• Title/Summary/Keyword: building period

Search Result 1,784, Processing Time 0.029 seconds

A Study on the Natural Period Estimation for the Buildings of Upper Wall and Lower Frame Type (상부벽식-하부골조를 가진 복합구조물의고유주기 산정에 관한 연구)

  • 박기수
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 1999.10a
    • /
    • pp.170-177
    • /
    • 1999
  • The natural period calculation equations specified in the current building code are empirical formulas that depend on height and material type of the structure. Building with the upper wall and lower frame type is a unique structure which composed of two different structural system This type of structure needs either the deep transfer girder or the thick transfer plate that brings the sudden change of stiffness and mass. Therefore the natural period equations recommended by the current code can not be applied directly. In this study the natural period of building with typical plan obtained by dynamci analysis is compared with that of various codes. Ad approximate estimation equation for the natural period of building with the upper wall and lower frame type obtained by regression analysis is recommended. by the current code can not be applied directly. In this study the natural period of building with typical plan obtained by dynamic analysis is compared with that of various codes, And approximate estimation equation for the natural period of building with the upper wall and lower frame type obtained by regression analysis is recommended.

  • PDF

A Study on the Acceleration Response Amplification Ratio of Buildings and Non-structural Components Considering Long-Period Ground Motions (장주기 지진동을 고려한 건축물 및 비구조요소의 가속도 응답 증폭비)

  • Oh, Sang Hoon;Kim, Ju Chan
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.27 no.1
    • /
    • pp.1-12
    • /
    • 2023
  • Structures of high-rise buildings are less prone to earthquake damage. This is because the response acceleration of high-rise buildings appears to be small by generally occurring short-period ground motions. However, due to the increased construction volume of high-rise buildings and concerns about large earthquakes, long-period ground motions have begun to be recognized as a risk factor for high-rise buildings. Ground motion observed on each floor of the building is affected by the eigenmode of the building because the ground motion input to the building is amplified in the frequency range corresponding to the building's natural frequency. In addition, long-period components of ground motion are more easily transmitted to the floor or attached components of the building than short-period components. As such, high-rise buildings and non-structural components pose concerns about long-period ground motion. However, the criteria (ASCE 7-22) underestimate the acceleration response of buildings and non-structural components caused by long-period ground motion. Therefore, the characteristics of buildings' acceleration response amplification ratio and non-structural components were reviewed in this study through shake table tests considering long-period ground motions.

Study on the Construction Method to Develop an Building Site After the Woongjin Period of Baekjae (백제 웅진기 이후 대지조성 공법의 연구)

  • Cho, Weon-Chang
    • Journal of architectural history
    • /
    • v.18 no.5
    • /
    • pp.25-39
    • /
    • 2009
  • The examples of developing a building site after the Woongjin period are mainly found in temple sites, tile-roofed building sites of unidentified features, and palace remains including the pavilion site with the river in the front(임류각지) inside the Castle of Gongsan, Gongjoo. In case of the Hanseong period, a glimpase of the features has gained in Poongnab mud castle and Mongchon mud castle, but the excavated relics are not yet enough to make some date out of them. After the Woongjin period of Baejae, the earth-ramming development method was used mostly to construct a building site, which is divided into horizontal and slant raising of the ground level. Both are used simultaneously, but there are the significant differences in the way of raising the ground level between them. Particularly, in case of the Wanggoong-ri relics in Iksan, the ground level was raised in a narrow line slantly, which is differentiated from other slant raising of the ground level, and its time of construction also is after that of others. In addition, the board-building development method used for narrow space is usually found in the remains since the seventh century. However, there are not enough the relics of Baekjae to reveal the whole aspect of building site development. It should be studied later through the subsequent excavation and research.

  • PDF

Seismic Retrofit of High-Rise Building with Deformation-Dependent Oil Dampers against Long-Period Ground Motions

  • Aono, Hideshi;Hosozawa, Osamu;Shinozaki, Yozo;Kimura, Yuichi
    • International Journal of High-Rise Buildings
    • /
    • v.5 no.3
    • /
    • pp.177-186
    • /
    • 2016
  • Along the subduction-zone of the western Japanese islands, large earthquakes are expected occur around the middle of this century, and long-period ground motions will reach major urban areas, shaking high-rise buildings violently. Since some old high-rise buildings were designed without considering long-period ground motions, reinforcing such buildings is an important issue. An effective method to reinforce existing high-rise buildings is installing additional dampers. However, a problem with ordinary dampers is that they require reinforcement of surrounding columns and girders to support large reaction forces generated during earthquake ground motion. To solve this problem, a deformation-dependent oil damper was developed. The most attractive feature of this damper is to reduce the damping force at the moment when the frame deformation comes close to its maximum value. Due to this feature, the reinforcement of columns, girders, and foundations are no longer required. The authors applied seismic retrofitting with a deformation-dependent oil damper to an existing 54-story office building (Shinjuku Center Building) located in Shinjuku ward, Tokyo, in 2009 to suppress vibration under the long period earthquake ground motions. The seismic responses were observed in the 2011 Tohoku Earthquake, and it is clarified that the damping ratio was higher and the response lower by 20% as compared to the building without dampers.

Application Period and Participants for Construction Engineering at the Design Phase in Tall Building Construction (초고층 건축공사 설계단계에서의 시공엔지니어링 업무 적용시기 및 수행주체 분석)

  • Lee, Jin Woong;Cho, Kyuman;Kim, Taehoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.179-180
    • /
    • 2017
  • In order to improve the constructability of tall building construction, there is increasing needs to derive the design output by performing construction engineering at the design phase. It contributes to minimizing wastes such as design changes and reworks as well as improving project performance. Therefore, in this study, we analyzed the application period and participants for engineering tasks derived from a previous study, and then regrouped to efficiently reflect them at the design phase. Considering similarity of application period and attributes, the existing 22 engineering tasks, which were classified into 5 factors, were reclassified into 13 groups. The results of this study can be used as basic data for efficient construction engineering execution at the design phase.

  • PDF

Characteristics of the influence of defect types and period of occurrence according to the type of tile work in an apartment house (공동주택 내 타일 공종에 따른 하자 유형과 발생기간의 영향 특성)

  • Pyeon, Su-Jeong;Kim, Gyu-Yong;Choi, Byung-Cheol;Kim, Moon-Gyu;Gill, Min-Woo;Nam, Jeong-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.67-68
    • /
    • 2022
  • The area inside the apartment building where tiles are installed is applied as a finishing material for walls and floors, including exterior walls, balconies, hallways, bathrooms, and kitchens. As it is constructed in various spaces, differences in the type and period of occurrence of tile defects may appear, which is caused by heterogeneous characteristics between materials and external causes. Therefore, in this study, two-way ANOVA was used to figure out the relationship between the defect occurrence type and the period depending on the type of tile construction in the apartment building.

  • PDF

Mathematical Algorithm for Members Erection Period of Beam-Column System PC Apartment Building (보-기둥구조 PC공동주택의 부재 조립기간에 대한 수학적 알고리즘)

  • Kim, Ki-Ho;Lee, Bum-Sik;Kim, Jin-Won;Lee, Dong-Gun;Kim, MIn-Jun;Sohn, Jeong-Rak
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.117-118
    • /
    • 2023
  • Estimating the construction period at the initial stage of the project and determining whether it is appropriate is very important for the developer's decision-making and the success of the construction company's business. Existing researchers have conducted various studies to calculate the appropriate construction period, but there is no study on the influencing factors and methodology for the construction period of beam-column PC apartment building frame construction. The purpose of this study is to calculate the PC member assembly time using the mathematical algorithm of PC member assembly. The results of this study can be used as basic data to calculate the construction date of the standard floor of PC construction.

  • PDF

Status and Problems of Buildings Neglected for Long Period after Discontinuance of Construction in Jeju (제주도내 공사중단 장기방치 건축물 현황과 문제점)

  • Kim, Doo-Seong;Han, In-Deok;Jang, Myunghoun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.153-154
    • /
    • 2023
  • Neglected buildings for long period can seriously reduce the durability of the building due to rust in rebars and deterioration in concrete quality due to exposure to outside air, and the seriousness of suspended buildings such as safety accidents and social crimes is emerging due to poor management. In this study, various problems such as the occurrence of safety accidents were analyzed through a fact-finding survey of buildings that have not been maintained due to long-term neglect in all areas of Jeju. In order to reuse a building that has been discontinued, the safety of the building structure itself must be checked. After securing safety through durability investigation, construction should be resumed or converted into a normal building through re-purposing, dismantling, remodeling, etc.

  • PDF

Effects of Isolation Period Difference and Beam-Column Stiffness Ratio on the Dynamic Response of Reinforced Concrete Buildings

  • Chun, Young-Soo;Hur, Moo-Won
    • International Journal of Concrete Structures and Materials
    • /
    • v.9 no.4
    • /
    • pp.439-451
    • /
    • 2015
  • This study analyzed the isolation effect for a 15-story reinforced concrete (RC) building with regard to changes in the beam-column stiffness ratio and the difference in the vibration period between the superstructure and an isolation layer in order to provide basic data that are needed to devise a framework for the design of isolated RC buildings. First, this analytical study proposes to design RC building frames by securing an isolation period that is at least 2.5 times longer than the natural vibration period of a superstructure and configuring a target isolation period that is 3.0 s or longer. To verify the proposed plan, shaking table tests were conducted on a scaled-down model of 15-story RC building installed with laminated rubber bearings. The experimental results indicate that the tested isolated structure, which complied with the proposed conditions, exhibited an almost constant response distribution, verifying that the behavior of the structure improved in terms of usability. The RC building's response to inter-story drift (which causes structural damage) was reduced by about one-third that of a non-isolated structure, thereby confirming that the safety of such a superstructure can be achieved through the building's improved seismic performance.

A Study on the Simple Payback Period Analysis of Small Co-generation System based on the Existing Apartment and Building Data (기존지역 잠재량조사에 기반한 소형열병합발전시스템의 경제성 단순분석)

  • Kim, Yong-Ha;Woo, Sung-Min;Kim, Mi-Ye;Lee, Sung-Jun;Son, Seung-Ki
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.55 no.11
    • /
    • pp.498-504
    • /
    • 2006
  • This paper describes the simple payback period analysis of small co-generation system based on the existing apartment and building data. First, We investigate apartment and building data more than $2000[m^2]$ using Ministry of Construction & Transportation's computer system. And then we calculate the latent amount of small co-generation system considering gas company and CHP. Second, we classify the latent amount of small co-generation system into office, hospital, hotel, department store, complex building and apartment. Finally, we perform the simple payback period analysis for small co-generation system. The results show the simple payback period of small co-generation system is less then 10 years.