• Title/Summary/Keyword: building owner

Search Result 181, Processing Time 0.022 seconds

A Study on Lee Gyu-Bo's Viewpoint on Architecture through Dongkukyisangkukjib ("동국이상국집"을 통해 본 이규보의 건축관에 관한 연구)

  • Kim Kyung-Hee;Kim Mi-Na
    • Journal of the Korean housing association
    • /
    • v.16 no.1
    • /
    • pp.1-9
    • /
    • 2005
  • The purpose of this study is to scrutinize forefathers' standpoint on architectural planning by peering into their literature. Dongkukyisangkukjib which contains works about daily life of Lee Gyu-Bo, a great writer in the middle of Koryo, reveals well people of Koryo' thought on architecture, if we have a interest in a building space. The book holds his general viewpoint on architecture and documents about the remarkable houses he and his friends visited. Then we can know, through it, general thought on architecture of the upper classes in those days. Lee Gyu-Bo considered a house the other self of its owner and connected buildings with personality of their owner. 0 architectural process and architectural planning, buildings were shown variously by reflecting owner's value on architecture. Unlike Chosun era, people of Koryo prefer unlimited thinking to form or order. Therefore in construction especially such as a pavilion, there were many experimental tries which reflected owners' thought. Particularly we could estimate people of Koryo' conception of architectural design through a work of Lee Gyu-Bo, Saryunjungky, a document about a pavilion carrying four wheels, which describes concretely contents of architectural planning such as a planning of space, module, and intention.

Development of Project Delivery System for Modular Building in Korea

  • Nam, Sung-hoon;Kim, Kyung-rai;Lee, Dong-gun;Heo, So-young
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.704-705
    • /
    • 2015
  • Recent research has been ongoing for modular buildings in the country, and interest increases. However, in accordance with legal restrictions in the country with regard to Project Delivery system of Modular Building, the activation of modular buildings industry is obstructed. In Korea, in accordance with national contract law, the construction contract is apply to the project delivery system of modular buildings, and in accordance with Framework Act on the Construction Industry, The project delivery system of modular buildings has to be a separate order. The definition of separate order in contract as defined in the law is that the electric work and Communication work and digestion facility work has to be separate each contract in order to be ensured professionalism. In accordance with law, the project delivery system of modular buildings is that the contract for construction is concluded with the Owner and the Construction Contractor and the contract for goods is concluded with the construction Contractor and modular manufacturer. Due to these project delivery system, the domestic factory production rate when making a modular unit is significantly reduced compared to the rate of factory production abroad and the domestic factory production rate is estimated to 10-20%. Due to the factory production rate is also low, despite what can be done at the factory the workload in construction field increases. According to the workload in field increases, the effect of the schedule reduction can be reduced. It resolved to form a consortium with a modular manufacturer and construction companies or the contract is concluded with Owner, modular manufacturer and construction companies in each. In this paper, we propose a specific project delivery system for modular building to solve the problem of the low factory production rate and the problem of schedule reduction. Through this paper, due to the variety of project delivery system on modular buildings is expected to contribute to the activation of modular buildings.

  • PDF

Evaluation and Analysis of Building Energy Rating System Accroding to Insulation Performance of Building Envelope in Regional and Building Form of Apartment House (지역 및 주동형태별 공동주택 외피 단열 성능에 따른 건물에너지효율등급 평가 및 분석)

  • Kim, Min-Kyu;Park, Hyu-Soon;Song, Kyoo-Dong
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.25 no.2
    • /
    • pp.49-54
    • /
    • 2013
  • In field of apartment housing currently, insulation technology is the most effective way because it is common to improve the thermal performance, therefore, it is contributed to energy saving as several regional insulation standards and legal mandate method. In addition, by applying of building energy efficiency rating certification system, it has inspired voluntary energy conservation commitment for the building owner or facility manager by making a plan to evaluate and verify building energy performance. However, these circumstances are not enough to acquire a grade 2 of higher information. Therefore, in this study, we analyzed the impact of building energy efficiency rating and confirmed reduction ratio compared to the standard housing on the basis of recent our nation building law when we had changed the shape of windows and wall insulation performance and shapes of housing.

Correlation of damage and analysis of R/C building: Experience from the 1995 Kobe earthquake

  • Matsumori, Taizo;Otani, Shunsuke
    • Structural Engineering and Mechanics
    • /
    • v.6 no.8
    • /
    • pp.841-856
    • /
    • 1998
  • During the 1995 Hyogoken-Nanbu Earthquake, a reinforced concrete building, called Jeunesse Rokko, suffered intermediate damage by forming a beam-yielding (weak-beam strong-column) mechanism, which has been regarded as the most desirable earthquake resisting mechanism throughout the world. High cost to repair damage at many beam ends and poor appearance expected after the repair work made the owner decide to tear down the building. Nonlinear earthquake response analyses were conducted to simulate the behavior of the building during the earthquake. The influence of non-structural members was considered in the analysis. The calculated results were compared with the observed damage, especially the location of yield hinges and compression failure of spandrel beams, and the degree of cracking in columns and in column-girder connections.

A study on the Improvement Plan of Construction Site Management In Korea (국내 건설 현장관리업무의 개선방안에 관한 연구)

  • Kim, Jin-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.4
    • /
    • pp.137-144
    • /
    • 2002
  • In the modern age. Building is getting higher and larger according to owner and social demands. Now when we are facing the need of the cost down and the reduction of economic loss. In this paper, the characteristics of the present conditions of site management were investigated with the field survey. And The Purpose of this study is to suggest the rational plans of construction planning in site management. The method of site management. however depends on experience of a construction manager. in order to solve this situation, it is necessary to create a method of site management that is adequate for the condition of construction. By cultivating excellent sub contractors, we can expect precise construction with a few experts. improvement in qualify of construction from standardization, computerization of each process. And the expectancies of this paper are that it can be used as efficient data for improvement of system to systematize site management work in Korea.

Case Study on an Apartment Interior Remodeling Construction (아파트 실내 리모델링 공사 사례분석)

  • Kang, Sang-Chan;Jang, Myunghoun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.129-130
    • /
    • 2022
  • Apartments, which are typical residential spaces, are reconstructed or remodeled according to aging. However, reconstruction or remodeling of apartment complexes or an individual building requires following relevant laws and policies and requires a lot of time. Therefore, there are cases where apartment residents choose remodeling that improves the living environment by renovating only the interior of their household. In order to improve the interior space of an apartment, various materials such as windows, toilets, walls, and floors are replaced, and lots of matters must be considered in this process. Several problems arise in the process of selecting a remodeling company and carrying out construction, and the problem must be resolved through owner's decision-making. This study analyzes the problems through the case of apartment interior remodeling and suggests ways to improve them.

  • PDF

AN ANALYSIS ON FACTORS AFFECTING SCHEDULE PERFORMANCE OF PUBLIC HOUSING PROJECTS: CASE OF SINGAPORE

  • Bon-Gang Hwang;Xianbo Zhao;Si Yi Ng
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.412-418
    • /
    • 2013
  • With the increasing demand for public housing, the Singapore government decided to reduce the waiting time of future public housing owners, which requires these projects to be completed on time. As a result, this study aims to identify the frequent and impactful factors affecting schedule performance of public housing projects in Singapore. The survey conducted with 36 industry experts revealed that "site management", "coordination among various parties", "design changes by owner during construction", "availability of laborers on site", "availability of material", and "availability of staff to manage projects" were the six factors that should be emphasized to assure the schedule performance of public housing projects. In addition, there was statistically significant agreement between public housing projects and other building projects on both the frequency and impact ranks of the factors. The findings from this study will help practitioners involving public housing projects to take measures to assure the achievement of project schedule objectives.

  • PDF

A Study on the Complement of Stand Agreement System for the BlM Implementation (BlM실행을 위한 표준계약체계 보완에 관한 연구)

  • Kim, Yong-Hee;Choi, Jong-Chon;Kim, Khil-Chae
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.9 no.1
    • /
    • pp.83-90
    • /
    • 2009
  • Building Information Modeling (BIM) has the great possibility of transforming the AEC industry. BIM will require increased information exchange and mutual collaboration between all stakeholders. BIM implementation and such increased collaboration can affect legal issues and contract provisions. And some legal issues accompanying BIM Implementation will be raised while a large change also comes in responsibility and role between all stakeholders. However, current standard agreement system is based on fragmented agreement between the architect and the owner, and between the owner and the contractor. Another legal obstacles and considerations associated with BIM implementation will be arose from BlM technology and use of BIM. AEC professionals in Korea have long utilized the standard agreement forms as well and look forward complementation of current standard agreement for BlM implementation. Such complement direction for the standard agreement will be examined by investigating the legal issues and overview comparison between AlA E202 and ConsensusDOCS 301.

  • PDF

A Process for Replacing BIM Property Information about Internal Finishing of Office Building in Design Phase (업무시설 설계단계 BIM 내부마감 속성정보 교체 프로세스)

  • Han, Ji-Ho;Nam, Dong-Hee;Park, Sang-Hun;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.207-208
    • /
    • 2023
  • The procedure of predicting the construction cost and selecting the best alternative is performed based on comparative review of each building case. In the case of office building, it is required continuously until design is complete, since the owner requirements are various and likely to change during the design process compared to a standardized apartment. However, since the comparison work for each alternative in practice uses only the unit construction cost, there is no correlation between the alternative and the final result, and it is difficult to quantitatively determine the effect of the determined design factor on the total construction cost. It is needed that a means to support the generation of design alternatives using similar building cases during the design phase. This paper proposes a BIM-based data replacing process to support creating and comparison of design alternatives of internal finishing for office building. When design alternatives are created through the proposed process, it is possible to compare several similar cases with current project under equivalent design circumstance. Because only some finishing properties are replaced while maintaining the shape information such as the length, height, and base constraint of the object to be replaced.

  • PDF

A study on the Ethics Characteristics according to Service and Practice of Construction Manager (건설사업관리자의 업무수행에 따른 윤리 특성 고찰)

  • Lee, Sang-Beom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.97-106
    • /
    • 2011
  • Construction Management is the overall management of the project as construction manager and the owner are united together. Construction manager's role is to conduct the overall or partial construction administration in the 'design, bid, build' process, in the owner's interests with maintaining technical neutrality. Construction manager is becoming one of new professionals in the building process and the contract defines their roles and the range of services, so high level of ethnics are required. This study suggests the legal status of the construction manager and the ethnic standards and the ethnic's characteristics. In conclusion, firstly, the legal characteristics of the administration of construction management are the delegations contract, the responsibility of negligence and the duty of due diligence, abided by the contract that ties between the owner and the construction manger. Secondly, the administerial characteristics of the construction management are the role of mediator, the service of professional technology, accountability to the owner and publicness. Thirdly, due to these characteristics, as a professional, the standard of ethnic assessment for the construction project manager are intention, act and result, so with the relation to that, morality, deontology and consequentialism have been suggested in this study.