1 |
Ko W., (2011). "Analyzing Social Science Datum using sequential data input of SPSS", Professor, Dept. of Computer Statistics, Honam University.
|
2 |
Cho Y., Cha H. (2012). "A Study of Project Characteristics and Project Performance Level of difficulty ", Korean journal of Construction Engineering and Management, KICEM, 11(6), pp. 81-84.
|
3 |
Choi R. (2011). "A Multiple Regression Analysis on Developing the Profitability Model of Local Cultural Festivals ", Journal of the Korea society of computer and information, 16(10).
|
4 |
Kwak S., Han S. (2009). "Cost Prediction Models in the Early Stage of the Roadway Planning and Designbased on Limited Available Information ", Korean journal of Construction Engineering and Management, KICEM, 10(4), pp. 90-98.
|
5 |
Lee B., Kim J. (2012). "(An) analysis on the factors affecting the REITs returns using the regression analysis : focused on office building investment", Dept. of Sustainable Architectural Engineering, The Graduate School, Hanyang University.
|
6 |
Lowe D. J., Emsley M. W., Harding A., (2006). "Predicting Construction Cost Using Multiple Regression Techniques", Journal of Construction Engineering and Management, ASCE.
|
7 |
Mahamid I. (2011). "Early cost estimating for road construction projects using multiple regression techniques", Australasia Journal of Construction Economics and Building, 11(4) p. 87-101.
DOI
|
8 |
Sun S., Han S. (2003). "(A) study on the hierarchical structures of cause-and-effect on the profit factors in overseas construction projects", Dept. of Civil Engineering, Graduate School, Yonsei University.
|