• Title/Summary/Keyword: bottleneck in management

Search Result 146, Processing Time 0.026 seconds

Analysis of Productivity Differences in Steel Bridge Manufacturing Plants According to Resource Allocation Methods for the Bottleneck (병목공정 자원할당 방식에 따른 강교 제작공장 생산성 차이 분석)

  • Lee, Jaeil;Jeong, Eunji;Jeong, Keunchae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.2
    • /
    • pp.37-49
    • /
    • 2023
  • In this study, we proposed resource allocation methodologies to improve the productivity of steel bridge manufacturing plants based on the constraint theory which is very popular in the area of manufacturing industries. To this end, after defining the painting process as a bottleneck, three resource allocation methodologies were developed: Operation Specific Resource Allocation (OSRA), Product Specific Resource Allocation (PSRA), and General Resource Allocation (GRA). As a result of experiments for performance evaluation using a simulation model of the steel bridge supply chain, GRA showed the best performance in terms of the Number of Work-In-Process (NWIP) and Waiting Time (WT), in particular, as workload itself and its variability were increased, the performance gap with the specific resource allocation became further deepened. On average, GRA reduced NWIP by 36.2% and WT by 34.6% compared to OSRA, and reduced NWIP by 71.0% and WT by 70.4% compared to PSRA. The reduction of NWIP and WT means alleviating the bottleneck of the painting process, which eventually means that the productivity of the steel bridge manufacturing plant has improved.

A Study for dispersion evacuation by behavioral characteristics based on human cognitive abilities (인간의 인지능력 기반의 행동특성이 반영된 분산대피에 관한 연구)

  • Jang, Jae-Soon;Rie, Dong-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.3
    • /
    • pp.159-166
    • /
    • 2012
  • A*algorithm is highly useful to search the shortest route to the destination in the evacuation simulation. For this reason, A*algorithm is used to evaluate the evacuation experiment by the computer simulation. However there are some problems to analyze the outcome in relation to the reality. Because all the people in the building are not well-informed of the shortest route to the exit. And they will not move to the disaster spot though it is shortest route to the exit. Therefore, evacuation simulation program based on A*algorithm raise a problem of bottleneck phenomenon and dangerous result by damage surrounding the disaster spot. The purpose of this research is to prove the necessity for dispersion evacuation simulation by Multi agent system to solve the problems of the existing evacuation simulation program based on A*algorithm.

A Study on an Equipment Performance Measurement System for Effective Bottleneck Management (병목 설비의 개선 활동에 유용한 설비관리 지표체계에 관한 연구)

  • Lee, Min-Ho;Lim, Sung-Mook
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.33 no.4
    • /
    • pp.100-113
    • /
    • 2010
  • Manufacturing companies' cost competitiveness with respect to equipment management can be achieved by satisfying additional market demands by their own capacity without purchasing additional equipments. In essence, it can be accomplished by making continuous investigation into bottlenecks and improvement on them. Therefore, equipment performance measure systems should be designed so that they can support manufacturing companies' such endeavors. With the purpose of establishing an effective equipment performance measurement system for detecting and improving bottlenecks, this study (1) suggests some desirable features that such a system should have, (2) evaluates conventional equipment performance measurement systems in terms of their usefulness for the detection and improvement of bottlenecks, and (3) proposes an improved system. We also perform a simulation experiment to demonstrate the limitations of the conventional systems and show how the proposed system can resolve the problems.

An approximation method for job shop scheduling problem with sequence independent setup time (준비시간을 고려한 job shop 스케쥴링 문제의 근사적 해법에 관한 연구)

  • 정한일;김기동;정대영;박진우
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.306-309
    • /
    • 1996
  • The job shop scheduling problem has been a major target for many researchers. And, most of the past studies did not consider setup time. In many cases of real manufacturing environment, however, there exists a setup time for each operations. The setup can be divide into two parts, one can be done after job arrival. The setup time based on the latter can be summed together with processing time, but that based on the former can not be. We propose an approximation method based on shifting bottleneck procedure for solving the job shop scheduling problem with sequence independent setup time. It schedules the machines one by one, taking a bottleneck machine among the machines not yet scheduled. Every time after a new machine is scheduled, all schedules previously established are updated. Both the bottlenck search and the schedule updating procedure are based on solving a single machine scheduling problem with ready time, setup time and delivery time iteratively.

  • PDF

Development of Financial Effect Measurement(FEM) Models for Quality Improvement and Innovation Activity (품질개선 및 혁신활동에서 재무성과 측정모형의 개발)

  • Choi, Sungwoon
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.1
    • /
    • pp.337-348
    • /
    • 2015
  • This research introduces the Financial Effect Measurement (FEM) models which measures both the improvement and the innovation performance of Quality Control Circle (QCC) and activities of Six Sigma. Concepts and principle of Comprehensive Income Statement (CIS), Balanced Scorecard (BSC), Time-Driven Activity Based-Costing (TDABC) and Total Productive Maintenance (TPM) are applied in order to develop the 4 FEM models presented in this paper. First of all, FEM using CIS depicts the improvement effects of production capacity and yield using relationships between demand and supply, and line balancing efficiency between bottleneck process and non-bottleneck processes. Secondly, cause-and-effect relation of Key Performance Indicator (KPI) is used to present Critical Success Factor (CSF) effects for QC Story 15 steps of QCC and DMAIC (Define, Measure, Analyze, Improve, and Control) of Six Sigma. The next is FEM model for service management innovation activities that uses TDABC to calculate the time-driven effect for improving the indirect activities according to the cost object. Lastly, FEM model for TPM activities presents the interpretation of improvement effect model of TPM Capital Expenditure (CAPEX) and Operating Expenditure (OPEX) maintenance using profit, cash and Economic Added Value (EVA) as metrics of enterprise values. To better understand and further investigate FEMs, recent cases on National Quality Circle Contest are used to evaluate new financial effect measurement developed in this paper.

A Study on Effective Building Plan of Supporting Systems of Local Government Public Service Business - Centered on Case Study Seo Gu District Office in Gwang Ju City - (지방행정업무지원시스템의 효율적 구축방안에 관한 연구 - 광주서구청 사례를 중심으로 -)

  • Yim, Ki-Heung;Choi, Kwang-Don;Lee, Su-Yeon
    • Journal of Digital Convergence
    • /
    • v.6 no.1
    • /
    • pp.43-52
    • /
    • 2008
  • Managing of local government public service business is innovation strategy of local government public service business using choice and competition principle. Managing strategy of local government public service business is new paradigm for innovating public service business and role structure of government. It is important to understand properly substance and characteristics of local government public service business. Accordingly, the purpose of this study find bottleneck of local government public service business and take out improvement plan and suggest policy plan of Seo Gu District Office in Gwang Ju City in the future.

  • PDF

An integrated model of cell formation and cell layout for minimizing exceptional elements and intercell moving distance (예외적 요소와 셀간 이동거리를 최소화할 수 있는 셀 형성과 셀 배치결정 모형)

  • 윤창원;정병희
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.121-124
    • /
    • 1996
  • In general, cellular manufacturing system can be constructed by the following two steps. The first step forms machine cells and part families, and the second step determines cell layout based on the result of first step. Cell layout has to be considered when cell is formed becauese the result of cell formation affects it. This paper presents a cell formation algorithm and proposes an integrated mathematical model for cell formation and cell layout. The cell formation algorithm minimizes the number of exceptional element in cellular manufacturing system. New concept for similarity and incapability is introduced, based on machine-operation incidence matrix and part-operation incidence matrix. One is similarity between the machines, the other is similarity between preliminary machine cells and machines. The incapability identifies relations between machine cells and parts. In this procedure, only parts without an exceptional element are assigned to machine cell. Bottleneck parts are considered with cell layout design in an integrated mathematical model. The integrated mathematical model determines cell layout and assigns bottleneck parts to minimize the number of exceptional element and intercell moving distance, based on linearixed 0-1 integer programming. The proposed algorithm is illustrated by using numerical examples.

  • PDF

A Simulation on The BLU Assembly Line (시뮬레이션을 이용한 백라이트유닛의 생산공정예측)

  • Kim, Seung-Nam;Moon, Je-Chang;Rim, Suk-Chul
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2005.05a
    • /
    • pp.1047-1051
    • /
    • 2005
  • Many corporation invest in LCD industry because of The growth of it. Back Light Unit(BLU), LCDs' main part take 20% of its product costs. In this paper we proposed simulation model that is in the process of introducing an equipment, We try to apply a simulation model in the BLU Assembly line by using ARENA. We make BLU Assembly line with various part storage, product strorage. etc. We evaluate Logistics in Assembly Line, and forecast bottleneck and throughput

  • PDF

Bottleneck Scheduling for Cycletime Reduction in Semiconductor Fabrication Line (반도체 FAB공정의 사이클타임 단축을 위한 병목일정계획)

  • 이영훈;김태헌
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2001.10a
    • /
    • pp.298-301
    • /
    • 2001
  • In semiconductor manufacturing, wafer fabrication is the most complicated and important process, which is composed of several hundreds of process steps and several hundreds of machines involved. The productivity of the manufacturing mainly depends on how well they control balance of WIP flow to achieve maximal throughput under short manufacturing cycle time. In this paper mathematical formulation is suggested for the stepper scheduling, in which cycle time reduction and maximal production is achieved.

  • PDF