• Title/Summary/Keyword: budget estimate

Search Result 214, Processing Time 0.027 seconds

Estimation of Submarine Groundwater Discharge in Il-Gwang Watershed Using Water Budget Analysis and Rn Mass Balance (물 수지 방법과 라돈 물질수지 방법을 이용한 일광유역의 해저용출수 평가)

  • Gwak, Yong-Seok;Kim, Sang-Hyun;Lee, Yong-Woo;Hamm, Se-Yeung;Kim, In-Soo;Khim, Boo-Keun
    • Journal of Environmental Science International
    • /
    • v.20 no.9
    • /
    • pp.1165-1182
    • /
    • 2011
  • The evaluation of potential submarine groundwater is an important research topic for exploring an alternative water resource. Two different approaches, water budget analysis and Rn mass balance method, were employed to investigate the annual variation of submarine groundwater discharge in 2010 at a marine watershed located at the south-eastern part of Korean Peninsula. In order to obtain reliable hydrological data during study period, temporal and spatial variations of rainfall and soil moisture had been collected and hydro-meterological data such as temperature, humidity and wind speed were collected The runoff response was simulated using SCS-CN method with spatial distributions of landuse and soil texture from GIS analysis. Six different methods were used to estimate the monthly variation of evapotranspiration and field measurements of soil moisture were used to account for the infiltration. Comparisons of infiltration and surface runoff between simulation and water balance with measurements showed coincidence. The water budget analysis and Rn mass balance method provide mean daily submarine groundwater as 5.35 and 4.07 $m^3/m/day$ in 2010, respectively.

A simple estimate of the carbon budget for burned and unburned Pinus densiflora forests at Samcheok-si, South Korea

  • Lim, Seok-Hwa;Joo, Seung Jin;Yang, Keum-Chul
    • Journal of Ecology and Environment
    • /
    • v.38 no.3
    • /
    • pp.281-291
    • /
    • 2015
  • To clarify the effects of forest fire on the carbon budget of a forest ecosystem, this study compared the seasonal variation of soil respiration, net primary production and net ecosystem production (NEP) over the year in unburned and burned Pinus densiflora forest areas. The annual net carbon storage (i.e., NPP) was $5.75t\;C\;ha^{-1}$ in the unburned site and $2.14t\;C\;ha^{-1}$ in the burned site in 2012. The temperature sensitivity of soil respiration (i.e., $Q_{10}$ value) was higher in the unburned site than in the burned site. The annual soil respiration rate was estimated by the exponential regression equation with the soil temperatures continuously measured at the soil depth of 10 cm. The estimated annual soil respiration and heterotrophic respiration (HR) rates were 8.66 and $4.50t\;C\;ha^{-1}yr^{-1}$ in the unburned site and 4.08 and $2.12t\;C\;ha^{-1}yr^{-1}$ in the burned site, respectively. The estimated annual NEP in the unburned and burned forest areas was found to be 1.25 and $0.02t\;C\;ha^{-1}yr^{-1}$, respectively. Our results indicate that the differences of carbon budget and cycling between both study sites are considerably correlated with the losses of living plant biomass, insufficient nutrients and low organic materials in the forest soil due to severe damages caused by the forest fire. The burned Pinus densiflora forest area requires at least 50 years to attain the natural conditions of the forest ecosystem prior to the forest fire.

COST ESTIMATE AT EARLY STAGE USING CASE-BASED REASONING

  • Kihoon Seong;Moonseo Park;Hyun-Soo Lee;Sae-Hyun Ji
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.883-889
    • /
    • 2009
  • The importance of cost estimate in early stage such has been increasing due to market change and severe competition in construction industry. Because the adjustable budget is only 20% after design stage, most of the crucial decisions to influence cost is made in the early stage. However, in the early stage, the project scope is not defined completely so that estimator has inaccurate information to make critical decision. Therefore, this research suggests the cost estimate method using case-based reasoning. Case-based reasoning is appropriate for the early cost estimating, as it has the strength of rapidity and convenience in cost estimation. This research analyzes 84 actual data of public apartment on the scale of 11~15 stories. In order to extract the most similar case, at the first step this research identifies influence factors and calculates attribute similarity. In case-based reasoning, the most challenging task is determining attribute weight. At the third step, this research calculates case similarity which is aggregated attribute similarity multipled by attribute weight. Finally, extracts the most similar case which has the highest score of case similarity.

  • PDF

User Interface Design for Life Cycle Cost Estimation System (LCC 산정 시스템의 사용자인터페이스 설계)

  • Yang, Hoe-Ryeong;Shin, Han-Woo;Kim, Tae-Hui
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.149-150
    • /
    • 2012
  • According to the increase of demand of the deteriorated building. The interest of the building's maintenance is continually increased, so studies about how to increase building's stability & prolonged life span are increased. This study's purpose is to maintain building's function, so we suggest a protocol type system of UI to estimate reasonable planning of demand of repair & replacement and to distribute budget.

  • PDF

A study on application method of "Result unit cost" to Nuclear Power Plant (NPP) construction cost estimating (원전 건설공사 실적공사비 단가 제도 도입을 위한 연구)

  • Park, Weon-Seob;Jang, Kyoung-su
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.46-47
    • /
    • 2014
  • Recently, BAI(Board of Audit and Inspection of Korea) has recommended that "Result unit cost" of Korean government apply to national power plant construction project when plant owner corporations estimate budget price for tender. but nuclear industry have difficulties with this suggestion. the purpose of this study is to review the "Result unit cost" and problem with application of NPP construction cost estimating. And proposed the direction of application of "Result unit cost" to NPP construction cost estimating.

  • PDF

Economic Evaluation of the IT SoC Industry Infrastructure Program

  • Oh, Wan-Keun;Min, Wan-Kee
    • 한국벤처창업학회:학술대회논문집
    • /
    • 2007.04a
    • /
    • pp.79-99
    • /
    • 2007
  • This paper evaluates the economic effect of the IT SoC Industrial Foundation Composition Project. The evaluation was done in three steps. The first step was to estimate the contribution effect of the fabless small and medium venture business' sales. The step includes interview with all the CEOs of the firms under the support of the Enterprise Incubation System, The second step was to apply input-output analysis and then estimate the production inducement effect. The last step was to compare the results of estimation with the costs of the project. We have concluded this project had achieved 6.3 times greater economic effect compared to the budget. The reason for the large economic effect is that the project provided various infrastructures to the small and medium venture businesses.

  • PDF

The Economic Design of Two-Stage Sampling Plan for Attributes (비용을 고려한 계수치 2단계 샘플링 방법의 경제적 설계)

  • Lee, Gyeong-Jong;Lee, Sang-Yong
    • Journal of Korean Society for Quality Management
    • /
    • v.21 no.1
    • /
    • pp.35-43
    • /
    • 1993
  • The principal objective of a sampling plan is to make efficient use of the budget allocated and to obtain as precise an estimate of a population parameter as possible. In order to estimate the proportion of defectives produced or to determine some measure of product Quality, it is necessary to select random samples which represent a population parameter of the process. In this case, the two stage sampling is more efficient and convenient than simple random sampling. Therefore this paper aims to propose the design procedures of two stage sampling plan to obtain a representative samples in considering the sampling precision under the restricted sampling unspection cost.

  • PDF

Biomass Estimation of Gwangneung Catchment Area with Landsat ETM+ Image

  • Chun, Jung Hwa;Lim, Jong-Hwan;Lee, Don Koo
    • Journal of Korean Society of Forest Science
    • /
    • v.96 no.5
    • /
    • pp.591-601
    • /
    • 2007
  • Spatial information on forest biomass is an important factor to evaluate the capability of forest as a carbon sequestrator and is a core independent variable required to drive models which describe ecological processes such as carbon budget, hydrological budget, and energy flow. The objective of this study is to understand the relationship between satellite image and field data, and to quantitatively estimate and map the spatial distribution of forest biomass. Landsat Enhanced Thematic Mapper (ETM+) derived vegetation indices and field survey data were applied to estimate the biomass distribution of mountainous forest located in Gwangneung Experimental Forest (230 ha). Field survey data collected from the ground plots were used as the dependent variable, forest biomass, while satellite image reflectance data (Band 1~5 and Band 7), Normalized Difference Vegetation Index (NDVI), Soil-Adjusted Vegetation Index (SAVI), and RVI (Ratio Vegetation Index) were used as the independent variables. The mean and total biomass of Gwangneung catchment area were estimated to be about 229.5 ton/ha and $52.8{\times}10^3$ tons respectively. Regression analysis revealed significant relationships between the measured biomass and Landsat derived variables in both of deciduous forest ($R^2=0.76$, P < 0.05) and coniferous forest ($R^2=0.75$, P < 0.05). However, there still exist many uncertainties in the estimation of forest ecosystem parameters based on vegetation remote sensing. Developing remote sensing techniques with adequate filed survey data over a long period are expected to increase the estimation accuracy of spatial information of the forest ecosystem.

The Conceptual Cost Estimate Model on Preliminary Design Phase for RC Rahmen Bridge (RC라멘교의 기본설계단계 개략공사비 산정모델)

  • Kim, Byung-Soo;Kwon, Suk-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.111-120
    • /
    • 2009
  • The conceptual cost estimation used the construction project needs for confirm budget not only at the planning phase but also at the preliminary design phase of the construction project. Present, the conceptual cost estimation model have problems the rate of error is very large because the linear simple model calculate by use the cost of the unit meter or the unit square. This study development the model used grouping and the key quantity method, the mixed unit cost for solve problem of the very large rate of error. The result of this study reduced difference of between the real design construction cost therefor it expect that contribute to the client or the service company estimate budget of RC rahmen bridge.