• 제목/요약/키워드: bridge construction

Search Result 1,913, Processing Time 0.024 seconds

Analytical Method for Bending Moment of Slab-on-Steel-Girder Bridge (강판형교 바닥판 모멘트의 해석기법)

  • Park, Nam Hoi;Choi, Jin Yu;Yu, Chul Soo;Kang, Young Jong
    • Journal of Korean Society of Steel Construction
    • /
    • v.12 no.1 s.44
    • /
    • pp.17-28
    • /
    • 2000
  • The current specifications for bridge decks requires the same amount of upper and lower reinforcement mats. There have been many empirical activities that the partial elimination of upper reinforcing bars was not caused the structural integrity of a deck. A simplified method is derived based on thin plate theory for three and four-girder-span bridge decks. A simplified method for bridge deck considering the effect of girder deflection is proposed based on a closed-form solution that shows good agreement with the results of finite element models. In this research, a new design approach for deck slabs is proposed based on the simplified method. The negative bending moments in a deck can be evaluated with the simplified method based on the position of a wheel load, the aspect ratio and relative stiffness and the span length. This new approach can lead to a significant reduction of the quantity of the top reinforcing steel bars in a deck. Reducing the quantify of the top reinforcement not only reduces the construction costs for bridge decks, but also reduces the corrosion of reinforcement to a minimum.

  • PDF

A Correlation Analysis on Earth Pressure and Subgrade Stiffness in Bridge Abutment Transition Zone (철도 교량접속부의 토압과 노반강도와의 상관관계)

  • Kim, Jin-Hwan;Cho, Kook-Hwan
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.5
    • /
    • pp.647-655
    • /
    • 2016
  • The construction of high speed railways and improvement projects of for conventional railways require straight railway lines of railway, which leads to an increase of bridge and tunnel construction. Transition zones in railways means that the track support stiffness is variedvaries in over short ranges. Sspecial attention is required in theose transition zones since because instability of train running in train and irregularities of track irregularities are can frequently occurred. Typical transition zones are between bridges and earthworks and between tunnels and earthworks. On In a transition zone, a bridge abutment transition zone has many problems in with various causes. In this paper, fundamental problems of bridge abutment transition zones is are analyzed to enhance the understanding about of bridge abutment transition zones. Suggestions for improving problems in the transition zones are proposed.

Development and Application of Ultra High Performance Concrete (초고성능 콘크리트의 개발과 활용)

  • Kim, Sung-Wook;Park, Jung-Jun;Kang, Su-Tae;Ryu, Gum-Sung;Koh, Gyung-Taek;Lee, Jang-Hwa
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.1117-1120
    • /
    • 2008
  • In order to develop an Ultra High Performance Concrete (UHPC) suited to the Korean conditions, KICT has carried out several parts of research in the field of UHPC from 2003. KICT developed UHPC which was a structural material exhibiting very remarkable mechanical performances with compressive strength, tensile strength and flexural strength rising up to 200MPa, 15MPa and 35MPa, respectively. In addition, this material presents exceptional durability regard to the very low diffusion and penetration speeds of noxious substances like chloride ions. This 200MPa strength concrete has been effectively adopted for the construction of bridges like Sherbrooke Bridge in Canada in 1997, Sunyu Bridge in Korea in 2002, Meata Bridge in Japan in 2003, Sheperds Guelly Creek Bridge, the first ultra-high strength concrete highway bridge in Australia in 2004 and, more recently in 2005, Mars Hill highway bridge in USA in 2005. The construction of structures using ultra high performance concrete is a worldwide development trend of concrete technology for the construction of advanced facilities in the 21st century.

  • PDF

Effects of Multi-stepwise TPSM on Improving the Behavior of H-beam bridge (H형강 교량의 성능개선을 위한 다단계 온도프리스트레싱 효과 분석)

  • Ahn, Jin Hee;Kim, Jun Hwan;Jung, Chi Young;Kim, Sang Hyo
    • Journal of Korean Society of Steel Construction
    • /
    • v.19 no.5
    • /
    • pp.527-537
    • /
    • 2007
  • The main girders and cross-beams of an H-beam bridge consisted of factory-made H-beams, providing better conditions for quality control. Also, on-site fabrication works can be minimized and most of the stiffeners can be omitted, enabling simple and economic construction. In this study, the effect of the Multi-Stepwise TPSM (M-TPSM) on improving the maximum span length and section efficiency is analyzed. Compared to a 30-m-long, five-girder conventional plate girder bridge, structural analysis results showed that 50.7~55.1% of the girder height and 24.1~26.2% of the self-weight may be reduced by the application of M-TPSM to a five-girder H-beam bridge constructed with H-$900{\times}300$beams. In case of conventional H-beam bridges without M-TPSM, it was found that seven girders are required for a similar level of load-carrying capacity. Therefore, it is concluded that by the application of the M-TPSM, the H-beam bridge would become one of most cost-competitive options for short- and medium-span bridges.

Neural network based numerical model updating and verification for a short span concrete culvert bridge by incorporating Monte Carlo simulations

  • Lin, S.T.K.;Lu, Y.;Alamdari, M.M.;Khoa, N.L.D.
    • Structural Engineering and Mechanics
    • /
    • v.81 no.3
    • /
    • pp.293-303
    • /
    • 2022
  • As infrastructure ages and traffic load increases, serious public concerns have arisen for the well-being of bridges. The current health monitoring practice focuses on large-scale bridges rather than short span bridges. However, it is critical that more attention should be given to these behind-the-scene bridges. The relevant information about the construction methods and as-built properties are most likely missing. Additionally, since the condition of a bridge has unavoidably changed during service, due to weathering and deterioration, the material properties and boundary conditions would also have changed since its construction. Therefore, it is not appropriate to continue using the design values of the bridge parameters when undertaking any analysis to evaluate bridge performance. It is imperative to update the model, using finite element (FE) analysis to reflect the current structural condition. In this study, a FE model is established to simulate a concrete culvert bridge in New South Wales, Australia. That model, however, contains a number of parameter uncertainties that would compromise the accuracy of analytical results. The model is therefore updated with a neural network (NN) optimisation algorithm incorporating Monte Carlo (MC) simulation to minimise the uncertainties in parameters. The modal frequency and strain responses produced by the updated FE model are compared with the frequency and strain values on-site measured by sensors. The outcome indicates that the NN model updating incorporating MC simulation is a feasible and robust optimisation method for updating numerical models so as to minimise the difference between numerical models and their real-world counterparts.

Power spectral density method performance in detecting damages by chloride attack on coastal RC bridge

  • Mehrdad, Hadizadeh-Bazaz;Ignacio J., Navarro;Victor, Yepes
    • Structural Engineering and Mechanics
    • /
    • v.85 no.2
    • /
    • pp.197-206
    • /
    • 2023
  • The deterioration caused by chloride penetration and carbonation plays a significant role in a concrete structure in a marine environment. The chloride corrosion in some marine concrete structures is invisible but can be dangerous in a sudden collapse. Therefore, as a novelty, this research investigates the ability of a non-destructive damage detection method named the Power Spectral Density (PSD) to diagnose damages caused only by chloride ions in concrete structures. Furthermore, the accuracy of this method in estimating the amount of annual damage caused by chloride in various parts and positions exposed to seawater was investigated. For this purpose, the RC Arosa bridge in Spain, which connects the island to the mainland via seawater, was numerically modeled and analyzed. As the first step, each element's bridge position was calculated, along with the chloride corrosion percentage in the reinforcements. The next step predicted the existence, location, and timing of damage to the entire concrete part of the bridge based on the amount of rebar corrosion each year. The PSD method was used to monitor the annual loss of reinforcement cross-section area, changes in dynamic characteristics such as stiffness and mass, and each year of the bridge structure's life using sensitivity equations and the linear least squares algorithm. This study showed that using different approaches to the PSD method based on rebar chloride corrosion and assuming 10% errors in software analysis can help predict the location and almost exact amount of damage zones over time.

Experimental Study on Dynamic Characteristics of Cable-Stayed Bridge (사장교의 동특성분석에 관한 실험적 연구)

  • 황학주;김상효;전귀현;박기태;신주환
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1994.04a
    • /
    • pp.209-216
    • /
    • 1994
  • Recently, cable-supported long-span bridge are widely constructed due to improved quality of cable and development of design and construction techniques. In this study, an existing cable-stayed bridge, Dolsan Bridge, has been evaluated based on the cable forces measured using vibration method. And the finite element model using in this study for the dynamic analysis has been found to be quite comparable with dynamic mode shapes and natural frequencies estimated from experimental data induced by ambient traffic excitations.

  • PDF

Technique for Bridge Bearing Retrofit Using Wedge-Jack (교좌장치 겸용 웨지잭을 이용한 교좌장치 보수공법)

  • 백동명;유문식;임진석
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1999.10a
    • /
    • pp.837-843
    • /
    • 1999
  • A common hydraulic jack using brdige retrofit has a problem of increasing cost and time of construction to construct additionally temporary bent or concrete bracket, in case of insufficiency work space and release hydraulic pressure. To solve the problem, this technique is developed to alternate the bridge bearing in adequate inspection condition. After control maximum lift-height and minimum lift-force of no damage to super structure, the constructive technique is to alternate and repair the bridge bearing using the wedge jack with bridge bearing ability that is no release hydraulic pressure stopper, and able to reuse separable cylinder.

  • PDF

Reliability-Based Assessment of Structural Safety of Steel-Concrete Hybrid Cable-Stayed Bridge Erected by the FCM and FSM during Construction (FCM과 FSM공법에 의한 강-콘크리트 복합사장교의 신뢰성에 기초한 시공간 구조안전도평가)

  • Yoon, Jung Hyun;Cho, Hyo Nam
    • Journal of Korean Society of Steel Construction
    • /
    • v.19 no.5
    • /
    • pp.515-526
    • /
    • 2007
  • In this study, the models and methods for the safety assessment of Steel-Concrete Hybrid Cable-Stayed Bridge, which consists of steel composite girder and concrete girder erected by the FCM(Free Cantilever Method) and FSM(Full Staging Method) are proposed for the assurance of structural safety and the prevention against bridge collapse during construction. By the structural reliability approach that reasonably considers the uncertainties associated with the resistance and the load effect, the resistance and the load distribution characteristics of Steel-Concrete Hybrid Cable-Stayed Bridgeare defined and the strength limit state equations of permanent structures and temporary structures during construction are suggested. An AFOSM algorithm and MCS technique are used for the reliability analysis of cables, pylons, girders, steel-concrete conjunction part and temporary bents. Also, component reliability analyses are performed at the construction stages based on the structural system model. To demonstrate their rationality and practicality, the proposed models and approaches are applied to a real bridge. The sensitivity analyses of main parameters are performed in order to identify the critical factors that control the safety of similar bridges. As a result, it may be stated that the proposed models could be implemented as a rational and practical approach for the safety assessment of Steel-Concrete Hybrid Cable-stayed bridges erected by FCM and FSM during construction.

Construction Stage Analysis of Hybrid Composite Cable-Stayed Girder Bridge Using Eccentrically Loaded Derrick Crane (편중 가능한 사장교 가설용 데릭 크레인을 이용한 합성형 복합 사장교 시공 단계 해석)

  • Park, Taekwun;Kim, Moon Kyum;Won, Jong Hwa
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.3A
    • /
    • pp.277-286
    • /
    • 2010
  • Derrick or caterpillar crane is generally used for the long-span/cable-stayed bridge construction by pre-cast segment lifting from over-land or water transportation. The heavy weight of them, however, could make defects on unstable under-construction structure and, furthermore a method of conventional segment transportation is also able to occur additional time and cost. In this study, in order to improve conventional construction method, the newly developed derrick crane is mainly considered. It could be not only eccentrically loadable on constructing girder but having rotatable boom for segment transportation from back-side. A series of construction stage using developed derrick crane is defined and also its numerical analysis is conducted. To reflect load characteristics of developed derrick crane on construction stage analysis, on/out of service load is separately calculated by considering vertical/lateral rotation range of boom and it is loaded on 4 fixed positions of crane. The derrick crane on this study could be time and cost saving solution for cable-stayed bridge construction and also make contributions to construction load reduction in its process.