• 제목/요약/키워드: bridges management

검색결과 327건 처리시간 0.022초

선교내에서 청각경보음의 유형이 반응속도와 정확성에 미치는 영향 (Effects of Auditory Warning Types on Response Time and Accuracy in Ship Bridges)

  • 하욱현;박성하;김홍태
    • 대한인간공학회지
    • /
    • 제29권4호
    • /
    • pp.673-680
    • /
    • 2010
  • The effects of different auditory warnings on response time and accuracy were studied in a laboratory ship-bridge work environment. Subjective preference on the type of auditory warnings was also of a primary concern. Twenty five subjects were asked to select an appropriate button for the warning sound presented with three types of auditory warning (abstract sound, auditory icon, and voice alarm) and five levels of warning situation (fire, steering failure, collision, engine failure, and low power). Results showed that the response time and accuracy was significantly affected by the types of auditory warning. The voice alarm resulted in a higher accuracy and subjective preference, as compared to the auditory icon and abstract sound. Regarding the response time, auditory icons and voice alarms were equivalent and superior to abstract sounds. Actual or potential applications of this research include guidelines for the design of integrated ship bridge systems.

건설안전을 위한 P.S.M. 기법에 관한 연구 (A Study on the P.S.M. system for the Construction Safety)

  • 이송;손기상;최원일;오태상;채점식
    • 한국안전학회지
    • /
    • 제15권4호
    • /
    • pp.101-111
    • /
    • 2000
  • In order to introduce P.S.M. system adequate to domestic construction first, many cases similar to advanced foreign P.S.M. system have been collected and compared to the domestic situation. Then, the current safety management status of bridges, subways, apartment and office building construction are investigated while visiting interview, using questionnaire at site have being done. The potential hazard and measurement have been investigated for each kind of works, and the domestic introducing method of P.S.M. system is analyzed with expert discussion. In order to represent how to make out P.S.M. plan, the questionnaire is made out using each five place for bridge, subways, apartment and office building. As the weight factor for potential hazard of each work obtained from more than forty site places, is produced and shown. Also, a direction the recommendation is suggested to improve tool in each construction site with work schedule. It is thought that proposed schedule contributed to keeping in safe business administration of each company in decreasing many effort at the construction site.

  • PDF

Application on the New Technology of Construction Structures Disaster Protection Management based on Spatial Information

  • Yeon, Sangho
    • International Journal of Internet, Broadcasting and Communication
    • /
    • 제10권3호
    • /
    • pp.136-145
    • /
    • 2018
  • The disaster monitoring technique by combination of the measurement method and the fine precision of the sensor collecting the satellite-based information that can determine the displacement space is available in a variety of diagnostic information and the GIS/GNSS by first sensor it is being requested from them. Be large and that the facility is operated nationally distributed torsional displacement of the terrain and facilities caused by such natural disasters progress of various environmental factors and the surroundings. To diagnose this spatial information, which contains the various sensors and instruments tracks the precise fine displacement of the main construction structures and the first reference in the Geospatial or more three-dimensional detailed available map and location information using the installed or the like bridges and tunnels produced to a USN/IoT change at any time, by combining the various positioning analysis of mm-class for the facility main area observed is required to constantly in the real time information of the USN/IoT environment sensor, and to utilize this as a precise fine positioning information by UAV/Drone to the precise fine displacement of the semi-permanent infrastructures. It managed to be efficient management by use of new technologies, analyzing the results presented to a method capable of real-time monitoring for a large structure or facility to construction disaster prevention.

Structural health monitoring system for Sutong Cable-stayed Bridge

  • Wang, Hao;Tao, Tianyou;Li, Aiqun;Zhang, Yufeng
    • Smart Structures and Systems
    • /
    • 제18권2호
    • /
    • pp.317-334
    • /
    • 2016
  • Structural Health Monitoring System (SHMS) works as an efficient platform for monitoring the health status and performance deterioration of engineering structures during long-term service periods. The objective of its installation is to provide reasonable suggestions for structural maintenance and management, and therefore ensure the structural safety based on the information extracted from the real-time measured data. In this paper, the SHMS implemented on a world-famous kilometer-level cable-stayed bridge, named as Sutong Cable-stayed Bridge (SCB), is introduced in detail. The composition and core functions of the SHMS on SCB are elaborately presented. The system consists of four main subsystems including sensory subsystem, data acquisition and transmission subsystem, data management and control subsystem and structural health evaluation subsystem. All of the four parts are decomposed to separately describe their own constitutions and connected to illustrate the systematic functions. Accordingly, the main techniques and strategies adopted in the SHMS establishment are presented and some extension researches based on structural health monitoring are discussed. The introduction of the SHMS on SCB is expected to provide references for the establishment of SHMSs on long-span bridges with similar features as well as the implementation of potential researches based on structural health monitoring.

사회기반 시설물의 안전점검 및 정밀안전진단결과 DB 구축방안 연구 (Database Construction Plan of Infrastructure Safety Inspection and In-depth Inspection Results)

  • 유종모;신은철
    • 한국지반신소재학회논문집
    • /
    • 제13권4호
    • /
    • pp.133-141
    • /
    • 2014
  • 본 연구에서는 교량, 터널, 댐, 상수도 등 사회기반 시설물의 안전점검 및 정밀안전진단결과를 DB화하고 업무프로세스를 자동화하기 위해 각 시설물별로 점검진단에 필요한 항목을 표준화해서 분류체계를 마련하였고 사전조사에서부터 현장조사, 시설물평가, 보고서작성에 이르는 전 과정에서 걸쳐 데이터베이스 기반의 자료구조를 정의하고 파일럿시스템을 구현하였다. 또한 점검진단결과 DB가 효과적으로 활용될 수 있도록 개선방안을 제시하고, 시설물정보관리종합시스템 운영규정, 점검진단 세부지침 등 관련 규정/지침에 대한 개선방안을 제시하였다.

A STUDY ON THE LIFE CYCLE COST ANALYSIS IN LIGHT RAIL TRANSIT BRIDGES: FOCUSED ON SUPERSTRUCTURE

  • Lee Du-heon;Kim Kyoon-tai;Kim Hyun Bae;Jun Jin-taek;Han Choong-hee
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.30-40
    • /
    • 2007
  • The demand for light-rail construction projects has recently been increasing, and they are mostly supervised by private construction companies. Therefore, a private construction company that aim to raise gains from the operation of the facilities during the contract period greater than what they invested should b able to accurately calculate the costs from the aspect of Life Cycle Cost (LCC). In particular, a light-rail transit bridge that has a heavier portion from the aspect of the cost of light-rail transit construction requires a more accurate calculation method than the conventional LCC calculation method. For this, an LCC analysis model was developed and a cost breakdown structure was suggested based on literature review. The construction costs by shape of the upper part of a light-rail transit were calculated based on the cost breakdown system presented in this paper, and the cost generation cycle and cost unit price were collected and analyzed based on records on maintenance costs, rehabilitation and replacement. In addition, after forming some hypotheses in order to perform the LCC analysis, economic evaluation was conducted from the aspect of the LCC by using performance data by item.

  • PDF

Suggestion and Verification of Assessment model on Construction-Cost of Steel Bridge in Project Performance Phases

  • Kab-Soo Kyung;Hye-Yeon Park;Sin-Hwa Kang;Eun-Kyoung Jeon
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.606-615
    • /
    • 2009
  • Estimating the reasonable construction-cost according to the construction phase in public construction is an important element for securing and executing a national budget efficiently. As a general rule, the predetermined cost of construction is estimated at the end of the design of the target structure. Therefore, it seems to be a considerably difficult problem to estimate the approximate cost of construction, only with its basic information of the bridge in the design planning phase and the early design stage where we can not have specific detailed-section of the target structure. In this paper, we present the calculation of construction-cost in the planning phase based on the analysis of factors affecting the cost of construction conducted in the previous study. Beside, to estimate the cost of construction in early design phase, we would like to present the calculation of construction-cost in the early design phase by executing the analysis of data collected from 61 steel box bridges. It was found from the result of study that the estimated cost of construction gained by the calculation of construction-cost in this paper reduces the error between the real cost of construction and that by the existing method of using.

  • PDF

Integrative Thinking as a Hallmark of Business Education

  • Chinta, Ravi;Funches, Venessa;Esmaeilioghaz, Hamed
    • 융합경영연구
    • /
    • 제4권4호
    • /
    • pp.25-28
    • /
    • 2016
  • In this paper we expand on the notion of "integration" in terms of the variety of ways in which it would manifest itself in business education. Our main argument is that "integration" is multidimensional and has been manifest in pedagogy, research and service dimensions of university programs for a long time. However, assessments of "integration" efforts have been spotty thus far and only recently are being formalized. We present several examples in business curriculum and with increased focus on formal assessments of "integration" efforts, business education will become more pragmatic. The goal of this paper is to unpack the broad construct of "integration," and discuss its historical and current manifestations in business education. Ultimately, we conclude that while the process of integrative thinking is well underway for a long time in business education, the assessment of outcomes of integrative thinking is just taking root through formal ETS tests. We believe that integrative thinking in business education is an ultimate indicator of the effectiveness of the business curriculum, as students skilled in this area will be best prepared for the real-life jobs in the market place.

A Study on NEMO-partially DMM based E2E Seamless Data Integration Transmission Scheme in SOC Public Infrastructures

  • Ryu, Wonmo;Caytiles, Ronnie D.;Park, Byungjoo
    • International Journal of Internet, Broadcasting and Communication
    • /
    • 제12권4호
    • /
    • pp.33-41
    • /
    • 2020
  • Nowadays, distributed mobility management (DMM) approaches have been widely adopted to address the limitations of centralized architectural methods to support seamless data transmission schemes in wireless sensor networks. This paper deals with the end-to-end (E2E) integration of Network Mobility (NEMO) basic support protocol in distributed wireless sensor network systems in structural health and environmental monitoring of social overhead capital (SOC) public infrastructures such as bridges, national highways, tunnels, and railroads. The proposed scheme takes advantage of the features of both the NEMO basic support protocol and partially distributed network-based DMM framework in providing seamless data transmission and robust mobility support. The E2E seamless data transmission scheme allows mobile users to roam from fixed-point network access locations and mobile platforms (i.e., vehicles such as cars, buses, and trains) without disconnecting its current sessions (i.e., seamless handover).

CLIQUE-TRANSVERSAL SETS IN LINE GRAPHS OF CUBIC GRAPHS AND TRIANGLE-FREE GRAPHS

  • KANG, LIYING;SHAN, ERFANG
    • 대한수학회보
    • /
    • 제52권5호
    • /
    • pp.1423-1431
    • /
    • 2015
  • A clique-transversal set D of a graph G is a set of vertices of G such that D meets all cliques of G. The clique-transversal number is the minimum cardinality of a clique-transversal set in G. For every cubic graph with at most two bridges, we first show that it has a perfect matching which contains exactly one edge of each triangle of it; by the result, we determine the exact value of the clique-transversal number of line graph of it. Also, we present a sharp upper bound on the clique-transversal number of line graph of a cubic graph. Furthermore, we prove that the clique-transversal number of line graph of a triangle-free graph is at most the chromatic number of complement of the triangle-free graph.