• Title/Summary/Keyword: bridge management

Search Result 753, Processing Time 0.032 seconds

A Research on how to turn Object oriented Database of civil materials to practical use (객체지향 Data Base를 이용한 토목자재 정보의 이용방안 연구)

  • Kwon, Oh-Yong;Han, Chung-Han;Kim, Do-Keun;Jo, Chan-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.708-711
    • /
    • 2008
  • This study is intended to build research for ways to utilize material information in the design and working business for public works. The contents and results of this study can be classified into object-oriented DB application to bridge construction and object-oriented DB utilization of civil material information. First, application of object-oriented DB to bridge construction 1) constructs the work unit of classified work table as an object(Each object constructs material information on the statement of quantity calculation as data), 2) constructs object-oriented DB for superstructure and substructure of PSC Beam bridge, 3) leads to the research for ways to utilize materials by developing 3D bridge prototype with REVIT structure. Secondly, ways to utilize object-oriented DB for civil material information identified the possibility for utilizing it in making 2D drawings for design work, preparing materials list, analyzing structure for working businesses, selecting and purchasing materials, managing process and maintaining. It is suggested that the results of this study should be applied to all bridge constructions through test-bed and additional studies so as to secure the credibility of the results of this study.

  • PDF

The Ergonomic Layout of Ship's Bridge Panels using the Mathematical Programming (수리모형을 이용한 선박 항해기기 패널의 인간공학적 배치)

  • Jang, Jun-Hyuk;Kim, Hong-Tae;Sim, Joung-Hoon;Lee, Dong-Choon
    • Journal of the Ergonomics Society of Korea
    • /
    • v.30 no.1
    • /
    • pp.251-257
    • /
    • 2011
  • When designing a ship, ergonomic considerations are crucial when minimizing a navigator's fatigue due to the burden of work, and to appropriately operate the navigational equipment for each given situation by helping the operator to understand the surroundings as well as the physical functions of the ship. However, insufficient consideration of ergonomic elements in the actual design of ship Bridges is lowering the performance of safe navigation and allows for the possibility of operation or readout errors. Consequently, these errors lead to an increase in maritime accidents. Therefore, this study conducted a usability evaluation on the importance of and the usage frequency of navigational equipment, their influence on actual navigation, and the possibility of error upon operation or readout between training ship officers, to derive an optimized layout that includes the consideration of ergonomic factors for on-Bridge navigational equipment, which are currently arranged differently according to their type or size. The optimized layout of on-Bridge navigational equipment was carried out based on the evaluation results, using the Lingo program. Through the process of optimization, revised layouts of on-Bridge navigational equipments(control and display device) were suggested, considering emergency situations(ship collision, stranding, fire and explosion, sinking, etc.) during navigation.

Application of a 3D Graphic Model for Bridge Maintenance (3D 그래픽 모델을 활용한 교량 시설물 유지관리 시스템)

  • Moon, Sung-Woo;Kim, Sang-Do;Park, Mi-Kyoung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.64-71
    • /
    • 2011
  • Construction projects are becoming larger in size and higher in complexity. Operation and maintenance, therefore, is an important part in providing the serviceability of the built facility from the perspective of life-cycle. This paper presents a 3D graphic model-integrated data extraction for bridge maintenance. The 3D graphic model environment assigns attributes to the member blocks in CAD, and link the attributes to the data stored in a database. Then, the user can click the member block to extract the data associated with the attributes. A prototype has been developed to test the applicability of the 3D graphic model environment using CAD and web. Application of the system in an actual bridge construction showed that the 3D graphic model environment can help the user find necessary data at a shorter time, thereby increasing the effectiveness of operation and maintenance in bridge structures.

Analysis of Productivity Differences in Steel Bridge Manufacturing Plants According to Resource Allocation Methods for the Bottleneck (병목공정 자원할당 방식에 따른 강교 제작공장 생산성 차이 분석)

  • Lee, Jaeil;Jeong, Eunji;Jeong, Keunchae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.2
    • /
    • pp.37-49
    • /
    • 2023
  • In this study, we proposed resource allocation methodologies to improve the productivity of steel bridge manufacturing plants based on the constraint theory which is very popular in the area of manufacturing industries. To this end, after defining the painting process as a bottleneck, three resource allocation methodologies were developed: Operation Specific Resource Allocation (OSRA), Product Specific Resource Allocation (PSRA), and General Resource Allocation (GRA). As a result of experiments for performance evaluation using a simulation model of the steel bridge supply chain, GRA showed the best performance in terms of the Number of Work-In-Process (NWIP) and Waiting Time (WT), in particular, as workload itself and its variability were increased, the performance gap with the specific resource allocation became further deepened. On average, GRA reduced NWIP by 36.2% and WT by 34.6% compared to OSRA, and reduced NWIP by 71.0% and WT by 70.4% compared to PSRA. The reduction of NWIP and WT means alleviating the bottleneck of the painting process, which eventually means that the productivity of the steel bridge manufacturing plant has improved.

Analysis of Geometric Shape and Displacement in Coastal Structure (해안 구조물의 기하형상과 변위 해석)

  • Mun, Do-Yeoul;Baek, Tae-Kyung;Lee, Tack-Gon;Lee, Sung-Su
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.15 no.4
    • /
    • pp.114-123
    • /
    • 2012
  • This study is aimed to assess the stability of cable bridge by determining the geometric shape of the suspension bridge among the domestic coastal structures in public use after their completion of construction and the displacement of the target suspension bridge after public use. For this purpose, this study calculated the length between pylon piers for each period, sag, sag ratio and the displacement of pylon. Compared to the management standards for each step across different pylon behaviors of the target suspension bridge, this study found that the target suspension bridge behaves stably within the maintenance standards. To identify the behaviors of a suspension bridge accurately, the priority is put on the determination of geometric shape. Therefore, it is required to determine the surveyed shape model on a regular basis across public use period and increased traffics, which is expected to contribute considerably to ensuring the stability of the suspension bridge in its maintenance.

Integration of in-situ load experiments and numerical modeling in a long-term bridge monitoring system on a newly-constructed widened section of freeway in Taiwan

  • Chiu, Yi-Tsung;Lin, Tzu-Kang;Hung, Hsiao-Hui;Sung, Yu-Chi;Chang, Kuo-Chun
    • Smart Structures and Systems
    • /
    • v.13 no.6
    • /
    • pp.1015-1039
    • /
    • 2014
  • The widening project on Freeway No.1 in Taiwan has a total length of roughly 14 kilometers, and includes three special bridges, namely a 216 m long-span bridge crossing the original freeway, an F-bent double decked bridge in a co-constructed section, and a steel and prestressed concrete composite bridge. This study employed in-situ monitoring in conjunction with numerical modeling to establish a real-time monitoring system for the three bridges. In order to determine the initial static and dynamic behavior of the real bridges, forced vibration experiments, in-situ static load experiments, and dynamic load experiments were first carried out on the newly-constructed bridges before they went into use. Structural models of the bridges were then established using the finite element method, and in-situ vehicle load weight, arrangement, and speed were taken into consideration when performing comparisons employing data obtained from experimental measurements. The results showed consistency between the analytical simulations and experimental data. After determining a bridge's initial state, the proposed in-situ monitoring system, which is employed in conjunction with the established finite element model, can be utilized to assess the safety of a bridge's members, providing useful reference information to bridge management agencies.

Field-Observed Cracking of Paired Lightweight and Normalweight Concrete Bridge Decks

  • Cavalline, Tara L.;Calamusa, Jeremy T.;Kitts, Amy M.;Tempest, Brett Q.
    • International Journal of Concrete Structures and Materials
    • /
    • v.11 no.1
    • /
    • pp.85-97
    • /
    • 2017
  • Research has suggested that conventional lightweight concrete can offer durability advantages due to reduced cracking tendency. Although a number of publications exist providing the results of laboratory-based studies on the durability performance of lightweight concrete (with lightweight coarse aggregate) and internally cured concrete (using prewetted lightweight fine aggregate), far fewer field studies of durability performance of conventional lightweight concrete bridge decks in service have been performed. This study was commissioned to provide insight to a highway agency on whether enhanced durability performance, and therefore reduced maintenance and longer lifecycles, could be anticipated from existing lightweight concrete bridge decks that were not intentionally internally cured. To facilitate performance comparison, each lightweight bridge deck selected for inclusion in this study was paired with a companion normalweight bridge deck on a bridge of similar structural type, deck thickness, and geometric configuration, with similar age, traffic, and environmental exposure. The field-observed cracking of the decks was recorded and evaluated, and crack densities for transverse, longitudinal, and pattern cracking of the normalweight and lightweight deck in each pair were compared. Although some trends linking crack prevalence to geographic location, traffic, and age were observed, a distinct difference between the cracking present in the paired lightweight and normalweight bridge decks included in this study was not readily evident. Statistical analysis using analysis of covariance (ANCOVA) to adjust for age and traffic influence did not indicate that the type of concrete deck (lightweight or normalweight) is a statistically significant factor in the observed cracking. Therefore, for these service environments, lightweight decks did not consistently demonstrate reduced cracking.

Residual capacity assessment of in-service concrete box-girder bridges considering traffic growth and structural deterioration

  • Yuanyuan Liu;Junyong Zhou;Jianxu Su;Junping Zhang
    • Structural Engineering and Mechanics
    • /
    • v.85 no.4
    • /
    • pp.531-543
    • /
    • 2023
  • The existing concrete bridges are time-varying working systems, where the maintenance strategy should be planned according to the time-varying performance of the bridge. This work proposes a time-dependent residual capacity assessment procedure, which considers the non-stationary bridge load effects under growing traffic and non-stationary structural deterioration owing to material degradations. Lifetime bridge load effects under traffic growth are predicated by the non-stationary peaks-over-threshold (POT) method using time-dependent generalized Pareto distribution (GPD) models. The non-stationary structural resistance owing to material degradation is modeled by incorporating the Gamma deterioration process and field inspection data. A three-span continuous box-girder bridge is illustrated as an example to demonstrate the application of the proposed procedure, and the time-varying reliability indexes of the bridge girder are calculated. The accuracy of the proposed non-stationary POT method is verified through numerical examples, where the shape parameter of the time-varying GPD model is constant but the threshold and scale parameters are polynomial functions increasing with time. The case study illustrates that the residual flexural capacities show a degradation trend from a slow decrease to an accelerated decrease under traffic growth and material degradation. The reliability index for the mid-span cross-section reduces from 4.91 to 4.55 after being in service for 100 years, and the value is from 4.96 to 4.75 for the mid-support cross-section. The studied bridge shows no safety risk under traffic growth and structural deterioration owing to its high design safety reserve. However, applying the proposed numerical approach to analyze the degradation of residual bearing capacity for bridge structures with low safety reserves is of great significance for management and maintenance.

Development of an Approximate Cost Estimating Model for Bridge Construction Project using CBR Method (사례기반추론 기법을 이용한 교량 공사비 추론 모형 구축)

  • Kim, Min-Ji;Moon, Hyoun-Seok;Kang, Leen-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.42-52
    • /
    • 2013
  • The aim of this study is to present a prediction model of construction cost for a bridge that has a high reliability using historical data from the planning phase based on a CBR (Case-Based Reasoning) method in order to overcome limitations of existing construction cost prediction methods, which is linearly estimated. To do this, a reasoning model of bridge construction cost by a spreadsheet template was suggested using complexly both CBR and GA (Genetic Algorithm). Besides, this study performed a case study to verify the suggested cost reasoning model for bridge construction projects. Measuring efficiency for a result of the case study was 8.69% on average. Since accuracy of the suggested prediction cost is relatively high compared to the other analysis methods for a prediction of construction cost, reliability of the suggested model was secured. In the case that information for detailed specifications of each bridge type in an initial design phase is difficult to be collected, the suggested model is able to predict the bridge construction cost within the minimized measuring efficiency with only the representative specifications for bridges as an improved correction method. Therefore, it is expected that the model will be used to estimate a reasonable construction cost for a bridge project.