• Title/Summary/Keyword: building scope

Search Result 402, Processing Time 0.024 seconds

Improvement of Early age Concrete Strength Using Blast Furnace Slag Powder (콘크리트의 초기강도 향상을 위한 고로슬래그 미분말의 사용에 관한 실험적 연구)

  • Yoo, Jang-Won;Lee, Ju-Sun;Park, Byung-Kwan;Pei, Chang-Chun;Han, Min-Cheol;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.77-80
    • /
    • 2009
  • The purpose of the study was to examine engineering characteristics due to fine particle cement and gypsum contents to improve early strength of concrete substituted blast furnace slag powder. The results were as follows. Above all, For fluidity, generally all mixtures had lower fluidity than Plain mixture and was not satisfied target scope, but for mixture substituted the gypsum showed a little increasing trend. For air content, generally all mixtures compared to Plain mixture had decreasing tendency. However, all mixtures were satisfied target scope. For compressive strength, long-term strength was better than early strength according to ternary blast furnace slag contents was increased. For complex mixture was better than individual use of gypsum and fine particle cement.

  • PDF

Suggestions for Sustainable Construction Project Management (지속가능한 건설사업관리를 위한 발전방안)

  • Lee, Seung-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.240-241
    • /
    • 2021
  • For the sustainable development of the domestic construction project management field, each CM company should try to diversify in terms of service contract types and scope of work while having internationally competitive technical and service capabilities as follows. First, from the initiation of the service to the completion, the CMr should be able to establish and execute a plan to create specific outcomes. Second, CMr must have the capability to produce weekly or monthly cost, schedule, risk, and scope management reports. In addition, it should be possible to apply the cost plus sliding fee method or to systematically and continuously accumulate and process data generated during the construction process.

  • PDF

Legislation feasibility studies for expanding the business scope of paramedics: Focused on high level task in importance, need and allowance (응급구조사 업무범위 확대를 위한 입법 타당성 연구 : 중요도와 필요도 및 허용도가 높은 업무를 중심으로)

  • Han, Song-Yi;Ji, Hyun-Kyung;Yoon, Seong-Woo;Lee, Chang-Hee
    • The Korean Journal of Emergency Medical Services
    • /
    • v.19 no.3
    • /
    • pp.117-138
    • /
    • 2015
  • Purpose: This study was performed targeted to paramedic and doctors, to examine the frequency, importance, and admissibility of the tasks of paramedics, and to establish as a basis for expanding their business scope. Methods: The subjects were 282 paramedics and 58 doctors, and the study was performed from October 20 to November 19, 2014. The statistical analysis was done by using SPSS/WIN 20.0. Results: The results showed the difference between the legal business scope of paramedics and the actually performed work. The frequently covered areas were trauma, cardiac arrest, and respiratory care; however, severity classifications were the most important. Concerning drug administration, epinephrine administration seemed to be the most necessary. Conclusions: The findings of this study can be used as basic data to broaden the capacity building and business scope of paramedics. Furthermore, to increase the resuscitation rate of emergency patients, the various tasks of paramedics must be incorporated, and these should be supported by laws and institutions.

Comparison and Analysis of Domestic and Foreign Building Energy Rating Systems (국내외 건물 에너지성능 인증제도 비교, 분석)

  • Song, Seung-Yeong;Lee, Soo-Jin
    • Journal of the Korean Solar Energy Society
    • /
    • v.27 no.4
    • /
    • pp.77-85
    • /
    • 2007
  • With the increase in the demand for sustainable and environment-friendly development all over the world, it becomes an urgent issue for Korea to reduce $CO_2$ emission. Since building industry accounts for about 40% of international energy and resource consumption and $30{\sim}40%$ of $CO_2$ emission, it is essential to prepare for energy-efficient building. This study aims to seek for improvement direction for a domestic Building Energy Efficiency Rating System through the comparison with foreign systems. Two foreign building energy rating systems which have the similar application scope with domestic one, HERS(Home Energy Rating System) and SAP(Standard Assessment Procedure)2005 were selected. As compared with foreign systems, we intended to suggest improvement direction for effective application of Building Energy Efficiency Rating System in Korea.

Comparison Analysis of BIM Level in the Domestic and Overseas BIM Projects - Focused on BIM Journals and Award Winning Projects - (국내·외 BIM 적용 프로젝트의 BIM 적용수준 비교분석 - BIM 저널 및 Awards 수상작 사례를 중심으로 -)

  • Koh, Sung-Hoon;Ham, Nam-Hyuk;Lee, Joo-Sung;Yoon, Su-Won;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.7 no.2
    • /
    • pp.25-35
    • /
    • 2017
  • Building information modeling (BIM) can improve to communicate with project participants by early construction involvement (ECI) from the beginning of the project. Therefore, they can minimize design changes and improve design quality and construction. However, because there is insufficient research on the scope and application level of BIM according to project delivery system and project characteristics, construction companies have efficiently not been using the BIM. Therefore, this study intends to conduct basic research as a basis for confirming appropriate BIM application and level according to project delivery system and project characteristics. To do this, we investigated the project delivery system and project characteristics of domestic and foreign projects that have successfully applied BIM, and compare and analyze them based on BIM application and BIM level framework derived from theory reviews and experts. Therefore, this study can be used as a basis for strategically establishing the scope and level of BIM according to project delivery system and project characteristics through the result of this study.

Establishment of the Repair Cycle of the Components of the Apartment Housing

  • Lee, KangHee;Ahn, YongHan;Chae, Chang-U
    • KIEAE Journal
    • /
    • v.14 no.2
    • /
    • pp.69-75
    • /
    • 2014
  • Building has been deteriorated over the year after construction. The deterioration has caused to hinder the living condition and to decrease the building value. Thus, it is important to prevent or delay the building deterioration as well as to proceed the maintenance. The long-term repair program for the apartment in Korea plays a key role to make the repair plan after construction and to assure the function decent. This is not flexible to the change of the material and component because the program is provided by the Korean-law. Many items are omitted in the long-term program so that the maintenance experts face many difficulties to make a repair plan. In this paper, it aimed at providing the repair cycle and repair ratio according to the repair scope, which are not provided in the current program. This study shows that the repair ratio is presented with quartile range in 25%, 50%, 75% and 100%. This has an advantage to take an overall look in repair items. Under this presentation of the repair ratio, each item has a unique repair value. Second, the repair scope is divided into partly repair, fully repair, partly alteration and fully alteration. If a fully repair has a repair ratio close to 100%, it would mean that a fully repair is a fully alteration. Third, the short repair cycle means that it requires to maintain the function or performance of the components in a short term.

A Study on Forecasting the Repair Time Range of the Building Components in the Apartment Housing (공동주택 구성재의 예상수선시기 범위 설정 연구)

  • Lee Kang-Hee
    • Journal of the Korean housing association
    • /
    • v.17 no.2
    • /
    • pp.19-26
    • /
    • 2006
  • Building would be deteriorated with time elapse, influenced by its geographic situation, climate and other environmental conditions. In addition, the systematic maintenance could be provided to keep the resident a recent living condition. The existing breakdown maintenance will be changed into the preventive maintenance. The preventive maintenance is required to get the repair time, the repair scope and frequency. In this paper, it aimed at providing the repair time range over the building components, utilizing the relation between the determination curve and the performance recovery through repair. Results of this study are as follows : First, the forecast of the repair time over the building components could be calculated and equalized with the deterioration and performance degree. Second, the repair time range of building components would be provided into five categories and 3rd repair time. Results of this study will set up the long-term repair plan of building, and finally keep an housing condition comfortable.

The Estimation of the Energy Consumption and $C0_2$ Emission at the Construction Stage in the Apartment Housing (공동주택 건설단계 공종별 에너지소비량 및 이산화탄소 배출량 산정연구)

  • Kim, Dae-Hee;Kwon, Bo-Min;Choi, Young-Oh;Lee, Kang-Hee
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2006.11a
    • /
    • pp.328-333
    • /
    • 2006
  • A few methodologies have been recently developed to estimate the environmental affect when various materials and components are used in building life cycle. The direct survey method has limitations to analyze the environmental problems because of the limit of survey scope and cost. Therefore, another indirect method has been developed as alternatives. The indirect method is represented as input-output analysis. This paper aimed at analyzing the estimation the environmental affect of building materials and works at building construction, utilizing the input-output analysis as a indirect estimation method. The results suggested that the building works is overally responsible for the energy consumption and $CO_2$ emission. In other words, Over the 80% of the total consumption and $CO_2$ emission are resulted at the building work.

  • PDF

Operation Direction of Regional Architectural Safety Center through Analysis of Japanese Building Confirmation System (일본의 건축확인제도 분석을 통한 지역건축안전센터의 운영 방향 설정)

  • Baek, Cheong-Hoon;Kim, Eun-Young
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.5
    • /
    • pp.11-20
    • /
    • 2018
  • To prevent illegal building work in advance, regional building safety centers were introduced to perform technical investigations and management. The purpose of this study is to propose the detailed operational directions of the regional building safety center through the analysis on the current status of parameters, such as the operation of designated confirmation and inspection bodies in Japan. We consider the role, building administrative process and establishment criteria of regional building safety centers through the analysis the introduction background and the designation criteria of designated confirmation and inspection bodies. In establishing the center's professional manpower qualifications, we refer to the criteria for the professional qualifications of the designated confirmation and inspection bodies. In addition, the calculation method of required manpower of verification inspectors in Japan was used as a reference in setting the scale of regional professional manpower. Finally, we propose the detailed operational directions of the regional building safety center such as (1)roles of the center, (2)establishing management plan of the center, (3)work scope (4)scale of the professional manpower, (5)qualification of the professional manpower, and (6)funds.

Application of Classification of Object-property Represented in Korea Building Act Sentences for BIM-enabled Automated Code Compliance Checking (BIM기반 설계 품질검토 자동화를 위한 건축 관련 법규문장의 객체 및 속성 표현에 대한 체계화 접근방법)

  • Shin, Jaeyoung;Lee, Jin-Kook
    • Korean Journal of Computational Design and Engineering
    • /
    • v.21 no.3
    • /
    • pp.325-333
    • /
    • 2016
  • This paper aims to classify objects and their properties represented in Korea Building Act sentences for applying to BIM-enabled automated code compliance checking task. In order to conduct automated code compliance checking, it is necessary to develop translation process of converting the building act sentences into computer-executable forms. However, since Korea building act sentences are written in natural language, some of requirements are ambiguous to translate explicitly. In this regard, the building act sentences regarding building permit requirements are analyzed focusing on the regulation-specific objects and related properties representation from noun phrases within the scope of this paper. From 1977 building act sentences and attached reference regulations, 1200 regulation-specific objects and about 220 related properties are extracted and classified. In the application for the classification, object-property database is implemented and some of application using the database and the regulation-specific classification is suggested to support to generate rule set written in computable codes.