• Title/Summary/Keyword: bridge information

Search Result 1,194, Processing Time 0.035 seconds

An Extension Method of IFC Model for Representing Design Information of Steel Bridge Members (강교 부재의 설계정보 표현을 위한 IFC 모델의 확장 방안)

  • Yi, Jin-Hoon;Huang, Meng-Gang;Lee, Ji-Hoon;Lee, Sang-Ho
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.524-531
    • /
    • 2008
  • A method for representing detailed design information of steel bridge member is proposed on the basis of the IFC model. As a first step, bridge related entities in the IFC-BRIDGE V2 and their functions are analyzed. In addition, design documents of steel bridge members are analyzed to extract information items that are not handled in the IFC-BRIDGE V2. It is recommended that several entities in the IFC-BRIDGE V2, such as ifcBridgeFibre, IfcBridgeReferenceLine, and IfcBridgeSection, should be properly relocated. In addition, IfcBridgeStiffener, IfcBridgeJointSystem, IfcBridgeDiaphragm, and IfcBridgeShearConnector are added as subtypes of IfcBridgeElementComponent for representing the stiffener, joint system, diaphragm, and shear connector, respectively. The added new entities inherit all attributes of IfcProduct which is linked with other resources: geometric representation, placement, material information, and so on. Thus, it is considered that a proposed in-depth IFC-BRIDGE model can be used more widely.

  • PDF

Requirement analysis for visualization of condition assessment in 3D Bridge Model (3차원 교량모델에서의 상태평가정보 가시화를 위한 요구사항 분석)

  • Huang, Meng-Gang;Kim, Bong-Geun;Lee, Sang-Ho
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.238-241
    • /
    • 2010
  • This paper proposed an approach to integrate bridge condition assessment related information with a 3D bridge model to visualize bridge condition assessment information in the 3D bridge model. In this approach, bridge information model plays a centric role in the data access and realizes the integration of bridge initial design and historical bridge maintenance records. Behind the bridge information model is a rational database. After the system requirements for this approach, several IFC data model extensions are suggested.

  • PDF

Development of a bridge-specific fragility methodology to improve the seismic resilience of bridges

  • Dukes, Jazalyn;Mangalathu, Sujith;Padgett, Jamie E.;DesRoches, Reginald
    • Earthquakes and Structures
    • /
    • v.15 no.3
    • /
    • pp.253-261
    • /
    • 2018
  • This article details a bridge-specific fragility method developed to enhance the seismic design and resilience of bridges. Current seismic design processes provide guidance for the design of a bridge that will not collapse during a design hazard event. However, they do not provide performance information of the bridge at different hazard levels or due to design changes. Therefore, there is a need for a supplement to this design process that will provide statistical information on the performance of a bridge, beyond traditional emphases on collapse prevention. This article proposes a bridge-specific parameterized fragility method to enable efficient estimation of various levels of damage probability for alternative bridge design parameters. A multi-parameter demand model is developed to incorporate bridge design details directly in the fragility estimation. Monte Carlo simulation and Logistic regression are used to determine the fragility of the bridge or bridge component. The resulting parameterized fragility model offers a basis for a bridge-specific design tool to explore the influence of design parameter variation on the expected performance of a bridge. When used as part of the design process, these tools can help to transform a prescriptive approach into a more performance-based approach, efficiently providing probabilistic performance information about a new bridge design. An example of the method and resulting fragility estimation is presented.

STEP-based Information Management of Steel Bridge Using ACIS Soild Modeler (ACIS 솔리드 모델러를 이용한 STEP기반의 강교량정보 운용체계)

  • 이상호;정연석;김소운
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2004.10a
    • /
    • pp.371-376
    • /
    • 2004
  • This study presents a way to generate and manage engineering information by applying steel bridge information model with 3D shape to existing application program. ACIS solid modeling kernel is used to visualize 3D geometric shape of steel bridge on the AutoCAD program. The shape information of 3D solid model can be connected to structural design information of steel bridge by an application module based on information model. The application module for manipulating steel bridge information can be easily developed by ObjectARX programming library supporting functional expansion of AutoCAD program. End-users can use the application module without any additional environmental setup on the AutoCAD. Thus this study facilitates information management of steel bridge by using ACIS solid modeler and ISO/STEP methodology.

  • PDF

Automatic Generation Module of IFC-based Structural Analysis Information Model Through 3-D Bridge Information Modeling (3차원 교량정보 모델링에 따른 IFC 기반 트러스교 구조해석정보 자동생성 모듈)

  • Yi, Jin-Hoon;Kim, Hyo-Jin;Lee, Sang-Ho
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.809-812
    • /
    • 2007
  • Automatic generation method of structural analysis model data for a truss bridge is presented through 3-D bridge information modeling based on Industry Foundation Classes(IFC). The mapping schema is proposed between a steel bridge information model based on STEP and a truss bridge information model based on the IFC. The geometry information from mapping is presented by IFC model, and SAP 2000 that can import the IFC file performs the structural analysis. Numerical analysis for a truss bridge is performed in this paper.

  • PDF

BrDSS: A decision support system for bridge maintenance planning employing bridge information modeling

  • Nili, Mohammad Hosein;Zahraie, Banafsheh;Taghaddos, Hosein
    • Smart Structures and Systems
    • /
    • v.26 no.4
    • /
    • pp.533-544
    • /
    • 2020
  • Effective bridge maintenance reduces bridge operation costs and extends its service life. The possibility of storing bridge life-cycle data in a 3D parametric model of the bridge through Bridge Information Modeling (BrIM) provides new opportunities to enhance current practices of bridge maintenance management. This study develops a Decision Support System (DSS), namely BrDSS, which employs BrIM and an efficient optimization model for bridge maintenance planning. The BrIM model in BrDSS extracts basic data of elements required for the optimization process and visualizes the inspection data and the optimization results to the user to help in decision makings. In the optimization module of the DSS, the specifically formulated Genetic Algorithm (GA) eliminates the chances of producing infeasible solutions for faster convergence. The practicality of the presented DSS was explored by utilizing the DSS in the maintenance planning of a bridge under operation in the southwest of Iran.

Integration of Extended IFC-BIM and Ontology for Information Management of Bridge Inspection (확장 IFC-BIM 기반 정보모델과 온톨로지를 활용한 교량 점검데이터 관리방법)

  • Erdene, Khuvilai;Kwon, Tae Ho;Lee, Sang-Ho
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.33 no.6
    • /
    • pp.411-417
    • /
    • 2020
  • To utilize building information modeling (BIM) technology at the bridge maintenance stage, it is necessary to integrate large quantities of bridge inspection and model data for object-oriented information management. This research aims to establish the benefits of utilizing the extended industry foundation class (IFC)-BIM and ontology for bridge inspection information management. The IFC entities were extended to represent the bridge objects, and a method of generating the extended IFC-based information model was proposed. The bridge inspection ontology was also developed by extraction and classification of inspection concepts from the AASHTO standard. The classified concepts and their relationships were mapped to the ontology based on the semantic triples approach. Finally, the extended IFC-based BIM model was integrated with the ontology for bridge inspection data management. The effectiveness of the proposed framework for bridge inspection information management by integration of the extended IFC-BIM and ontology was tested and verified by extracting bridge inspection data via the SPARQL query.

Applications of bridge information modeling in bridges life cycle

  • Marzouk, Mohamed M.;Hisham, Mohamed;Al-Gahtani, Khalid
    • Smart Structures and Systems
    • /
    • v.13 no.3
    • /
    • pp.407-418
    • /
    • 2014
  • The purpose of this paper is to present an Integrated Life Cycle Bridge Information Modeling that can be used throughout different phases of the bridge life cycle including: design, construction, and operation and maintenance phases. Bridge Information Modeling (BrIM) has become an effective tool in bridge engineering and construction. It has been used in obtaining accurate shop drawings, cost estimation, and visualization. In this paper, BrIM is used as an integrated tool for bridges life cycle information modeling. In the design phase, BrIM model can be used in obtaining optimum construction methods and performing structural advanced analysis. During construction phase, the model selects the appropriate locations for mobile cranes, monitors the status of precast components, and controls documents. Whereas, it acts as a tool for bridge management system in operation and maintenance phase. The paper provides a detailed description for each use of BrIM model in design, construction, and operation and maintenance phases of bridges. It is proven that BrIM is an effective tool for bridge management systems throughout their life phases.

Design and Implementation of Bridge Information System using Smart Phone (스마트폰을 이용한 교량 정보 시스템 설계 및 구현)

  • Lee, Hwa-Min;Choi, Sung-Jai
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.13 no.5
    • /
    • pp.155-161
    • /
    • 2013
  • This paper presented an augmented reality based mobile application of maintenance and management for concrete bridges. For the development of augmented reality system, it was necessary to establish the concrete bridges detail information and history of maintenance that build the database of those. Also, the augmented reality based system required that concrete bridge information presented by the mobile smart phone. Therefore, this study developed an augmented reality based concrete bridge information mobile application-All about Bridge based on android smart phone and smart pad. The proposed All about Bridge application supports a various bridge informations simultaneously using smart phone and augmented reality technology.

Development of a Bridge Disaster Management System Using GIS (GIS를 이용한 교량재해관리시스템 개발)

  • Ahn, Ki-Won;Yoo, Hwan-Hee;Choi, Yun-Soo;Shin, Sok-Hyo
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.7 no.2 s.14
    • /
    • pp.69-80
    • /
    • 1999
  • The purpose of this study is to develop a Bridge Disaster Management System for bridge safety control using Geographic Information Systems(GIS). The constructed database includes several graphic layers such as basemap, road, bridge location, etc. and has related text attributes for 32 bridges and its facilities in Chinju City. Using the language of Visual Basic 5.0, personal computer based Bridge Disaster Management System which has several functions for bridge safety analysis was developed. The developed GIS based Bridge Disaster Management System has the functions of fast and efficient data searching, file management, searching and management of bridge characteristics, bridge related map viewing, searching and management of traffic survey, bridge inspection and repair work results, and evaluating the bridge safety grades, etc..

  • PDF