Browse > Article
http://dx.doi.org/10.12812/ksms.2015.17.1.337

Development of Financial Effect Measurement(FEM) Models for Quality Improvement and Innovation Activity  

Choi, Sungwoon (Department of Industrial Engineering, Gachon University)
Publication Information
Journal of the Korea Safety Management & Science / v.17, no.1, 2015 , pp. 337-348 More about this Journal
Abstract
This research introduces the Financial Effect Measurement (FEM) models which measures both the improvement and the innovation performance of Quality Control Circle (QCC) and activities of Six Sigma. Concepts and principle of Comprehensive Income Statement (CIS), Balanced Scorecard (BSC), Time-Driven Activity Based-Costing (TDABC) and Total Productive Maintenance (TPM) are applied in order to develop the 4 FEM models presented in this paper. First of all, FEM using CIS depicts the improvement effects of production capacity and yield using relationships between demand and supply, and line balancing efficiency between bottleneck process and non-bottleneck processes. Secondly, cause-and-effect relation of Key Performance Indicator (KPI) is used to present Critical Success Factor (CSF) effects for QC Story 15 steps of QCC and DMAIC (Define, Measure, Analyze, Improve, and Control) of Six Sigma. The next is FEM model for service management innovation activities that uses TDABC to calculate the time-driven effect for improving the indirect activities according to the cost object. Lastly, FEM model for TPM activities presents the interpretation of improvement effect model of TPM Capital Expenditure (CAPEX) and Operating Expenditure (OPEX) maintenance using profit, cash and Economic Added Value (EVA) as metrics of enterprise values. To better understand and further investigate FEMs, recent cases on National Quality Circle Contest are used to evaluate new financial effect measurement developed in this paper.
Keywords
FEM; Production Capacity; Yield; QC Story 15 Steps; Six Sigma; KPI Cascading; Indirect Activity; Time-Driver; CAPEX; OPEX;
Citations & Related Records
Times Cited By KSCI : 6  (Citation Analysis)
연도 인용수 순위
1 Ayvaz E., Pehlivanli D.(2011), "The Use of Time-Driven Activity-Based Costing and Analytic Hierarchy Process Method in the Balanced Scorecard Implementation", International Journal of Business and Management, 6(3):146-158.
2 Barakat A.(2012), "Cost-Integration Between Balanced Scorecards and 6 Sigma and its Role in Enhancing the Overall Quality of Industrial Companies", The Business Review, 20(1):345-359.
3 Choi S.(2013), "The Linkage Between Productivity Metrics and Financial Accounting Metrics in TPM and PAC Activities", Journal of the Korea Safety Management and Science, 15(3):151-161.   DOI
4 Choi S.(2013), "Development and Implementation of Extension Models Based on the Review of Cash Flow Models", Journal of the Korea Safety Management and Science, 15(4):135-448.   DOI
5 Choi S.(2014), "Development and Implementation of Extension Models for Activity-Based Costing", Journal of the Korea Safety Management and Science, 16(1):239-250.   DOI
6 Choi S.(2014), "Implementation Strategy Based on the Classification of Depreciation Models", Journal of the Korea Safety Management and Science, 16(2)217-230.   DOI
7 Choi S.(2014), "Development of Integrated System of Time-Driven Activity-Based Costing(TDABC) Using Balanced Scorecard(BSC) and Economic Value Added(EVA)", Journal of the Korea Safety Management and Science, 16(3):451-169.   DOI
8 Cooper R., Slagmulder R.(1999), "Integrating Activity-Based Costing and Economic Value Added", Management Accounting, 80(7):16-17.
9 Heavey C., Murphy E.(2012), "Integrating the Balanced Scorecard with Six Sigma", The TQM Journal, 24(2):108-122.   DOI
10 Kim H., Jeong J., Kim C.(2009), "A Method of an Accurate Six Sigma Financial Effect Measurement and Connecting the Financial Effect to the Corporate Income Performance", Journal of the Korean Society for Quality Management, 37(3):94-101.
11 Komiya K.(1998), Cash Flow Management, Toyo Keizai Inc..
12 Kornfeld B., Kara S.(2011), "Project Portfolio Selection in Continuous Improvement", International Journal of Operations Production Management, 31(10):1071-1088.   DOI
13 Kulkarni S., Messina J., Ding X., Bishu R.(2008), "Integration of Balanced Scorecard with Six Sigma", Proceedings of the 2008 Industrial Engineering Research Conference, 1166-1171.
14 Liberatore M.J., Miller T.(1998), "A Framework for Integrating Activity-Based Costing and the Balanced Scorecard into the Logistics Strategy Deployment and Monitoring Process", Journal of Business Logistics, 19(2):131-154.
15 Pan J., Cheng M.(2008), "An Empirical Study for Exploring the Relationship Between Balanced Scorecard and Six Sigma Programs", Asia Pacific Management Review, 13(2):481-496.
16 Pineno C.J.(2012), "Simulation of the Weighting of Balanced Scorecard Metrics: Including Sustainability and Time-Driven ABC Based on the Product Life Cycle", Management Accounting Quarterly, 13(2):21-38.
17 Ray S., Das P.(2010), "Six Sigma Project Selection Methodogy", International Journal of Lean Six Sigma, 1(4):293-309.   DOI
18 Song I.(2012), Six Sigma Bible: FEA, Yidambooks.
19 Roztoki N., Needy K.L.(1999), "Integrating Activity-Based Costing and Economic Value-Added in Manufacturing", Engineering Management Journal, 11(2):17-22.   DOI
20 Shin I., Kim W.(2007), "Methodology of Financial Effect Analysis with Six Sigma", Journal of the Korean Institute of Plant Engineering, 12(2):65-74.
21 Sung S., Yun T., Byun J.(2008), "Six Sigma Performance Evaluation System and Case Study for Order-Based Industry", Journal of the Korean Society for Quality Management, 36(3):45-54.
22 Suzuki T.(1994), TPM in Assembly Industries, Productivity Press.
23 Suzuki T.(1994), TPM in Process Industries, Productivity Press.
24 Winfrey R.(1935), Statistical Analyses of Industrial Property Retirements, Bulletin 125, Iowa Engineering Experiment Station, Iowa State College of Agriculture and Mechanics Arts Official Publication.
25 www.q-korea.net
26 www.edaily.co.kr