• Title/Summary/Keyword: building safety

Search Result 3,024, Processing Time 0.024 seconds

A Study on the Fire Safety of High-rise Office Buildings in Respect of Architectural Design (고층 사무소건축의 화재안전에 관한 건축계획적 연구)

  • 이강훈
    • Fire Science and Engineering
    • /
    • v.8 no.2
    • /
    • pp.3-15
    • /
    • 1994
  • The purpose of this paper is to present refernce data to be considered in designing for the fire safety of high-rise office buildings. This paper deals with the characteristics of high-rise office buildings in the fire safety aspects, the basic principles for the fire safety of high-rise office building design, and this study is focused particularly on the location of the escape route of core plan for fire safety in high-rise office buildings.

  • PDF

Safety Management Improvement Plan in Construction Project (건설사업 관리의 안전관리 향상 방안에 대한 연구)

  • Kim, Min-Seok;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.115-116
    • /
    • 2012
  • The number of safety accidents of the construction industry is higher than other industries. To prevent the accidents from hazard factor, the employees are variously trained in avoiding an accident. Also many studies have been conducted to reduced the safety accident. But most of these studies are limited to institutional complements. This study proposes safety management improvement plan of safety management through case studies.

  • PDF

Development of Safety Strap to Prevent Fall Accidents (추락 사고 방지를 위한 안전대 개발)

  • Lim, kyeongmin;Jang, Myunghoun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.159-160
    • /
    • 2021
  • Every year on a construction site safety scale of the crash of an accident, but the large and small, accounting for more than half. In Construction Field wearing safety belts for their safety, but the impact of fracture, including the risk of injury occurs. Accordingly, the death as well as by the crash, injuries that can reduce the size of the invention was driven by safety belts.

  • PDF

A study on the Comparison of High-rise building Egress Safety Rule in Countries for improvement of High-rise evacuation safety design criteria (초고층 피난안전설계 기준 개선을 위한 국내외 피난관계법령 비교에 관한 연구)

  • Hwang, EunKyung;Park, SuRoh
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.4
    • /
    • pp.429-438
    • /
    • 2013
  • In this study, compare and analyze for high-rise evacuation safety design criteria improvement about internal high-rise building egress safety rule. To the result, high-rise evacuation safety design criteria improvement data can be summarized as follows. First, should compute the evacuation capacity about the number of persons and when more than 2 exits are requested, over 50% of evacuation capacity must be satisfied even approaching to 1 exit is unable. Second, 2 ways of evacuation can be made smoothly by the stair or exit separation-distance standard regulation. Third, regulate the length limitation of dead-end corridor or passageway and it should give grades in limitation of whether the spring-cooler has been installed. Fourth, must secure the evacuation way and do the evacuee guidance when it's safety area and elevator or stair. Also needs to provide extra safety area to secure horizontal direction Escape Safety except fire escaping floor.

A Study on Applying 3D Automatic Displacement Measurement System for Safety Monitoring of Building Demolition Works (건축물 해체공사 안전 모니터링을 위한 3차원 자동변위계측 시스템 활용 방안 연구)

  • Park, Han-Bin;Han, Hye-Rim;Kim, Taehoon;Cho, Kyuman;Cho, Chang-Geun;Kim, Hyeong-Ki
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.229-230
    • /
    • 2022
  • According to the national building status, there are a total of 2.89 million buildings that are over 30 years old after completion, and the number is increasing by more than 70,000 to 80,000 buildings every year. As a result, the demand for demolition works is also increasing, and more than 3 to 4 collapse accidents occur steadily every year during demolition work. Major causes of accidents include non-compliance with plans, negligence of on-site supervisors, and failure to secure structural safety. Due to the strengthening of the Severe Disaster Punishment Act, there is growing interest in the demand for secure management of collapse detection during demolition works. Therefore, this study aims to investigate the applicability of real-time safety monitoring systems using a total station capable of 3D automatic displacement measurement in building demolition work for securing structural safety by the load changes during the demolition process.

  • PDF

The Study on the Comparison of Building Use Classification between Building Act and Installation.Maintenance & Safety Management of Fire-Fighting System Act (건축법과 소방시설 설치유지 및 안전관리에 관한 법령간 건축물 용도분류체계 비교 연구)

  • Hwang, Eun-Kyoung
    • Fire Science and Engineering
    • /
    • v.23 no.4
    • /
    • pp.112-119
    • /
    • 2009
  • Building use classification is classified the building types according to the similar structure, the goal of the use, and its shape. The important reason of building use classification is that building restrictions are applied according to building use classifications. But there are a lot of confusion because the building use classification is regulated not only by the Building Act but also by the several individual Act. Particularly in the large-scaled, high-raised and complex building construction, it is very important to remain the consistency of the building use classification between the Building Act and the Fire-Fighting System Act for safety of occupants. So the purpose of this study is to suggests the improve direction of the building use classifications through the comparative analysis of the Building Act and the Fire-Fighting System Act.

A Study on the Evacuation Time by the Influence of Decreasing Visibility on Fire (화재시 가시도 변화에 따른 대피속도 산정에 관한 연구)

  • Rie, Dong-Ho;Park, Jong-Seung
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.5
    • /
    • pp.21-26
    • /
    • 2007
  • The computer program is developed to simulate the evacauation time for a building which is made geometrically complex. The program is intended for use both as a search and a design tool to analyze the evacuation safety through a wide range of structure environments. The computer program has a function of importing FDS's result to each individual resident in the building. These attributes include a walking speed reduction by producing visibility reduction for each person on the fire. $A^*$ pathfinding algorithm is adopted to calculate the simulation of escape movement, overtaking, route deviation, and adjustments to individual speeds due to the proximity of crowd members. Finally, a case study for a theater is presented to compared the calculated evacuation time with SIMULEX in detail. This program contribute to a computer program that evaluates the evacuation time of individual occupants as they walk towards, and through the exits especially for building, underground spaces like a subway or tunnel.

The inspection and seismic design method of electrical facility instated in the building (건축물에 시설되는 수변전설비 내진설계 및 검사 방법에 관한 연구)

  • Kim, Gi-Hyun;Lee, Sang-Ick;Kang, Min-Hee;Bae, Suk-Myong
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2009.05a
    • /
    • pp.332-335
    • /
    • 2009
  • Incase of not considered seismic design at transformer vault which is made of many informant electrical facility, facility is damaged, electrical fire breaks out and second damage is able to break out at generating earthquake. But seismic design yet is not applied to at transformer vault in the country. Regard to seismic design method of electrical facility installed in the building internal, we present the seismic design of electrical facility using "Building construction design standard" in internal and "Manual of seismic design and construction for Building Electrical facility" in japan. This paper will be used detail seismic design of pipe and facility. reliability inspection plan for seismic design and construction of electrical facility

  • PDF

A Study on the Improvement of Human Safety Standards Considering Fire Cases in High-rise Residential Facilities (고층 주거시설 화재사례를 고려한 인명안전기준 개선방안에 관한 연구)

  • Cho, Hwi-Je;Lee, Byeong-Heun;Kwon, Young-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.106-107
    • /
    • 2021
  • The fire in Ulsan in 2020 was a 33-story residential and commercial complex with about 90 injuries and more than 10 billion won in property damage, and considering the recent increase in high-rise residential and commercial complexes, the risk of similar fires is high. As can be seen through the residential and commercial complex fire case in Ulsan, life-based fire safety standards need to be established to minimize casualties. Therefore, the purpose of this study is to draw improvements for the development of human safety standards for high-rise residential facilities in the future through comparison with the Korean Building Act, Firefighting-rellated Acts and the U.S. NFPA 101.

  • PDF

A Study on the Analysis of Simulation for Improvement Evacuation Safety Assessment of Building in Fire (건축물의 화재 시 피난안전성 평가 개선을 위한 시뮬레이션 분석 연구)

  • Kim, Hye-won;Kim, Yoon-Seong;Lee, Byeong-Heun;Jin, Seung-Hyeon;Koo, In-Hyuk;Kwon, Young-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.107-108
    • /
    • 2020
  • There is a need to analyze various factors in evacuation safety assessment of building in fire. In the current performance based design, evacuation safety assessment in case of fire is being conducted through the simulation as FDS and Pathfinder. However, the location and size of the door, the location of evacuation in the event of a fire are not considered when design. Accordingly, it is difficult to determine the worst case scenario considering the actual fire. Therefore in this study, in this study, we will propose an appropriate evaluation plan through simulation considering the worst-case scenario that may occur in case of fire.

  • PDF