• Title/Summary/Keyword: building groups

Search Result 612, Processing Time 0.029 seconds

A Study on the Characteristics of Flows around Building Groups Using a CFD Model (CFD 모델을 이용한 건물군 주변의 흐름 특성 연구)

  • Lee, Hankyung;Kim, Jae-Jin;Lee, Young-Gon
    • Atmosphere
    • /
    • v.25 no.3
    • /
    • pp.501-510
    • /
    • 2015
  • In this study, the characteristics of flows around building groups are investigated using a computational fluid dynamics (CFD) model. For this, building groups with different volumetric ratios in a fixed area are considered. As the volumetric ratio of the building group increases, the region affected by the building group is widened. However, the wind-speed reduced area rather decreases with the volumetric ratio near the ground bottom (z ${\lesssim}$ 0.7H, here, H is the height of the building group) and, above 0.7H, it increases. As the volumetric ratio decreases (that is, space between buildings was widened), the size of recirculation region decreases but flow recovery is delayed, resulting in the wider wind-speed reduced area. The increase in the volumetric ratio results in larger drag force on the flow above the roof level, consequently reducing wind speed above the roof level. However, above z ${\gtrsim}$ 1.7H, wind speed increases with the volumetric ratio for satisfying mass conservation, resultantly increasing turbulent kinetic energy there. Inside the building groups, wind speed decreased with the volumetric ratio and averaged wind speed is parameterized in terms of the volumetric ratio and background flow speed. The parameterization method is applied to producing averaged wind speed for 80 urban areas in 7 cities in Korea, showing relatively good performance.

Sick Building Syndrome and the Related Factors in Office Workers (일부 대형빌딩 근무자에서 sick building syndrome의 위험요인에 관한 연구)

  • Baik, Jae-Joong;Cho, Soo-Hun;Park, Byung-Joo;Kang, Dae-Hee
    • Journal of Preventive Medicine and Public Health
    • /
    • v.30 no.1 s.56
    • /
    • pp.157-170
    • /
    • 1997
  • A cross-sectional study was conducted to investigate the prevalence and risk factors for symptoms associated with sick building syndrome in four office buildings located in Seoul. Information on personal factors, job-related factors, and medical history were collected using self-administered questionnaires modified from the National Institute for Occupational Safety and Health Indoor Air Quality questionnaire in 321 office workers in these buildings. The prevalence of general and irritant symptom groups was higher than the prevalence of dermatologic and respiratory symptom groups. Daily total work time, work time in the office, and work time with video display terminals (VDT) were identified as the risk factors for symptom groups associated with sick building syndrome by multiple linear logistic regression analysis. In conclusion, these results indicated that the symptom prevalence in this study is similar with the results reported from previous studies conducted in other countries and work time and work with VDT are related to sick building syndrome in Korea.

  • PDF

3D BUILDING RECONSTRUCTION FROM AIRBORNE LASER SCANNING DATA

  • Lee, Jeong-Ho;Han, Soo-Hee;Yu, Ki-Yun;Kim, Yong-Il
    • Proceedings of the KSRS Conference
    • /
    • 2007.10a
    • /
    • pp.587-590
    • /
    • 2007
  • The demand for more accurate and realistic 3D urban models has been increasing more and more. Many studies have been conducted to extract 3D features from remote sensing data such as satellite images, aerial photos, and airborne laser scanning data. In this paper a technique is presented to extract and reconstruct 3D buildings in urban areas using airborne laser scanning data. Firstly all points in a building were divided into some groups by height difference. From segmented laser scanning data of irregularly distributed points we generalized and regularized building boundaries which better approximate the real boundaries. Then the roof points which are subject to the same groups were classified using pre-defined models by least squares fitting. Finally all parameters of the roof surfaces were determined and 3D building models were constructed. Some buildings with complex shapes were selected to test our presented algorithms. The results showed that proposed approach has good potential for reconstructing complex buildings in detail using only airborne laser scanning data.

  • PDF

Building Extraction and 3D Modeling from Airborne Laser Scanning Data

  • Lee, Jeong-Ho;Han, Soo-Hee;Byun, Young-Gi;Yu, Ki-Yun;Kim, Yong-Il
    • Korean Journal of Remote Sensing
    • /
    • v.23 no.5
    • /
    • pp.447-453
    • /
    • 2007
  • The demand for more accurate and realistic 3D urban models has been increasing more and more. Many studies have been conducted to extract 3D features from remote sensing data such as satellite images, aerial photos, and airborne laser scanning data. In this paper a technique is presented to extract and reconstruct 3D buildings in urban areas using airborne laser scanning data. Firstly all points in a building were divided into some groups by height difference. From segmented laser scanning data of irregularly distributed points we generalized and regularized building boundaries which better approximate the real boundaries. Then the roof points which are subject to the same groups were classified using pre-defined models by least squares fitting. Finally all parameters of the roof surfaces were determined and 3D building models were constructed. Some buildings with complex shapes were selected to test our presented algorithms. The results showed that proposed approach has good potential for reconstructing complex buildings in detail using only airborne laser scanning data.

Experimental study of a modeled building frame supported by pile groups embedded in cohesionless soil

  • Ravi Kumar Reddy, C.;Gunneswara Rao, T.D.
    • Interaction and multiscale mechanics
    • /
    • v.4 no.4
    • /
    • pp.321-336
    • /
    • 2011
  • This paper presents the results of static vertical load tests carried out on a model building frame supported by pile groups embedded in cohesionless soil (sand). The effect of soil interaction on displacements and rotation at the column base and also the shears and bending moments in the columns of the building frame were investigated. The experimental results have been compared with those obtained from the finite element analysis and conventional method of analysis. Soil nonlinearity in the lateral direction is characterized by the p-y curves and in the axial direction by nonlinear vertical springs along the length of the piles (${\tau}-z$ curves) at their tips (Q-z curves). The results reveal that the conventional method gives the shear force in the column by about 40-60%, the bending moment at the column top about 20-30% and at the column base about 75-100% more than those from the experimental results. The response of the frame from the experimental results is in good agreement with that obtained by the nonlinear finite element analysis.

READINESS OF NIGERIAN BUILDING DESIGN FIRMS TO ADOPT BUILDING INFORMATION MODELLING (BIM) TECHNOLOGIES

  • Mu'awiya Abubakar;Yahaya Makarfi Ibrahim;Kabir Bala
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.640-647
    • /
    • 2013
  • Building Information Modelling (BIM) has become the new international benchmark for efficiency in design, construction and maintenance of buildings. It is the platform that brings about collaboration between project stakeholders and improvement of project outcomes. With all its potentials, not much of the impact of BIM technologies has been felt in the Nigerian construction industry. This research aimed at assessing the readiness of the Nigerian building design firms to adopt BIM technologies. The research was exploratory in nature. A field survey was conducted with the use of structured questionnaire, self administered to a sample of building design consultancy firms (architectural, structural, M&E, quantity surveying, and multi-disciplinary design firms) within Abuja and Kaduna. The questionnaire sought the perception of the responding firms on the factors affecting BIM adoption in the Nigerian construction industry, and their level of readiness to adopt BIM technologies in their practices based on the four categories of readiness-management, people, process and technology. 42.26% response rate was achieved and used for analysis. ANOVA and DUNCAN post-hoc tests were used to establish the differences between the responses of the groups of firms, while means and standard deviations were obtained to establish the important factors affecting BIM adoption in Nigeria. The survey revealed that all the groups of Nigerian design firms are appreciably ready for the adoption of BIM technologies in their practice, with slight variations in their respective levels of readiness. 'Lack of awareness of BIM technology among professionals' and clients and 'lack of knowledgeable and experienced partners' were identified as the most important barriers of BIM adoption in Nigeria; while the most significant drivers are 'availability of well trained professionals' and 'cooperation and commitment of professional bodies to the adoption'. Education and training of building design professionals and cooperation of all stakeholders in the design and construction supply chain were recommended as part of measures to ensure successful adoption of BIM in the Nigerian construction industry.

  • PDF

A Study on the Reasonable Selection of New Ward Office Building Site Using Analytic Hierarchy Process (AHP기법을 활용한 공공청사 신축 부지의 합리적인 선정에 관한 연구)

  • Lim, Byung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.6
    • /
    • pp.75-82
    • /
    • 2008
  • The purpose of this study is to present the rational decision process for new ward office building site. AHP Technique used in this study considers both quantitative and qualitative factors on the basis of decision maker's intuitive, reasonable or unreasonable judgement by giving weight through mutual comparision of publicity factors. The evaluaion factors were refer to another five ward office there were executed these kinds of new site selection before. These standards are composed of 6 middle groups and classified into 9 detailed standards. Alternative building sites are five places in this district. The final evauation standards are Accessibility, Urban Expansion Possibility. Distrct balance, Environment, Financing. Development easiness. And It became clear that the priority of evaluation is Financing > Urban expansion > Accessibility > Development easiness > District balance > Environment. In conclusion, it was determined that alternative " E " is the most adequate place for new ward office building.

A study on the Improvement Plans for Green Building Certification System -focused on the school use classification- (녹색건축물인증제도 개선방향에 관한 연구 -학교시설 용도구분 개선을 중심으로-)

  • Lee, Jae Ok;Meang, Joon Ho;Lee, Sang Min;Lee, Seung Min
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.11 no.2
    • /
    • pp.28-37
    • /
    • 2012
  • The purpose of this study is to suggest improvement plans of School Green Building Certification System by comparing items of domestic system with those of foreign system. Especially, we focused on school use classification. Use classification of Green Building Certification System must be based on Building Codes and reflect the nature of building use and size. Schools are divided into three groups ; preschool, school(elementary, junior high school, high school), university and ect. Also they must be set up assessment method reflecting the nature of school use and size.

A Study on Remodeling for Building Performance Improvement (건물성능개선을 위한 리모델링에 관한 연구)

  • 김남효
    • Korean Institute of Interior Design Journal
    • /
    • no.25
    • /
    • pp.42-48
    • /
    • 2000
  • The building remodeling is providing a lot of solutions - structural, aesthetic, environmental, and energy performance improvement - in improving buildings performance and environment. The remodelings influences on our society are resource conservation, environmental conservation, expansion of construction market, and creation of new employment. The three principal remodeler groups involved in this building remodeling are general construction contractors, interior architecture contractors, and ESCO (Energy Service Company). Having a representative character, this study classifies remodeling methods into five types: structural remodeling, spatial remodeling, exterior remodeling, environment-friendly remodeling, and ecological remodeling.

  • PDF

Calibration and Verification of Detailed Prototypical Apartment Building Energy Models for Estimation of Green Remodeling Feasibility (그린리모델링 효과평가를 위한 표준공동주택 정밀에너지해석모델 보정과 검증)

  • Donghyun Seo
    • Land and Housing Review
    • /
    • v.15 no.2
    • /
    • pp.9-17
    • /
    • 2024
  • The prototypical building energy model is very useful in building energy policies, research, and technology development. A prototypical apartment model for detailed energy analysis was proposed by Seo et al. in 2014, but sufficient verification was not possible due to the lack of reliable measurement data in predicting the model's energy consumption. However, verification is now possible thanks to a recent study that analyzed the Household Energy Panel Survey (HEPS) data that is released annually by the Korea Energy Economics Institute (KEEI) and published apartment complex benchmark data. The data was used to calibrate the prototypical apartment energy model located in the central region and constructed between 1990 and 1999. The calibrated model was used to verify the other apartment building groups with respect to region and year of completion. Meteorological data for five representative cities each in the central and southern regions were used for the simulation. A majority of the 18 groups produced results that satisfied the MBE and cv(RMSE) criteria.