• Title/Summary/Keyword: building phase

Search Result 1,026, Processing Time 0.035 seconds

Experiences of Mothers Participating in Consultant Training to Build an Early Childhood Education Community: Changes in Self-Awareness (유아교육공동체 구현을 위한 컨설턴트 양성과정 참여 어머니의 경험: 자기 인식의 변화)

  • Chung, Kai-sook;Park, Hee-kyung;Son, Hwan-Hee
    • Korean Journal of Childcare and Education
    • /
    • v.15 no.4
    • /
    • pp.83-113
    • /
    • 2019
  • Objective: The purpose of this study was to examine the experiences of mothers who participated in the training of consultants for the purposes building an early childhood educational community. Methods: Participants were 14 mothers in the first phase, 10 mothers in the second phase, and 8 mothers in the third phase. Data were collected from stories shared during the learning community activities. The mothers' experiences were analyzed according to qualitative analysis procedures. Results: Mothers' experiences of participating in the training of consultant for building early childhood educational community were categorized into three themes and seven sub-themes. The first theme was "self as a parent" including "looking inside myself in the parent-child relationships" and "looking inside myself in the relations with other mothers". The second theme was "self as a member of the community" which consisted of "sharing emotions through ritual", "forming communitarian identity through hospitality and solidarity" and "growing as a social mother". The third theme was "self as a educational community consultant" out of which emerged "setting up shared visions", "building practical community competence", and "creating fields of community implementation". Conclusion: The results suggested there are implications for the effective practices of building an early childhood education community and the direction and methodology of parent education.

Building Commissioning Management Framework from the Case Study of Green Building (녹색건축물인증(LEED) 사례연구를 통한 커미셔닝 관리 프레임워크 도출)

  • Jeong, Jin-Hak;Park, So-Yeon;Song, Dong-Hun;Ahn, Yong-Han
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.8
    • /
    • pp.23-30
    • /
    • 2018
  • A necessity of increasing the energy efficiency of the buildings is rising due to global warming and high energy demands prices. Commissioning is an effective way to increase the energy efficiency of the building and reduce maintenance costs. In this study, a case study was conducted to derive the commissioning process of green building and propose management factors that can be used in domestic commissioning projects. The case was a university renovation project that received a LEED Glod certification and conducted the enhanced commissioning. The commissioning is divided into planning, design, construction, and post-construction phases. In the planning stage, commissioning company selection, commissioning goal setting, tasks and responsibilities for each subject are set. In the design phase, preparations are made for inspection and construction steps to prevent design errors. In the construction phase, problems are solved through periodic on-site inspections. In the post-construction phase, a final report with all the details of the commissioning will be created and future maintenance strategies will be proposed. Based on the findings of this study, it will be a basis for the management factors that can be used in the implementation of domestic commissioning projects.

A study on the Preconditions of Space Program Validation of Healthcare Architecture for Application of BIM Technology (병원건축의 BIM적용을 위한 공간프로그램유효성평가의 전제조건에 관한 연구)

  • Seong, Joonho;Kim, Khilchae
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.19 no.2
    • /
    • pp.19-30
    • /
    • 2013
  • Purpose: The planning and design of hospital generally requires the participation and consultation of skilled experts since it has more complex space program than any other buildings. Therefore, the BIM systems for the planning of hospital have been tried continuously. The purpose of this study is to identify the precondition for space Program validation of healthcare architecture based on BIM, which is recently receiving wide attention. Method: For this study, United States, Australia and Finland's guidelines were analyzed among the description space program validation system in 14 overseas BIM Guidelines. And the propose precondition that can be applied to healthcare architecture from among these description of space program validation items, target, process etc for General building. Result: 1) spatial program validation is the following four evaluation phase. Step 1: Standard setting phase Step 2: BIM model accuracy assessment phase Step 3: space validation phase Step 4: Performance evaluation phase 2) The standards for the building elements at Standards Setting stage is considered to the standards for the architectural elements of General building. 3) Healthcare Architecture Area calculation method is considered to be reasonable that borrowing the area calculation standard of general architecture according to the UIA of international standards. However, Be proposed of measuring method that reflect the efficiency of the design process step-by-step area calculation method. The performance assessment indicators of reflect the Hospital uniqueness have to developed. And the research needs to be carried out continuously according to the purpose for healthcare architecture of feature-oriented. Implications: In this paper like to understanding that precondition of space program validation considering the BIM. As a result, understanding to condition about step of the evaluation, the evaluation standards. Is expected to keep the focus on the development of performance indicators that reflect the uniqueness of the hospital for the efficient evaluation of the Hospital building.

Progressive collapse of steel-framed gravity buildings under parametric fires

  • Jiang, Jian;Cai, Wenyu;Li, Guo-Qiang;Chen, Wei;Ye, Jihong
    • Steel and Composite Structures
    • /
    • v.36 no.4
    • /
    • pp.383-398
    • /
    • 2020
  • This paper investigates the progressive collapse behavior of 3D steel-framed gravity buildings under fires with a cooling phase. The effect of fire protections and bracing systems on whether, how, and when a gravity building collapses is studied. It is found that whether a building collapses or not depends on the duration of the heating phase, and it may withstand a "short-hot" fire, but collapses under a mild fire or a "long-cool" fire. The collapse time can be conservatively determined by the time when the temperature of steel columns reaches a critical temperature of 550 ℃. It is also found that the application of a higher level of fire protection may prevent the collapse of a building, but may also lead to its collapse in the cooling phase due to the delayed temperature increment in the heated members. The tensile membrane action in a heated slab can be resisted by a tensile ring around its perimeter or by tensile yielding lines extended to the edge of the frame. It is recommended for practical design that hat bracing systems should be arranged on the whole top floor, and a combination of perimeter and internal vertical bracing systems be used to mitigate the fire-induced collapse of gravity buildings. It is also suggested that beam-to-column connections should be designed to resist high tensile forces (up to yielding force) during the cooling phase of a fire.

Building Error-Reflected Models for Collaborative Filtering Recommender System (협업적 여과 추천 시스템을 위한 에러반영 모델 구축)

  • Kim, Heung-Nam;Jo, Geun-Sik
    • The KIPS Transactions:PartD
    • /
    • v.16D no.3
    • /
    • pp.451-462
    • /
    • 2009
  • Collaborative Filtering (CF), one of the most successful technologies among recommender systems, is a system assisting users in easily finding the useful information. However, despite its success and popularity, CF encounters a serious limitation with quality evaluation, called cold start problems. To alleviate this limitation, in this paper, we propose a unique method of building models derived from explicit ratings and applying the models to CF recommender systems. The proposed method is divided into two phases, an offline phase and an online phase. First, the offline phase is a building pre-computed model phase in which most of tasks can be conducted. Second, the online phase is either a prediction or recommendation phase in which the models are used. In a model building phase, we first determine a priori predicted rating and subsequently identify prediction errors for each user. From this error information, an error-reflected model is constructed. The error-reflected model, which is reflected average prior prediction errors of user neighbors and item neighbors, can make accurate predictions in the situation where users or items have few opinions; this is known as the cold start problems. In addition, in order to reduce the re-building tasks, the error-reflected model is designed such that the model is updated effectively and users'new opinions are reflected incrementally, even when users present a new rating feedback.

Experimental Study of Cooling Energy Saving Verification Using Blinds and Phase Change Material(PCM) (창호 블라인드와 상변화물질 적용에 의한 냉방 에너지 사용량 절감효과에 대한 검토 연구)

  • Song, Young-Hak;Kim, Ki-Tae;Koo, Bo-Kyung;Lee, Keon-Ho
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.26 no.1
    • /
    • pp.26-31
    • /
    • 2014
  • This study looks into changing building energy use by application of phase change material (PCM). PCM does not need extra energy for operation and is used for reducing building energy use and, CO2 output by displaying semi-permanent effects after installation. It also is able to avoid the maximum electric power time-zone by inducing a time lag phenomenon of cooling and heating loads with high thermal capacity using latent heat. To verify the efficiency of blinds and PCM, tests about the PCM operation mechanism using air conditioning machinery and nocturnal panel cooling were done. In the test results of the case using PCM installation, a $45^{\circ}$ blind angle with machinery air conditioning and nocturnal panel cooling at the same time shows a 22 percent energy saving effect against general space. The test results of each case were compared and analyzed based on the blind and window opening settings. Finally, the energy reduction of existing buildings using PCM application was reviewed based on the final measurement results.

Preliminary Study on the utilization of BIM in modular building construction (모듈러 건축공사의 BIM 활용성 분석을 위한 기초연구)

  • Lee, Myung-Do;Lee, Chan-Woo;Lim, Hyun-Su;Kim, Tae-Hoon;Lee, Ung-Kyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.236-237
    • /
    • 2019
  • Building Information Modeling (BIM) and modular construction are regarded as important technologies that address several issues faced by the construction industry. However, the application guidelines for BIM in current modular construction projects are insufficient. This paper presents the preliminary work on the analysis of BIM utilization in a modular construction project; a five-point likert scale questionnaire was conducted to assess the necessity of BIM applications by the Necessity Index(NI) of nine categories(U1~U9) across two construction phases (onsite and offsite). The survey results indicate that applications for BIM based quantity takeoff for offsite phase(U4) as well as BIM modeling for module joint details(U8) were deemed to be the most necessary in each phase. The results of this study can be used as detailed guidelines for the integration of BIM in modular construction projects.

  • PDF

The problem of using BIM data for facility management (시설물 유지관리를 위한 BIM데이터 전달의 문제점)

  • An, Hyo-Kyung;Lee, Seul-Ki;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.139-140
    • /
    • 2012
  • Facility Management (FM) is a project phase to maintenance and to increase the qualities of product which is planned on the design phase and ensured on the construction phase. In addition, since the approximate time occupied in operation and maintenance phase is the longest from construction project as total approximate cost is about 85% of whole the project, it could be managed and realized primarily. The information of facility is not created on the specific point of project, but it might be created on the whole process of subject project widely. Thus, as the information could not be lost and it can be delivered into computer aided facility management system, it is necessary to manage the facility information. This paper proposed the necessities and the problems of BIM-based data interoperability on the Korean construction projects.

  • PDF

Analysis of Technical Requirement for Implementation of Multi-trade Prefabrication (Multi-trade Prefabrication 기법 적용을 위한 기술적 요구사항 분석)

  • Jang, Se-Jun;Lee, Ghang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.113-114
    • /
    • 2016
  • This paper proposes a technical requirements analysis of implementation of multi-trade prefabrication. Recently, there has been a rise in the use of prefabrication to minimize on-site work for time reduction to increase productivity. Prefabrication technique is evolved into multi-trade prefabrication combining other trades from single-trade prefabrication. For implementation of new technique, not only itself but complementary techniques have to be prepared. In this paper, MEP corridor rack, a major item of multi-trade prefabrication, was implemented in the test bed and its process was analyzed to find out technical requirements. As a result, comparatively high level of IT technique was required for efficient use of multi-trade prefabrication in design, lifting and construction phase. In design phase, component level of BIM library was needed for manufacturing; and in lifting phase, BIM-based site logistics process was required. Also in construction phase, laser scanning was implemented for gathering shape and geometry of the wall and slab that were attached to multi-trade prefabrication module.

  • PDF

Bacteria's Survival Curve on the Surface of Cement Composite (시멘트 복합체 표면의 자기치유 박테리아 생장 곡선)

  • Park, Ji Yoon;Jang, In Dong;Son, Da Som;Yi, Chong Ku
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.203-204
    • /
    • 2021
  • Bacteria used in self-healing concrete, which arrest the crack, helps increasing the durability is well known. However, the survival and activity of the bacteria are precisely unknown. In this research, to know the bacteria's survival curve on the surface of the cement composite, bacteria's survival curve has been measured by CFU at different curing days. The survival curve of 3 days and 7 days curing does not show the significant differences in their survival tendency. However, the slope of death phase of 7 days curing was steeper than the 3 days of curing. This research was focused on the death phase but for further research, set of interval time will be reduced and observe the lag phase and exponential phase.

  • PDF