• Title/Summary/Keyword: bridge projects

Search Result 104, Processing Time 0.031 seconds

Development of the Approximate Cost Estimating Model Using Statistical Inference for PSC Box Girder Bridge Constructed by the Incremental Launching Method (통계적 기법을 활용한 ILM압출공법 교량 상부공사 개략공사비 산정모델 개발 연구)

  • Kim, Sang-Bum;Cho, Ji-Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.781-790
    • /
    • 2013
  • This research focuses on development of the conceptual cost estimation models for I.L.M box girder bridge. The current conceptual cost estimation for public construction projects is dependent on governmental average unit price references which has been regarded as inaccurate and unreliable by many experts. Therefore, there have been strong demands for developing a better way of conceptual cost estimating methods. This research has proposed three different conceptual cost estimating method for a P.S.C. girder bridge built with the I.L.M method. Model (I) attempts to seek the proper breakdown of standard works that are accountable for more than 95 percentage in total cost and calculates the amount of standard work's materials from the standard section and volume of I.L.M box girder bridge. Model (II) utilizes a correlation analysis (coefficient over 0.6 or more) between breakdown of standard works and input data that would be considered available information in preliminary design phase. Model(III) obtains conceptual estimating through multiple-regression analysis between the breakdown of standard works and all of input data related to them. In order to validate the clustering of coverage in the preliminary design phase, the variation of I.L.M cost coverage from multiple-regression analysis[model(III)] has been investigated which result in between -3.76% and 11.79%, comparing with AACE(Association for the Advancement of Cost Engineering) which informs its variation between -5% and +15% in the design phase. The model proposed from this research are envisioned to be improved to a great distinct if reliable cost date for P.S.C. girder bridges can be continually collected with reasonable accuracies.

Experimental study on nano silica modified cement base grouting reinforcement materials

  • Zhou, Fei;Sun, Wenbin;Shao, Jianli;Kong, Lingjun;Geng, Xueyu
    • Geomechanics and Engineering
    • /
    • v.20 no.1
    • /
    • pp.67-73
    • /
    • 2020
  • With the increasing number of underground projects, the problem of rock-water coupling catastrophe has increasingly become the focus of safety. Grouting reinforcement is gradually applied in subway, tunnel, bridge reinforcement, coal mine floor and other construction projects. At present, cement-based grouting materials are easy to shrink and have low strength after solidification. In order to overcome the special problems of high water pressure and high in-situ stress in deep part and improve the reinforcement effect. In view of the mining conditions of deep surrounding rock, a new type of cement-based reinforcement material was developed. We analyses the principle and main indexes of floor strengthening, and tests and optimizes the indexes and proportions of the two materials through laboratory tests. Then, observes and compares the microstructures of the optimized floor strengthening materials with those of the traditional strengthening materials through scanning electron microscopy. The test results show that 42.5 Portland cement-based grouting reinforcement material has the advantages of slight expansion, anti-dry-shrinkage, high compressive strength and high density when the water-cement ratio is 0.4, the content of bentonite is 4%, and the content of Nano Silica is 2.5%. The reinforcement effect is better than other traditional grouting reinforcement materials.

An Analysis of Profitability Study of Overseas Construction Projects using Multiple-Regression (다중회귀분석을 통한 해외 건설 프로젝트 특성요인이 손익율에 미치는 영향 분석)

  • Kim, Jineon;Kim, Yeasang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.95-103
    • /
    • 2014
  • From $1960^{th}$ Korean construction industry has been rapidly grown due to Meddle-East construction market growth. To earn foreign currency and to raise overall Korean industry government has encouraged construction frontiers. As construction industry could grow up for its labour based originity but the time passes by and overseas construction market requests engineering know-how and technology for productivity to earn more profit. Over last 20 years overseas construction market share has been dramatically raised but its profit share is gradually declining. This study analyzed data sets of over 180 overseas construction projects for last 30 years of domestic contractor by using multiple-regression analysis and derived an output how input variables of characters explaining the construction project effects its profit.

A Study on the Effects of High Embankment Road on the Microclimatic Environment (고성토 도로의 건설이 미기후 환경에 미치는 영향에 관한 연구)

  • Lim, Ik Hyoun;Hwang, Eui Jin;Ryu, Ji Hyeob
    • Journal of Korean Society of societal Security
    • /
    • v.4 no.1
    • /
    • pp.29-37
    • /
    • 2011
  • Recently, Inhabitants nearby the high embankment road have requested a civil complaint on the environmental deteriorations and economic harms. This study was carried out numerical simulation using the 3-D microclimate model 'Envi-met' in order to investigate the variations of a flow field and a temperature field at the road sections with a high embankment and a bridge. About the simulation of flow field, the wind field has changed due to the disturbance of airflow by a high embankment road considerably. And the wind velocity decreased in the whole of simulation space widely. But, the wind velocity and wind direction sited loose to the section of a bridge, relatively. In the results of a temperature field, the slight variations of temperature field were discovered by the disturb of the mixing flow from a high embankment road. These results indicate that the numerical simulation can provide useful information to minimize the disasters, such as traffic accidents and various microclimatic environments in the transportation projects.

  • PDF

INTEGRATED CONSTRUCTION PROJECT PLANNING USING 3D INFORMATION MODELS

  • Chang-Su Shim;Kwang-Myong Lee;Deok-Won Kim;Yoon-Bum Lee;Kyoung-Lae Park
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.928-934
    • /
    • 2009
  • Although the evolution and deployment of information technologies will undoubtedly play an important role in the current construction industry, many engineers are still unsure of the economic value of using these technologies. Especially for the planning of a construction project, a collaboration system to utilize the whole resources is a essential tool for the successful outcome. A detailed, authoritative, and readily accessible information model is needed to enable engineers to make cost-effective decisions among established and innovative plan alternatives. Most engineers rely on limited private experiences when they create solutions or design alternatives. Initial planning is crucial for the success of the construction project. Most construction projects are done through collaboration of engineers who have different specialized knowledge. Information technologies can dramatically enhance the performance of the collaboration. For the information delivery, we need a mediator between engineers. Object-based 3-D models are useful for the communication and decision assistance for the intelligent project design. In this paper, basic guidelines for the 3-D design according to different construction processes are suggested. Adequate interoperability of 3-D objects from any CAD system is essential for the collaboration. Basic architectures of geometry models and their information layer were established to enable interoperability for design checks, estimation and simulation. A typical international project for roadway was chosen for the pilot project. 3-D GIS model was created and bridge information models were created considering several requirements for planning and decision making of the project. From the pilot test, the integrated construction project planning using 3-D information models was discussed and several guidelines were suggested.

  • PDF

Appropriate Roles of Project Participants for Public Partnership Projects of Railways through the Organizational Behavior Theory (조직행동론을 통해서 본 민간철도 투자사업의 참여자간 갈등유형 및 역할정립 방안에 관한 사례연구)

  • Kim, Byungil;Yun, Sungmin;Han, Seung Heon;Kim, Hyung Hwe
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.6D
    • /
    • pp.839-847
    • /
    • 2008
  • No proper system exists for private investment projects, and efficient project management is not being achieved due to entanglements of management. Recognizing these circumstances, this paper has diagnosed the hard facts that project management organizations and systems are facing, and presented solutions to the factors that are obstructing the establishment of efficient project management system. This paper carried out focus group interviews on the experts who had participated in the Incheon International Airport Railway construction project, using the methodology of an exploratory case study. The results were systematically analyzed according to organizational behavior and causes corresponding to each of the problems were deduced. Private investment projects were divided into task environments and project organizations based on social science methodology and analyzed, and a final improvement plan for each participating organization was presented. An improvement plan was presented, and it was compared with the case study of Incheon bridge construction project, which is recognized as a model of successful project management, and its appropriateness evaluated.

Development of the Approximate Cost Estimating Model for PSC Box Girder Bridge based on the Breakdown of Standard Work (대표공종 기반의 PSC Box 교량 상부공사 개략공사비 산정모델에 관한 연구)

  • Kim, Sang-Bum;Cho, Ji-Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.791-800
    • /
    • 2013
  • Needs for developing a better way of cost estimating process for public construction projects have been widely recognized. Those needs are mainly from the early phases of the project through the construction life cycle due to the its importance to the control process. In contrast to the traditional estimating method based on unit-price references, this research utilized this following process. The first step is analyzing the real cost data from actual cost activities (2000~2010) about the statement of P.S.C(Prestressed Concrete) Box Girder Bridge. The collected data was broken into four categories based on technical construction methods such as I.L.M(Incremental Launching Method), M.S.S(Movable Scaffolding System), F.S.M(Full Staging Method), and F.C.M(Free Cantilever Method). The second, actual design documents including the actual cost estimating documents, drawings and specifications were carefully reviewed to cluster the cost itemized statement from four categories. It was also attempted to seek the proper breakdown of standard works that are responsible for more than 95 percentage in each categories in terms of its cost. The third, this research comes up the index for standard unit materials and unit price of standard work and develops the approximate estimating model applying for the specification(length and breadth of bridges) per square area that the user takes as well as suggests the practical application plan within the original time alloted.

A study on World Heritage conservation policies through the case of the Dresden Elbe Valley (드레스덴 엘베계곡의 사례로 본 세계유산 보존 정책)

  • Jo, Eugene
    • Korean Journal of Heritage: History & Science
    • /
    • v.48 no.2
    • /
    • pp.96-109
    • /
    • 2015
  • The Dresden Elbe Valley of Germany was delisted from the World Heritage List after a long dispute amongst the city of Dresden, UNESCO and the World Heritage Committee upon a plan to build a four-lane bridge within the boundaries of the property. The plan was claimed to threaten the Outstanding Universal Value of the heritage embedded in the view of the river landscape. However looking back on the necessity of the bridge in order to maintain the city dynamics and the needs of the local population, it is possible to diagnose that plans for the bridge had a rather different nature from the usual urban 'development' plans appearing in the vicinity of other World Heritage properties. This article examines the process that led to the delisting of the Elbe Valley from the World Heritage List and assesses the problems arising between the entities which determine the value of the heritage and the entities that implement conservation measures. Recognizing the necessity of involving the local residents, this article stresses the importance of the role of communities in heritage conservation. It is also important to set up dependable directions for establishing conservation policies which takes into account the changing dynamics of the living environment, and sound methods for assessing the impact of future projects on the heritage.

A Study on System Engineering of Light Rail Transit Private Investment Projects (경량전철 민간투자사업의 시스템엔지니어링 연구)

  • Cha, Gi-Ho;Park, Jin-Jae;Lee, Jae-Hyeong;Chu, Dong-Su
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.517-544
    • /
    • 2011
  • Promote competition in local government and the construction of a subway construction in the vicious cycle of debt due to the operating deficit as a greater burden on local finances was leave. This government policy of public transport in the center of the metro construction costs affordable and to respond appropriately to public transport demand new transit LRT(Light rail Transit) by introducing the current Busan was the opening of Line 4, yongin line, Busan - Gimhae line, parliamentary and barge construction or ready for the opening. What is light rail, compared to the existing subway and cheaper construction cost, the existing road or bridge that runs along the track is installed, etc. Manless system construction cost and operating expenses as a possible new railway transportation has been a leading state-of-the-art mad. However, the domestic business system engineering of light rail-related companies in the developed countries are doing to advance to the national to the local engineering skills of the self-free, hurry will have to be secured. Therefore, this paper applies local light rail project on the status of the systems engineering analysis and based on this source of the latest engineering technology-intensive systems engineering to provide direction to the development of technology.

  • PDF

Construction Method and Control System of the Heat of Hydration for Inchon International Airport Elevated Road Way (인천국제공항 여객터미널 전면 고가 교량 공사 시공방법 및 수화열 대책)

  • 임채만;박명웅;조용기;조선규;김은겸
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1999.10a
    • /
    • pp.869-881
    • /
    • 1999
  • Inchon International Airport Elevated Road Way is located between the Passenger Terminal Building and Transportaion Center which are Inchon International Airport core construction projects. The deck of the bridge is consists of 5-span or 6-span continuous pre-stressed concrete slab. Steel form has been used to enhance the quality of texture on concrete slab. Steel form has been used to enhance the quality of texture on concrete surface, lower surface of deck slab with the two way arch has been manufactured by highly professional manner in order to get an beautiful exterior architectural looks. The prestressed concrete deck slab is mass concrete structures with a high-specified concrete strength and a varying section in the range of 0.95-2.8m thickness. Therefore high risks of thermal cracking occurrence by heat of hydration highly are expected. To resolve such problem, we adopted type 1 cement and pipe cooking method at construction site through mass concrete specimen test and 3-dimensional analysis. For Pipe cooling we used 25mm diameter stainless pipes with wrinkles. Cooling pipe with spacing 50-60cm has been installed. And continuous pipe cooling with cooling water of 15$^{\circ}C$ was conducted for 2days. In present 8 span of all 29 spans construction has been completed. No thermal cracking heat hydration has been observed yet.

  • PDF