• Title/Summary/Keyword: build

Search Result 9,096, Processing Time 0.034 seconds

Performance improvement of Software Build through Software Configuration Management and Work Information Reporting (소프트웨어 형상관리와 작업정보 리포팅을 통한 소프트웨어 제작 성능 향상)

  • Kim, Jeong-Il;Lee, Eun-Seok
    • The KIPS Transactions:PartD
    • /
    • v.12D no.7 s.103
    • /
    • pp.1039-1048
    • /
    • 2005
  • A software configuration management(SCM) is essential for processing large scale project. The scope of SCM involves each developer's work space management, software building management, and development process control as wet] as version control. In this paper we focus on what parts should be controlled systematically for the optimized software build that is an important part of the SCM. We also analyze that to increase the efficiency of software build, what kind of configuration management information should be reported. Based on the analysis, we have actually designed and implemented a new reporting system and evaluated it. The evaluation includes comparative evaluation in efficiency based on the analysis about the related functions provided by existing tools and some additional qualitative evaluation through the questionnaires from stakeholders.

A SVM-based Method for Classifying Tagged Web Resources using Tag Stability of Folksonomy in Categories (범주별 태그 안정성을 이용한 태그 부착 자원의 SVM 기반 분류 기법)

  • Koh, Byung-Gul;Lee, Kang-Pyo;Kim, Hyoung-Joo
    • Journal of KIISE:Computing Practices and Letters
    • /
    • v.15 no.6
    • /
    • pp.414-423
    • /
    • 2009
  • Folksonomy, which is collaborative classification created by freely selected keywords, is one of the driving factors of the web 2.0. Folksonomy has advantage of being built at low cost while its weakness is lack of hierarchical or systematic structure in comparison with taxonomy. If we can build classifier that is able to classify web resources from collective intelligence in taxonomy, we can build taxonomy at low cost. In this paper, targeting folksonomy in Slashdot.org, we define a general model and show that collective intelligence, which can build classifier, really exists in folksonomy using a stability value. We suggest method that builds SVM classifier using stability that is result from this collective intelligence. The experiment shows that our proposed method managed to build taxonomy from folksonomy with high accuracy.

Studies on the Cutting Management of Pasture during the Mid Summer Season IV. Effect of cutting times after lodging on dead matter build-up, regrowth yield and botanical composition of orchardgrass dominated pasture (고온기 초지의 예취관리에 관한 연구 IIV. 도복후 예취시기가 Orchargrass우점초지의 고사물 , 재생수량 및 식생구성율에 미치는 영향)

  • Park, M.S.;Lee, J.K.;Seo, S.;Han, Y.C.
    • Journal of The Korean Society of Grassland and Forage Science
    • /
    • v.7 no.2
    • /
    • pp.87-91
    • /
    • 1987
  • This study was carried out to investigate the effects of different cutting times at 0, 10 and 20 days after lodging on the percentage of dead plants and bare ground, live and dead matter build-up, and botanical composition of orchardgrass dominated pasture during the mid summer season. For the test, a randomized block design with 3 replications was treated with 3 different cutting times (July 17, July 27 and Aug. 6). The results obtained are summarized as follows: 1. The percentage of dead plants with cutting times at 0, 10 and 20 days after lodging was 26.3,41.7 and 46.7'%, respectively. 2. The percentage of bare ground with cutting times at 0, 10 and 20 days after lodging was 13.3,26.7 and 3 1.7%, respectively. 3. Dead matter build-up with cutting times at 0, 10 and 20 days after lodging was increased significantly with later cutting (p<0.05). The ratio of live and dead matter build-up with cutting times at 0, 10 and 20 days after lodging was 90.2:9.8, 47.7:52.3 and 39.1:60.9%, respectively. 4. Regrowth yield after lodging was decreased significantly (p<0.05) with later cutting time. 5. The percentage of legumes in botanical composition was increased greatly with later cutting time. The ratio of grasses and legumes with cutting times at 0, 10 and 20 days after lodging was 77.8:21.6,45.5: 50.3 and 36.5:61.7%, respectively.

  • PDF

Evaluation on Performance Level of Design-Build and Design-Bid-Build (Focused on Bridge Construction Projects) (발주방식에 따른 성능수준 평가에 관한 연구)

  • Cho, Kyu-Man;Kim, Hee-Wook;Hyun, Chang-Taek;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.75-83
    • /
    • 2007
  • Recently, the Design-Build (DB) delivery method in public sector makes some argument by reason of the initial cost which is more higher than those of Design-Bid-Build (DBB). According to the results of pervious researches related to the performance evaluation of delivery method, DB can lead the reduction of project cycle time and also is superior to the traditional DBB in terms of construction quality. The performance on each delivery method could be generally evaluated by a project cost and a project cycle time as one of quantitative analyses, and also by construction quality as one of qualitative analyses. In most researches, the evaluation of performance level based on delivery methods has been evaluated by the degree of their satisfaction through the interview with owners. Therefore, this paper analyzed the design documents of construction projects delivered by traditional DBB and DB in bridge construction projects in order to measure design quality, constructability, maintainability, and etc. As an above-mentioned analyses, finally, this research shown that how much the difference of performance level is by each delivery method.

A Study on Efficiency of Mixed Model (BTO+BTL) for Public-Private Partnership Projects (민간투자사업 혼합방식(BTO+BTL)의 효율성에 관한 연구)

  • Kim, Do-Il;Jin, Run-Zhi;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.53-63
    • /
    • 2012
  • Korean Public-Private Partnership, mainly implemented using BTO (Build-Transfer-Operate) and BTL (Build-Transfer-Lease) methods, has contributed in increasing benefits of the people by providing the needed public services in a timely and efficient manner. It has also induced flexible national fiscal management. However, in addition to the repeal of the Minimum Revenue Guarantee (MRG) program in 2009, changes in business environment including recent financial crisis aggravated financial situation in pursing PPPs, resulting in significant contraction of BTO projects. Therefore, the new methods are to be suggested and applied to overcome this situation. This paper seeks to find ways to apply "Mixed Model," characterized as the compound of BTO and BTL, two different implementation methods of PPPs, as an enhanced burden-sharing mechanism.

Analysis and Quantitative Estimation of Risk Factors of Design-Build (턴키 프로젝트에서 리스크요인 분석 및 정량적 평가)

  • Oh, Guk-Yeol;Lee, Young-Dai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.12-24
    • /
    • 2012
  • The Risks in undertaking a construction project comes from many sources and often involves many participants in the project. This study has identified various kinds of risks, assessed the risk factors quantitatively and suggested risk management method for response pertinent in Design Build(Turn Key)type of projects in Korean context. A questionnaire was designed comprising of 145 possible risks in all types of construction projects. The population from owner, consultant and contractor groups was asked to indicate the risks applicable in DB projects. 25 numbers of critical risks in DB projects were identified and further analyzed for reveling inherent relationship between them through factor analysis. Factor analysis revealed 8 risk factors in DB projects. Construction site related, contract related and design related risk factor consisted about 72% of total risk weight. It has been found out about 6%, while considering the mutual dependency, it is about 10% of total cost of DB project. Therefore, It is suggested that 6% to 10% of construction amount as contingency has to be made provision for risk responses in the DB projects.

Evaluation of a Grid System for Numerical Analysis of a Small Savonius Wind Turbine (사보니우스 소형풍력터빈 수치해석용 격자시스템 평가)

  • KIM, CHUL-KYU;LEE, SANG-MOON;JEON, SEOK-YUN;YOON, JOON-YONG;JANG, CHOON-MAN
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.27 no.5
    • /
    • pp.547-553
    • /
    • 2016
  • This paper presents the effect of a grid system on the performance of a small Savonius wind turbine installed side-by-side. Turbine performance is compared using three different grid systems; tetrahedral grid having a concentrated circular grid around turbine rotors, the tetrahedral grid having a concentrated rectangular grid around turbine rotors and the symmetric grid having a concentrated tetrahedral grid near the turbine rotor blades and a hexahedral grid. The commercial code, SC/Tetra has been used to solve the three-dimensional unsteady Reynolds-averaged Navier-Stokes analysis in the present study. The Savonius turbine rotor has a rotational diameter of 0.226m and an aspect ratio of 1.0. The distance between neighboring rotor tips keeps the same length of the rotor diameter. The variations of pressure and power coefficient are compared with respect to blade rotational angles and rotating frequencies of the turbine blade. Throughout the comparisons of three grid systems, it is noted that the symmetric grid having a concentrated tetrahedral grid near the turbine rotor blades and a hexahedral grid has a stable performance compared to the other ones.

An Extraction and Analysis of Problem Areas for BTL Projects from the Practical Perspective (실무적 관점에서의 BTL사업 문제영역 도출 및 분석)

  • Kim, Soo-Yong;Son, Myung-Chan;Yang, Jin-Kook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.157-166
    • /
    • 2013
  • Unlike conventional BTO(Build-Transfer-Operate) projects, this BTL project aims at fixing the financial deficiencies of the government and expanding infrastructure through private capital. It allows the government to attract private capital for the construction of public facilities such as schools and social welfare agencies for whom private users don't need to pay, thereby bolstering national finance. BTL projects are causing a variety problems in progress. Therefore, we are required a practical approach to can improving a variety problems. In this study, we were derive the problem areas as follow. First, research data on the problem of domestic BTL projects, Second, high-performing foreign data analysis than domestic. And, we were analyzed to systematic management method for problem areas by using affinity techniques, matrix comparison analysis, AHP technique. Results of this study are expected provide management standards through real problem areas and the analyzing of relatively importance.

A Risk Quantification of Public Sector Comparator in the Financial Analysis of the BTL (Build-Transfer-Lease) Scheme of Railway Projects: a Case Study of the Haman-Jinju Link (철도 BTL 민자적격성조사의 위험계량화방안 연구)

  • Jang, Su-Eun;Gang, Ji-Hye
    • Journal of Korean Society of Transportation
    • /
    • v.24 no.5 s.91
    • /
    • pp.67-74
    • /
    • 2006
  • This paper proposes a way to a risk quantification of public sector comparator in the value-for-money test of the BTL (Build-Transfer-Lease) scheme in rail investment projects. Two principal risks that are project delay and budget increasing costs are identified and are empirically quantified with a case study of the Haman-Jinju link. The methodology suggested is expected to be a good reference for the similar research afterwards and also to help in settling down the scheme that is only an early stage.

Investigation to Metal 3D Printing Additive Manufacturing (AM) Process Simulation Technology (II) (금속 3D 프린팅 적층제조(AM) 공정 시뮬레이션 기술에 관한 고찰(II))

  • Kim, Yong Seok;Choi, Seong Woong;Yang, Soon Yong
    • Journal of Drive and Control
    • /
    • v.16 no.3
    • /
    • pp.51-58
    • /
    • 2019
  • The objective of this study was to investigate a simulation technology for the AM field based on ANSYS Inc.. The introduction of metal 3D printing AM process, and the examining of the present status of AM process simulation software, and the AM process simulation processor were done in the previous study (part 1). This present study (part 2) examined the use of the AM process simulation processor, presented in Part 1, through direct execution of Topology Optimization, Ansys Workbench, Additive Print and Additive Science. Topology Optimization can optimize additive geometry to reduce mass while maintaining strength for AM products. This can reduce the amount of material required for additive and significantly reduce additive build time. Ansys Workbench and Additive Print simulate the build process in the AM process and optimize various process variables (printing parameters and supporter composition), which will enable the AM to predict the problems that may occur during the build process, and can also be used to predict and correct deformations in geometry. Additive Science can simulate the material to find the material characteristic before the AM process simulation or build-up. This can be done by combining specimen preparation, measurement, and simulation for material measurements to find the exact material characteristics. This study will enable the understanding of the general process of AM simulation more easily. Furthermore, it will be of great help to a reader who wants to experience and appreciate AM simulation for the first time.