• Title/Summary/Keyword: bridge model

Search Result 2,283, Processing Time 0.031 seconds

A Study on Reinforcement Method of Concrete Block for Direct Fixation Tracks on Serviced Light Rail Transit (공용중인 경전철 직결 궤도 콘크리트 도상블록의 보강 방안 연구)

  • Jung-Youl Choi;You-Song Kang;Dae-Hee Ahn;Jae-Min Han;Jee-Seung Chung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.3
    • /
    • pp.633-640
    • /
    • 2023
  • In this study, numerical analysis was performed based on field investigation to derive an appropriate reinforcement method by analyzing the displacement behavior characteristics of concrete blocks generated in the direct fixation track on the bridges of the serviced light rail transit. The track of this study was a direct fixation track on a sharp curved track, and the problem of movement of the concrete blocks installed on the bridge deck in the longitudinal and lateral directions occurred. In this study, based on the finite element model using 3D solid elements, the behavior of the direct fixation track that could be occurred under operating load conditions was analyzed. In addition, the reinforcement effect of various reinforcement methods was analyzed. As a result of analyzing the lateral displacement before and after reinforcement, it was analyzed that the maximum lateral displacement after reinforcement under the extreme lateral wheel loads significantly decreased to about 3% (about 0.1mm) compared to before reinforcement. In addition, as a result of examining the generated stress of the filling mortar, bridge decks, and reinforcing bar, it was analyzed that all of them secured a sufficient safety factor of 2.6 or higher, and the optimal conditions for the reinforcement method were derived. Therefore, it is judged that the number of anchoring reinforcements and symmetrical anchor placement reviewed in this study will be effective in controlling the occurrence of lateral displacement of concrete blocks and securing the structural integrity of bridges and concrete blocks.

A Study on the Correlation between Damage and Repair Volume of Bridge Maintenance (교량 유지보수의 손상물량과 보수물량 상관관계 연구)

  • Lee, Changjun;Park, Taeil
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.44 no.4
    • /
    • pp.577-585
    • /
    • 2024
  • Infrastructure plays a crucial role in the industrial development and economic growth of a nation. However, recently, domestic infrastructure has been causing not only safety risks due to aging but also social and economic inefficiencies, increasing the need for maintenance. In particular, the deterioration rate of bridges is serious, so application of appropriate repair and rehabilitation methods and estimation of its quantity are required. In this study, frequently applied repair methods for bridges using data from the Facility Integrated Management System (FMS) were identified. the empirical correlation between damage volume and the repair volume was analyzed using Bridge Management System (BMS) data. The result of the analysis showed that the ratio of the repair volume to the damage volume was 1.0. The guideline, on the other hand, suggest 1.5 the ratio of the repair volume to the damage volume. Although the guidelines differently present more conservative figures considering safety, this study is significant in that it presents a practical ratio through data analysis results. This results can be used to develop a model that can calculate the amount of repair and rehabilitation of various facilities in the future.

Stress Analysis on the Supporting Bone around the Implant According to the Vertical Bone Level (치조골 높이가 다른 임프란트 주위 지지골 응력분석)

  • Boo, Soo-Boong;Jeung, Jei-Ok;Lee, Seung-Hoon;Kim, Chang-Hyun;Lee, Seung-Ho
    • Journal of Dental Rehabilitation and Applied Science
    • /
    • v.23 no.1
    • /
    • pp.55-68
    • /
    • 2007
  • The purpose of this study was to analyze the distribution of stress in the surrounding bone around implant placed in the first and second molar region. Two different three-dimensional finite element model were designed according to vertical bone level around fixture ($4.0mm{\times}11.5mm$) on the second molar region. A mandibular segment containing two implant-abutments and a two-unit bridge system was molded as a cancellous core surrounded by a 2mm cortical layer. The mesial and distal section planes of the model were not covered by cortical bone and were constrained in all directions at the nodes. Two vertical loads and oblique loads of 200 N were applied at the center of occlusal surface (load A) or at a position of 2mm apart buccally from the center (load B). Von-Mises stresses were analyzed in the supporting bone. The results were as follows; 1. With the vertical load at the center of occlusal surface, the stress pattern on the cortical and cancellous bones around the implant on model 1 and 2 was changed, while the stress pattern on the cancellous bone with oblique load was not. 2. With the vertical load at the center of occlusal surface, the maximum von-Mises stress appeared in the outer distal side of the cortical bone on Model 1 and 2, while the maximum von-Mises stress appeared in the distal and lingual distal side of the cortical bone with oblique load. 3. With the vertical load at a position of 2 mm apart buccally from the center, there was the distribution of stress on the upper portion of the implant-bone interface and the cortical bone except for the cancellous bone, while there was a distribution of stress on the cancellous bones at the apical and lingual sides around the fixture and on the cortical bone with oblique load. 4. With the changes of the supporting bone on the second molar area, the stress pattern on the upper part of the cortical bone between two implants was changed, while the stress pattern on the cancellous bone was not. The results of this study suggest that establishing the optimum occlusal contact considering the direction and position of the load from the standpoint of stress distribution of surrounding bone will be clinically useful.

Laboratory Validation of Bridge Finite Model Updating Approach By Static Load Input/Deflection Output Measurements (정적하중입력/변위출력관계를 이용한 단경간 교량의 유한요소모델개선기법: 실내실험검증)

  • Kim, Sehoon;Koo, Ki Young;Lee, Jong-Jae
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.20 no.3
    • /
    • pp.10-17
    • /
    • 2016
  • This paper presents a laboratory validation of a new approach for Finite Element Model Updating(FEMU) on short-span bridges by combining ambient vibration measurements with static load input-deflection output measurements. The conventional FEMU approach based on modal parameters requires the assumption on the system mass matrix for the eigen-value analysis. The proposed approach doesn't require the assumption and even provides a way to update the mass matrix. The proposed approach consists of two steps: 1) updating the stiffness matrix using the static input-deflection output measurements, and 2) updating the mass matrix using a few lower natural frequencies. For a validation of the proposed approach, Young's modulus of the laboratory model was updated by the proposed approach and compared with the value obtained from strain-stress tests in a Universal Testing Machine. Result of the conventional FEMU was also compared with the result of the proposed approach. It was found that proposed approach successfully estimated the Young's modulus and the mass density reasonably while the conventional FEMU showed a large error when used with higher-modes. In addition, the FE modeling error was discussed.

Comparative Analysis on Productivity Data and Cost Estimate System of Road Bridge Construction in Korea and China (한국 및 중국 도로교량공사의 생산성자료 및 예정가격 산정시스템 비교분석)

  • Chang, Cheng;Huh, Youngki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.39-47
    • /
    • 2020
  • There are two kinds of cost estimate system in construction in china. Quota valuation model is a traditional cost estimate system under the unity of quantity and price, which is easier and has been used for decades. But the Quota valuation model becomes increasingly unsuited to the needs of society with the development of market economy. To meet the needs of China's market economy development and construction works in the field of international cooperation, the Bill of Quantities valuation model was introduced in 2003. However, there are still many shortcomings and deficiencies in the course of implementation of Bill of Quantities valuation model. In addition, interest in the Chinese construction market continues to increase in Korea due to the recent new North Korean policy and China's the Belt and Road policy. This paper aims to examine the cost estimate system of public construction works in China, and to provide basic data for deriving future improvement plans by comparing and analyzing it with standard cost estimate system in Korea.

A caving self-stabilization bearing structure of advancing cutting roof for gob-side entry retaining with hard roof stratum

  • Yang, Hongyun;Liu, Yanbao;Cao, Shugang;Pan, Ruikai;Wang, Hui;Li, Yong;Luo, Feng
    • Geomechanics and Engineering
    • /
    • v.21 no.1
    • /
    • pp.23-33
    • /
    • 2020
  • An advancing cutting roof for gob-side entry retaining with no-pillar mining under specific geological conditions is more conducive to the safe and efficient production in a coalmine. This method is being promoted for use in a large number of coalmines because it has many advantages compared to the retaining method with an artificial filling wall as the gateway side filling body. In order to observe the inner structure of the gateway cutting roof and understand its stability mechanism, an equivalent material simulation experiment for a coalmine with complex geological conditions was carried out in this study. The results show that a "self-stabilization bearing structure" equilibrium model was found after the cutting roof caving when the cut line deviation angle was unequal to zero and the cut height was greater than the mining height, and the caving roof rock was hard without damage. The model showed that its stability was mainly controlled by two key blocks. Furthermore, in order to determine the optimal parameters of the cut height and the cut line deviation angle for the cutting roof of the retaining gateway, an in-depth analysis with theoretical mechanics and mine rock mechanics of the model was performed, and the relationship between the roof balance control force and the cut height and cut line deviation angle was solved. It was found that the selection of the values of the cut height and the cut line deviation angle had to conform to a certain principle that it should not only utilize the support force provided by the coal wall and the contact surface of the two key blocks but also prevent the failure of the coal wall and the contact surface.

Investigation for flow characteristics of ice-harbor type fishway installed at mid-sized streams in Korea (국내 중소하천에 설치된 아이스하버 어도 내부 흐름 특성 규명)

  • Baek, Kyong Oh;Min, Byong Jo
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.1
    • /
    • pp.33-42
    • /
    • 2022
  • In this study, flow patterns in the ice-harbor fishway were analyzed according to fluctuations of the upstream water level, an increase of weir interval, and the presence or absence of orifices using a three-dimensional commercial numerical model, Flow-3D. In order to prove the suitability of the numerical simulation results, the flow velocity and flow rate at the exit of the fishway were observed using a 3D ultrasonic velocimetry on an actual ice-harbor fishway installed downstream of the Daegok bridge in Gyeongan-Cheon. Four types of turbulence modules can be selected for the Flow-3D model. As a result of verification with observation data, the RNG model best described the flow characteristics in the ice-harbor fishway. The velocity structure in the fishway according to fluctuations of the upstream water level was simulated. The results showed that the plunging flow and the streaming flow were mixed at the lowest water level. When the water level increased about 10 cm or more from the lowest water level, the plunging flow disappeared in all pools and only the streaming flow occurred. Contrary to expectations, even when the water level is rose a little, the flow simply occurred mainly on the streaming flow. If the interval between the weirs is increased, both the plunging flow and the streaming flow are showed continued even if the water level rises. In addition, compared to the case where there are no orifices at the bottom of the weirs, the plunging flow tends to be generated in several pools. It is necessary to prevent blocking orifices through active management so that various flow patterns in the fishway can be generated in multiple pools.

Water Level Prediction on the Golok River Utilizing Machine Learning Technique to Evaluate Flood Situations

  • Pheeranat Dornpunya;Watanasak Supaking;Hanisah Musor;Oom Thaisawasdi;Wasukree Sae-tia;Theethut Khwankeerati;Watcharaporn Soyjumpa
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.31-31
    • /
    • 2023
  • During December 2022, the northeast monsoon, which dominates the south and the Gulf of Thailand, had significant rainfall that impacted the lower southern region, causing flash floods, landslides, blustery winds, and the river exceeding its bank. The Golok River, located in Narathiwat, divides the border between Thailand and Malaysia was also affected by rainfall. In flood management, instruments for measuring precipitation and water level have become important for assessing and forecasting the trend of situations and areas of risk. However, such regions are international borders, so the installed measuring telemetry system cannot measure the rainfall and water level of the entire area. This study aims to predict 72 hours of water level and evaluate the situation as information to support the government in making water management decisions, publicizing them to relevant agencies, and warning citizens during crisis events. This research is applied to machine learning (ML) for water level prediction of the Golok River, Lan Tu Bridge area, Sungai Golok Subdistrict, Su-ngai Golok District, Narathiwat Province, which is one of the major monitored rivers. The eXtreme Gradient Boosting (XGBoost) algorithm, a tree-based ensemble machine learning algorithm, was exploited to predict hourly water levels through the R programming language. Model training and testing were carried out utilizing observed hourly rainfall from the STH010 station and hourly water level data from the X.119A station between 2020 and 2022 as main prediction inputs. Furthermore, this model applies hourly spatial rainfall forecasting data from Weather Research and Forecasting and Regional Ocean Model System models (WRF-ROMs) provided by Hydro-Informatics Institute (HII) as input, allowing the model to predict the hourly water level in the Golok River. The evaluation of the predicted performances using the statistical performance metrics, delivering an R-square of 0.96 can validate the results as robust forecasting outcomes. The result shows that the predicted water level at the X.119A telemetry station (Golok River) is in a steady decline, which relates to the input data of predicted 72-hour rainfall from WRF-ROMs having decreased. In short, the relationship between input and result can be used to evaluate flood situations. Here, the data is contributed to the Operational support to the Special Water Resources Management Operation Center in Southern Thailand for flood preparedness and response to make intelligent decisions on water management during crisis occurrences, as well as to be prepared and prevent loss and harm to citizens.

  • PDF

Wave Pressure and Wave Height Distribution around Seawall Structure Constructed by an Array of TSP Circular Piles (TSP 원형 파일 배열로 조성된 호안 구조물에 작용하는 파압 및 파고 분포)

  • Hyun-Ju Han;Woo-Sik Kim;Il-Hyoung Cho
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.36 no.4
    • /
    • pp.129-137
    • /
    • 2024
  • An analytic solution for the interaction between an array of circular piles made by joining trapezoid steel pipes (TSP) and waves was obtained using an eigenfunction expansion method. First, an analytic model for the wave scattering of multiple piles fixed at arbitrary positions was derived, and then a simplified model was obtained assuming that an infinite array of identical piles were deployed perpendicular to the propagating direc- tion of incident waves. A regular wave experiment was conducted using an experimental model with a scale ratio of 1/100 in a two-dimensional wave tank to verify the analytic solutions. The analytic results and experimental results were qualitatively consistent with each other. Using a developed analytic model, we examined the wave force on the multiple piles and the wave deformation in front of the arrayed piles. The period for the installation is greatly reduced as the TSP pile can be prefabricated in a factory. In particular, it is possible to install at the soft seabed. A seawall structure using arrayed TSP piles will be an ideal complement for a concrete seawall in future.

Study on Climate Change Impacts on Hydrological Response using a SWAT model in the Xe Bang Fai River Basin, Lao People's Democratic Republic (기후변화에 따른 라오스인민공화국의 시방파이 유역의 수문현상 예측에 대한 연구: SWAT 모델을 이용하여)

  • Phomsouvanh, Virasith;Phetpaseuth, Vannaphone;Park, Soo Jin
    • Journal of the Korean Geographical Society
    • /
    • v.51 no.6
    • /
    • pp.779-797
    • /
    • 2016
  • A calibrated hydrological model is a useful tool for quantifying the impacts of the climate variations and land use/land cover changes on sediment load, water quality and runoff. In the rainy season each year, the Xe Bang Fai river basin is provisionally flooded because of typhoons, the frequency and intensity of which are sensitive to ongoing climate change. Severe heavy rainfall has continuously occurred in this basin area, often causing severe floods at downstream of the Xe Bang Fai river basin. The main purpose of this study is to investigate the climate change impact on river discharge using a Soil and Water Assessment Tool (SWAT) model based on future climate change scenarios. In this study, the simulation of hydrological river discharge is used by SWAT model, covering a total area of $10,064km^2$ in the central part of country. The hydrological model (baseline) is calibrated and validated for two periods: 2001-2005 and 2006-2010, respectively. The monthly simulation outcomes during the calibration and validation model are good results with $R^2$ > 0.9 and ENS > 0.9. Because of ongoing climate change, three climate models (IPSL CM5A-MR 2030, GISS E2-R-CC 2030 and GFDL CM3 2030) indicate that the rainfall in this area is likely to increase up to 10% during the summer monsoon season in the near future, year 2030. As a result of these precipitation increases, the SWAT model predicts rainy season (Jul-Aug-Sep) river discharge at the Xebangfai@bridge station will be about $800m^3/s$ larger than the present. This calibrated model is expected to contribute for preventing flood disaster risk and sustainable development of Laos

  • PDF