A Study of CM(Construction Management) application method for exhibition facilities. (전시시설 건립을 위한 CM 적용방법에 관한 연구)

  • 문종승;임채진
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2001.05a
    • /
    • pp.39-44
    • /
    • 2001
  • An instance of domestic exhibition facility building case, the shortage of managing personal in construction resulted serious issue on expenses, times, quality, and safty with no satisfaction on its process and result. According to subject's speciality the CM's application methods are varied and because of its speciality, overall process of building an exhibition facility operating by its owner. This study intends to exam a application possibility of CM on exhibition facility construction to make smooth communication among varied area that following to exhibition facility construction.

  • PDF

Role of Public Owner for Delivery of Public Experience Facility Construction Project (공공 체험시설 건설사업 발주를 위한 공공 발주자 역할에 관한 연구)

  • Song, Hyunjang;Lee, Seunghoon;Jin, Zhengxun;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.1
    • /
    • pp.28-36
    • /
    • 2022
  • Since the establishment of a large-scale public experience facility in Korea, the construction project of public experience facilities has recently changed to a form where local governments or local education offices place delivery alone or agreements. In particular, due to the low frequency of delivery and the nature of delivery organization that do not have specialized organizations specializing in Delivery Framework, the role of enhanced Public Owner is needed. In response, this study investigated the current status and operation status of public experience facility construction projects in Korea and derived problems and directions for improvement of the current role of Public Owner. In addition, the study proposed the improvement of the role of public Owner in public experience facilities, which are composed of the promotion stage and functions reflecting the factors and attribute information of the business characteristics.

Green Building Design Strategies for Multiplex Housing

  • Park, Won Ho;Ahn, Yong Han;Choi, Young-Oh
    • KIEAE Journal
    • /
    • v.16 no.4
    • /
    • pp.21-30
    • /
    • 2016
  • Purpose: Energy saving in the built facilities is getting important due to energy crisis. The Korea government has been implemented several energy and green building policies and practices. The both of government and industry also developed green building strategies ant technologies to reduce energy consumption and carbon emission. The purpose of this research is to identify applicable green building strategies and technologies for that can be cost effective and applicable to a multiplex house. Method: This research identified appropriate green building strategies from analysing green building strategies from G-SEED certified apartment projects and popular green building strategies. This study also adopted a survey research method to find out the applicable green building strategies for a multiplex housing. In addition, this research also conduct cost estimating to identify initial cost premium of green building strategies. Results: The research outcomes in this study guide a building owner to know about initial cost premiums of green building strategies and technologies and an architect and contractor to identify appropriate and cost effective green building strategies that can be applicable to a multiplex house.

A Fundamental Study on the Development of Indicators for the Assessment of Design Quality (건축설계 품질 평가지표 개발을 위한 기초연구)

  • Choi, Yeon-Ju;Yi, June-Seong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.584-587
    • /
    • 2006
  • Quality assessment of the building is strongly dependent upon satisfying owner's requirements. To develop indicators for the assessment of design quality, survey on current situation of design process and analysis of Design Quality Indicator(DQI) is performed. The survey revealed that the main cause of frequent design changes is variability feature of owner's requirements. DQI, an indicator developed in UK, questionnaire encompasses questions which are relevant throughout the development stages of a building, and can be used at every key stage of the process. Further research will focus on the development of indicators for the assessment of design quality applicable to Korean market. In addition, research on the visualization method to present assessment results and supporting tools to facilitate assessment will be considered.

  • PDF

A Study on the Current Status and Improvement of BIM in the Government Owner Perspective - Focus on the KEPCO Na-Ju Head Office Project - (공공시설 발주자 관점에서의 BIM 적용 현황 및 개선방안 연구 - 한국전력공사 나주 신사옥 건립공사 사례를 중심으로 -)

  • Sim, Gu-Sik;Kim, Sung-Man;Ahn, Jae-Hong
    • Journal of KIBIM
    • /
    • v.3 no.2
    • /
    • pp.19-27
    • /
    • 2013
  • The application of the BIM for the KEPCO' new headquarters in Naju involved alternative approaches and accompanied many trials-and-errors as the project adopted new targets and purposes that were not used in Korea before. In particular, for a large BIM-based project, clearly defining the BIM-including the objective, scope and the outcome-is critical for a project owner. For a successful implementation, project owners should improve the utilization of the BIM. Against this background, this research examines the case of the BIM application for the KEPCO' new headquarters in Naju, identifies its effects and problems, and proposes how to improve application of the BIM for public projects. The improvement in the BIM application can be divided into several stages: project order, design development, construction, and post-construction maintenance. In the initial stage, it is important to fully discuss the project planning among participants, and clarify the goal, scope, expected outcomes and role of the BIM. In the design stage, the level of detail (LOD) for the 3D model should be defined in consideration of information use in the stages of estimation and construction. In the construction stage, the scope of project that is managed based on the processing and use of the BIM data should be clearly given and understood. After construction is complete, measures should be sought to use the BIM for maintenance, and corresponding requirements and outcomes should be provided. The analysis is expected to provide basic data for successful implementation of BIM-based public projects, by assisting project owners and involved parties in enhancing work in different stages of a project.

The Process of Identifying the Responsibility Party of Caused Delay Claim by Ambiguity of the Conditions of the Contract (계약 조항의 애매모호성에 의해서 발생되는 공기지연 클레임의 책임 당사자 확인 프로세스)

  • Lee, Chijoo;Kwan, Taewook;Koh, Hoonsuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.6
    • /
    • pp.527-535
    • /
    • 2020
  • This study analyzed main causes of claims in EPC/Turnkey projects. For this purpose, this study referred to the FIDIC silver book, which lists the international standard contract conditions for EPC/Turnkey projects. The most frequent cause of claim was delay. A process was then proposed to determine whether the owner or contractor was the responsible party when the delay claim occurred. The proposed process was for damages for delay which is the conditions of contract for indemnities against delay claim. The process was based on conditions of the contract of two previous EPC/Turnkey projects that were constructed in 2010, the FIDIC silver book, as well as the obligations of owner and contactors. The proposed process is applicable depending on the conditions of the contract and the owner's meaning. Furthermore, by identifying the responsible party, this study will contribute in identifying the possible claim types before concluding a contract and writing the specific contract.

A Study on Interior Design of Lobby Space in Office Building (오피스 빌딩의 로비공간에 관한 연구)

  • 김성기
    • Korean Institute of Interior Design Journal
    • /
    • no.11
    • /
    • pp.38-44
    • /
    • 1997
  • According to office building design in Korea, building exterior and office automatic systems through introducing IB system have been improved. However, the lower floors of a building are functionally easy to transfer but actually functions as an enterance. Although at takes a large investment by the owner or enterprise, mainly the tenants and neighbors are in a broad sense the actual users. In this point of view, the lobby of an office bulidling which is the connection between the exterior as a public space and the interior as a private area, does not only have the function of an enterance but also has to be an image of the enterprise or the building itself. Therefor the lobby must contain various functions of space.

  • PDF

Legal Direction of Defect Warranty Liability in the Korean Construction Industry

  • Cho, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.2
    • /
    • pp.195-202
    • /
    • 2018
  • The defects that are bound to arise in most construction projects cause disputes among the contracting parties regarding the defect warranty liability (DWL)guaranteed by the retention of the contractor's performance security at the end of the performance period of the contract. Most current projects involve a multiple-tier contractual relationship, causing the liability for some defects to overlap. In addition, many construction projects are made up of multiple detailed work types which an expert hired by the owner inspects the part completed by the contractor and pays an interim payment. However, after the completion of work, the contractor will still hold the defect warranty liability. In a scenario in which the work is delayed due to reasons for which the owner is responsible, the defect warranty liability period is also increased, imposing an additional burden on the contractor. In this study, basic research was carried out with the goal of reducing problems related to defect warranty liability Problems related to defect warranty liability cases and the nature of the defect warranty liability period were investigated. Possible solutions to the problems caused by the DWL that were suggested include the separation of the negligence liability period and the strict liability period, as well as the introduction of a retention money system.

A Benchmarking Tool to Assess the Role of the Construction Manager in terms of Project Teamwork Supports

  • Kim, Chan-Kyu
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.2
    • /
    • pp.200-207
    • /
    • 2011
  • Construction management services have been adopted for more than a decade and are continuously growing; however, the advantages of utilizing a construction management service are still not quite clear, regardless of many arguments can be made in their favor. The construction manager, as a coordinator, is supposed to smoothly facilitate the project teamwork in order to deliver a profitable and satisfactory project, not only for the owner's interests but also for the success of all project participants. This study has focused on the teamwork supports a construction manager can provide during project operations. This study developed a benchmarking tool to assess the construction manager's role in terms of its project teamwork supports, by utilizing the evaluation model and several case studies. In addition, this study also attempted to set the industry average and higher performance so that both the owner and the construction manager can self-assess, and more importantly, can improve project operation. The actual implementation of the benchmarking tool into on-going projects can allow the construction manager to understand the current operation and to make a better project process through teamwork.

A Study of Plans for the improvement of the domestic building maintenance system based on the comparison and analysis of foreign building maintenance systems (외국의 유지관리 제도 비교분석을 통한 국내 건축물 유지관리 개선 방안 연구)

  • Yoon, Hyo-Jin;Chung, Kwang-Ho
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.9 no.2
    • /
    • pp.25-33
    • /
    • 2009
  • So far we have investigate and analyzed the actual conditions of building maintenance in Korea and compared the building maintenance laws and systems between Korea and other countries. Now, based on the results from such comparison and analysis, this study proposes the following ideas for improvement: 1) As we can learn from domestic and foreign case studies, in the existing built-up areas becoming obsolete, many building owners remodel their buildings illegally in reaction to current economic and social changes. Therefore, for efficient maintenance of buildings, it is required to improve building maintenance systems by formulating information about inspection items, inspectors, supervisors, inspection costs and intervals of reporting results, depending on how large the buildings are and what they are used for. 2) In addition, to ensure the success of a building maintenance system, it is necessary to keep and manage a history of building maintenance thoroughly and introduce a certification program which gives an appropriate grade to maintenance performance and commits the government to expand their public roles and supporting policies, as widely used in some foreign countries. Further, in keep the building maintenance system secure, there should be a nationwide consensus as well as a favorable evaluation from building owners and manager, and all related people.

  • PDF