business Process Management (BPM), it proposes an integrated process model with tasks, roles, and procedures for EVMS for NPP construction projects.

  • PDF

Analysis of Phase Change Materials for Production of Changable Mold for Free-form Concrete Segment (FCS 가변형 몰드 생산을 위한 PCM 분석)

  • Lee, Donghoon;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.150-151
    • /
    • 2014
  • A mold of free-form concrete segment can be used only one time. Thus, the construction duration and cost are increased. The materials of the mold such as wood and metal have limitations due to the implementation and reuse. The review of the material of the mold for free-form concrete segment is needed to reduce duration and production cost. Phase change material can be used both to implement free-shape by heating and to produce mold after cooling. After using Phase change material can be re-used to mold by heating. The scope of this study is many kind of phase change materials for molding. The aim of this study is to analyze the phase change materials for production of changable mold for free-form concrete segment. In this study, the paraffin wax that is melted at 64℃ was selected by considering both the energy efficiency and the weather of Korea.

  • PDF