• Title/Summary/Keyword: building finish

Search Result 168, Processing Time 0.021 seconds

Process Interference Management for Finish Works using Mobile Technology (모바일 기술을 이용한 마감공사의 작업간섭 관리)

  • Ko, Yong-Ho;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.35-36
    • /
    • 2017
  • The finish works of construction projects comprises approximately 40% of the total construction duration. Thus, the management of finish works have as big as impacts on total project duration as the earthworks, foundation and structure works. Process interference management is considered one of the most important issues dealt during finish works. However, it was investigated that effective management systems have yet not been applied for practical use. Accordingly, this paper suggests a mobile technology based finish works management system that mainly focuses on preventing process interference occurred due to ineffective communication between general and sub-contractors.

  • PDF

A Case Analysis Study on the Validity Assessment of Safety Inspection Findings for Reconstruction - Focusing on the Building Finish and Equipment Deterioration Sector - (공동주택 재건축 안전진단 적정성 검토 사례분석 연구 - 건축 마감 및 설비노후도 평가 중심으로 -)

  • Jeon, Jun-Seo;Kim, Hong-Seop;Kim, Eun-Young;Choe, Gyeong-Cheol;Lee, Mun-Hwan
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.271-272
    • /
    • 2023
  • In this study, we conducted a case analysis of the building finish and equipment deterioration sector in the validity assessment of safety inspection findings for reconstruction. A total of 21 cases were analyzed to confirm the characteristic of performance score for each subsector. It is confirmed that the average performance score was generally affected by maintenance activity, had regional characteristics.

  • PDF

An Experimental Study on Development of Design-Concrete used Building Wall (건축외벽용 의장콘크리트 개발에 관한 실험적 연구)

  • 임현준;김종원;강태경;김우재;이영도;정상진
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.05a
    • /
    • pp.985-990
    • /
    • 2002
  • Contemporary architecture calls for a wide range of surface textures and treatments. A surface compatible with the architect's design may vary from a glass-smooth finish to one requiring special sculptured ornamentation. These surfaces require many different types of form sheathing and lining. The purpose of study development new design form and made elaborateness shape. Easy to used in field that architecture finish material not used expect effective reduce of working hours, personnel expenses, architecture finish material, cost. After this, building wall apply a variety shape in concrete surface.

  • PDF

A Study on Building Wall with Glossing Design-Concrete (건축벽체용 광택문양콘크리트의 성능평가 연구)

  • 김종원;김재은;윤상혁;양동일;조상영;정상진
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2003.05a
    • /
    • pp.573-578
    • /
    • 2003
  • Contemporary architecture calls for a wide range of surface textures and treatments. A surface compatible with the architect's design may vary from a glass-smooth finish to one requiring special sculptured ornamentation. These surfaces require many different types of form sheathing and lining. The purpose of study development new design form and made elaborateness shape. Easy to used in field that architecture finish material not used expect effective reduce of working hours, personnel expenses, architecture finish material, cost. After this, building wall apply a variety shape in concrete surface

  • PDF

Delay Factors Based on the Importance of Finish Work in Apartment Construction Project (공동주택 마감공사 중요도 기반 작업지연 요인 분석)

  • Lee, Seung-Hoon;Lee, Sang-Hyo;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.125-129
    • /
    • 2010
  • The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.

  • PDF

Properties of Surface Grossing on the Design-Concreat by Developing of Design-Forms for Building Wall (건축물 벽체용 문양거푸집 개발을 통한 의장콘크리트의 표면광택 특성)

  • Oh, Jung-Keun;Gong, Min-Ho;Cho, Sang-Young;Jung, Keun-Ho;Jung, Sang-Jin;Jung, Jae-Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.1
    • /
    • pp.131-138
    • /
    • 2003
  • Contemporary architecture calls for a wide range of surface textures and treatments. A surface compatible with the architect's design may vary from a glass-smooth finish to one requiring special sculptured ornamentation. These surfaces require many different types of form sheathing and lining. The purpose of study is development of new design form and made elaborateness shape. Architecture finish material not used expenses working hours, personnel expenses, architecture finish material cost. After this, building wall apply a variety shape in concrete surface and Easy to used in field.

The Fundamental Study on Development of Design-Concrete used Building Wall (건축벽체용 의장콘크리트 개발에 관한 기초적 연구)

  • 임현준;정근호;김우재;김성식;정재영
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.05a
    • /
    • pp.27-30
    • /
    • 2002
  • Contemporary architecture calls for a wide range of surface textures and treatments. A surface compatible with the architect's design may vary from a glass-smooth finish to one requiring special sculptured ornamentation. These surfaces require many different types of form sheathing and lining. The purpose of study development new design form and made elaborateness shape. Easy to used in field that architecture finish material not used expect effective reduce of working hours, personnel expenses, architecture finish material, cost. After this, building wall apply a variety shape in concrete surface.

  • PDF

Drawing Segmentation Module for Management of Building Finish Details (마감상세도 관리를 위한 도면 블록화 모듈 개발)

  • Koo, Kyo-Jin;Park, Hyung-Jin;Joung, Jin-Hyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.3
    • /
    • pp.329-337
    • /
    • 2015
  • Drawings in construction industry are an aggregation of knowledge containing various information generated in a number of projects. Finish details are generated by architects when they select details and methods of construction by spaces or elements. However it is so difficult to re-use details in existing drawing management systems because there are so many details in a sheet and there are several many kinds of sheets in a file. In this paper, a drawing segmentation algorithm is suggested for managing building finish details individually. Based on this algorithm, a system module for making detail blocks from files of finish details is developed. Using the drawing segmentation module, interfaces of drawing management system are suggested in the paper. Management of individual detail blocks helps to reduce of the time for searching and increases productivity of designed drawings. Also it would contribute to increase quality of designed drawings by reusing of knowledge in detail blocks.

Measurement of Air Contaminants Emission from Interior Finish Material (실내 건축 마감자재의 공기오염물질 방출량 분석)

  • Kim, Yun-Deok;Lim, Soo-Young
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.14 no.1
    • /
    • pp.58-65
    • /
    • 2007
  • For the moderns who spend more than 80% of the time inside a building, interior environment became important since it directly affects their health. Recently as noxiousness of the air contaminants of the interior space stood out as well as the above trend, the Ministry of Environment enacted a lawto maintain the interior air quality at certain level of standard in the multi use facility and newly constructed apartment. To make the indoor air clean, removal technology of various contaminants should be developed and interior materials with chemical treatment should be restrained. In other words, selection of interior finish affects indoor air quality from the initial design stage to the construction stage. However, only limited contaminants emission data of building materials are supplied by related companies. There is no average contaminants emission data for overall materials. Moreover, high cost and equipments for one time measurement of VOCs emission of interior finish are the obstacles of active research and data measurement. Therefore, this paper searched the current condition of average VOCs & HCHO emission of various interior finish based on the study requested to research center from the building material company through Stands Test Method for Indoor Air Quality.

A Development on the Safety Management Information System in Building Work (빌딩공사의 안전관리정보시스템 개발)

  • Park, Jong-Keun
    • Journal of the Korean Society of Safety
    • /
    • v.20 no.4 s.72
    • /
    • pp.71-77
    • /
    • 2005
  • There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as foundation, erection, structure, equipment finish and etc based on accident examples and investigation on actual condition in building. In addition, the safety management system was developed to perform risk assessment of construction and use it for effective safety training for labor.