• Title/Summary/Keyword: bridge management

Search Result 739, Processing Time 0.022 seconds

BrDSS: A decision support system for bridge maintenance planning employing bridge information modeling

  • Nili, Mohammad Hosein;Zahraie, Banafsheh;Taghaddos, Hosein
    • Smart Structures and Systems
    • /
    • v.26 no.4
    • /
    • pp.533-544
    • /
    • 2020
  • Effective bridge maintenance reduces bridge operation costs and extends its service life. The possibility of storing bridge life-cycle data in a 3D parametric model of the bridge through Bridge Information Modeling (BrIM) provides new opportunities to enhance current practices of bridge maintenance management. This study develops a Decision Support System (DSS), namely BrDSS, which employs BrIM and an efficient optimization model for bridge maintenance planning. The BrIM model in BrDSS extracts basic data of elements required for the optimization process and visualizes the inspection data and the optimization results to the user to help in decision makings. In the optimization module of the DSS, the specifically formulated Genetic Algorithm (GA) eliminates the chances of producing infeasible solutions for faster convergence. The practicality of the presented DSS was explored by utilizing the DSS in the maintenance planning of a bridge under operation in the southwest of Iran.

Development of Software for Bridge Structure management on Ubiquitous based (유비쿼터스 기반 교량 구조물 유지관리 소프트웨어 개발)

  • Jo, Byung-Wan;Yang, Yo-Sub;Park, Jung-Hoon;Shin, Byung-Chul;Yoon, Kwang-Won;Kim, Heoun
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.532-537
    • /
    • 2008
  • Existing management of bridge is being writing management paper at field and computing at office. These are instability factor on bridge structure because of authenticity deterioration, disutility data management. Therefore, this paper is possibility expedient and objectivity inspection considering check situation at field for solve these problem. And development software which is intelligent bridge maintenance based Ubiquitous. This software can increase authenticity of data through computerization of maintenance data and reduce of time. Also, we confirm effective and facilitate maintenance management using ubiquitous.

  • PDF

A study on Risk-based Bridge Performance Evaluation Method for Asset Management (위험도 개념을 적용한 교량 자산관리의 성능평가방법 연구)

  • Choi, Hyun-Ho;Sun, Jong-Wan;Park, Kyung-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.22-32
    • /
    • 2013
  • Generally, asset management procedure consists of exact information collection, decision of service level, analysis of aspiration level, analysis of financial condition and available budget, preparation of asset management plan, and value of modified asset. In this study, for the risk-based asset management, condition assessment and performance measuring, assessment of failure modes and risks, evaluation/selection of treatment options, and implementation of optimum solution are additionally included. For this, bridge inventory and performance measure considering risks are classified and method of quantitative/qualitative performance measure is suggested. Also, evaluation method of risk analysis for bridge asset management is suggested and basic research is carried out for applicable method of risk-based asset management. Using suggested risk procedure and method of risk-based bridge service level evaluation, it is possible to perform resonable asset management. Moreover, it is concluded that the proposed applicable method of risk-based asset management will provide a solution to contribute the development of systematical asset management for optimal decision making and prototype asset management system.

Study about the Evaluation of Bridge Asset Valuation for Maintenance (유지관리를 위한 교량 시설물 자산 평가 방법에 대한 연구)

  • Lee, Dong Hyun;Kim, Joo Yeub;Ji, Seung-Gu;Lee, Sang Soon;Kim, Ji-won
    • International Journal of Highway Engineering
    • /
    • v.14 no.6
    • /
    • pp.13-23
    • /
    • 2012
  • PURPOSES : This study is to improve the highway management and rehabilitation efficiently by method for asset management. METHODS : Based on the literature review, The concept of this paper is to investigate the use of asset values from a Bridge management system to improvement of maintenance system more efficiently. This study is suggested for an evaluation method based on the current bridge condition by Written-down replacement cost of the assets. RESULTS : We suggests the optimization methodology of road asset valuation for budge distribution and performance measure. CONCLUSIONS : We evaluate all of national highway's bridge by the optimization methodology of road asset valuation, and suggest application methods of asset result.

Development of BIM-based bridge maintenance system for cable-stayed bridges

  • Shim, Chang-su;Kang, Hwirang;Dang, Ngoc Son;Lee, Deokkeun
    • Smart Structures and Systems
    • /
    • v.20 no.6
    • /
    • pp.697-708
    • /
    • 2017
  • Maintenance plays a critical role in the bridge industry, but actual practices show many limitations because of traditional, 2D-based information systems. It is necessary to develop a new generation of maintenance information management systems for more reliable decision making in bridge maintenance. Enhancing current work processes requires a BIM-based 3D digital model that can use information from the whole lifecycle of a project (design, construction, operation, and maintenance) through continuous exchanges and updates from each stakeholder. This study describes the development of a data scheme for maintenance of cable-stayed bridges. We implemented the proposed system for a cable-stayed bridge and discussed its effectiveness.

A CASE STUDY OF CONSTRUCTION ENGINEERING FOR CABLE SUPPORTED BRIDGE BY COLLABORATIVE SYSTEM

  • Jung-Min Nam;Sung-Ho Kim;Jae-Hong Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.586-590
    • /
    • 2011
  • This paper presents the case study of the CE by collaborative system and proposes a model of the CM group for the cable supported bridge. The cable supported bridges have a large project scale and need a high level of construction method. Therefore an advanced construction management system is required for successful completion of project. The construction management (CM) group which control design management, construction plan, subcontract, technical support and R&D is organized for the cable supported bridge project. The CM group established a collaborative system with construction site and drew an effective management of cost, process, quality, safety for each project. Furthermore, the CM group established the procedure of construction management based on the construction engineering (CE) items and performed the project management on the construction phase. Efficiency of cost reduction and site control is maximized by using a collaborative system.

  • PDF

Construction Method of Seohae Grand Bridge (서해대교 시공 공법 소개)

  • Yoon Tae Seob
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.255-266
    • /
    • 2000
  • Since 1993, Seohae grand bridge has been continued construction for 7 years and will be completed late this year. The bridge is a part of west sea castal highway and consists of 3 types of bridge including precast segmental method, free cantilever method and cable stayed bridge. A cable stayed bridge is the core of this bridge and it consists of 5 span, symetrical cable-stayed bridge with a total length of 990 m. The main span between two H-shaped pylons extending approximately 180 M above massive foundation of a cable stayed bridge is 470 m long and an approach span of that is 260 m long respectively. The circular cofferdam with 16 ea of 25 m diameter flat type sheet pile had been applied to construct foundation. The slipform method had been applied for forming of con'c of two H-shaped pylons with 3 cross beams respectively which is varied horizontally and vertically. The deck has been erected with balanced cantilever method using movable derrick crane. The stay cables is a bundle of parallel individually protected, 7 wire high tensile strands. The strands is hot deep galvanized and sheathed with a tight high density polyethylene coating. A petroleum wax fills all the inter-wire voids. The bundle of strands to prevent from deterioration due to the ambient problem covered with high density polyethylene pipe. The Isotension method has been applied for the stressing of cable strands to ensure uniformity of force in all the strands of a syay and such works has been performed on the stay specially provided in the pylon.

  • PDF

A Study on the Real Time Monitoring of Long Span Bridge Behavior Using GPS (GPS를 이용한 장대교량 실시간 거동 모니터링에 관한 연구)

  • Choi, Byoung-Gil;Sohn, Duk-Jae;Na, Young-Woo
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.28 no.3
    • /
    • pp.377-383
    • /
    • 2010
  • This study aims to develop the system which is able to monitor long span bridge behavior in real time using GPS. Through measuring displacement of long span bridge by GPS in real time, over all 3D behavior of bridge could be analyzed and managed. Monitoring system of long span bridge which is developed in this study is able to manage in real time the safety of bridge by transmitting horizontal and vertical displacement of bridge, and danger signals to an integrated operations center. Also it is able to monitor the absolute behavior of long span bridge by GPS, and to construct a national bridge safety management networks.

Bridge Appropriate Maintenance Budget Allocation Considering Safety and Service Life (교량 안전성과 공용년수를 고려한 적정 보수보강 예산 배분)

  • Sun, Jong-Wan;Lee, Huseok;Park, Kyung-Hoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.11
    • /
    • pp.130-137
    • /
    • 2017
  • To maintain traffic safety during the target lifetime of bridges, it is essential to secure an appropriate maintenance budget and allocate that budget appropriately. This paper proposes a reasonable budget allocation system that considers various impact factors to improve the conventional budget allocation method simply considering the bridge scale. The maintenance action rate model and the unit cost model based on the prior maintenance history were developed to allocate appropriately the bridge maintenance budget for the total bridges of the management organization with the target management level. A method to determine the optimal budget allocation ratio for each management subject was proposed and case analysis was conducted using the proposed model. Proper budget allocation was made considering the bridge types, current safety level, and service life as well as the bridge size as an impact factor of the budget allocation of the bridge. The developed method can prevent budget waste and provide a rational basis for budget allocation by implementing the rational budget distribution.

A Study on Development of BIM-based Asset Management Model for Maintenance of the Bridge (교량의 유지관리를 위한 BIM기반 자산관리 모델 개발에 관한 연구)

  • Kang, Jong-Min;Lee, Dong-Youl;Park, Jong-Bum;Lee, Min-Jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.3-11
    • /
    • 2012
  • The most of domestic bridge has an used life under 30 years, Future maintenance budgets can be expected to increase. However, because of bridge maintenance budgets are limited, demand for asset management being performed to achieve required performance within available budget is increasing. To perform effective asset management of bridges should be made the best use of information to occur in all phase of construction project. Therefore, the development of system and DB is required to support asset management by effective information management. The objective of this study is the development of the BIM-based bridge asset management model. Through previous research survey, BIM capabilities and asset management components were established and mutual linkages were examined. Bridge asset management model was composed of alternate assessment model. In addition, BIM-based asset management model was performed case studies to verify feasibility and applicability. The proposed model can be applied to a current bridge maintenance procedures and supported to perform effective bridge maintenance tasks within a limited budget.