A Case Study to Minimize Effect of Blasting Vibration and Noise on Animal Casualties (발파진동과 소음이 가축에 미치는 영향에 관한 사례연구)

  • 안명석;김종대;황소중
    • Journal of KSNVE
    • /
    • v.11 no.1
    • /
    • pp.104-110
    • /
    • 2001
  • The demand of blasting work in civil engineering work is increasing because of the increasing social infra-structural construction work. The blasting method creates large benefit in regard to the economic aspect and shortening construction period. This method, however, has problems to be solved in respect to the blasting vibration and noise. Blasting vibration and noise have been studied by many workers, regarding to the impact on the structure and human body. This investigation is concerned on the affect of blasting vibration and noise on the animals which is relatively new. In general, animals have inferior mental capacity than human in hearing but have higher sensitivity on the vibration and noise due to blasting. The object of this study is to investigate an appropriate measurement of lessening damage on the animals by vibration and noise due to blasting.

  • PDF

Vibration and Noise Analysis According to Blasting Method (발파공법에 따른 진동 및 소음 분석)

  • Kim, Min-Hyouck
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.150-151
    • /
    • 2022
  • Blasting is a method that uses explosives to crush the ground. This method is a highly efficient ground cleaning method that can secure high efficiency in a short time. However, explosions can damage local properties and produce high noise and vibration. Therefore, it is important to be careful because there are disadvantages such as the occurrence of many complaints from the surrounding area. In this paper measured and analyzed the noise and vibration generated during blasting at the blasting site in Korea. The noise and vibration generated during blasting were measured by ES03303.2b and ES03402.2a at a distance of 6 m, 12 m from the blasting point. As a result of the measurement, there was little difference between small and medium scale except for precision vibration blasting at a distance of 6m, but noise difference according to blasting scale was evident at a distance of 12m. As a result of the measurement, the maximum noise level was reduced to 5.5 dB(A) and the vibration level was reduced to 7.7 dB(V). In the future, the reliability of the test results can be further improved through additional tests, and it is judged that noise and vibration prediction models based on blasting methods, amount of charge, measuring distance, etc. can be developed.

  • PDF

A Comparative Study on the Regulation of Explosive Noise in Demolition Work at Home and abroad (국내외 철거작업시 발파소음 규제에 대한 비교 연구)

  • Ki-Taek Oh
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.4
    • /
    • pp.984-992
    • /
    • 2023
  • Purpose: The core problem of this study is that there are no specific noise regulation standards for domestic blasting work. Currently, the domestic blasting work noise regulation standard has not been established separately, and the noise regulation standard of 80 decibels is corrected by 10 decibels to 70 decibels, which is the daily living noise standard. In contrast, many foreign countries have separate noise regulation standards specifically tailored to blasting work. Accordingly, it is intended to present international reasonable blasting noise standards by comparing domestic and foreign blasting work noise regulation standards. Mmethod: This study can be inferred as a comparative analysis of domestic and foreign noise regulation standards. Data on the current noise regulation standards during domestic blasting and noise regulation standards during blasting operations in the United States, the United Kingdom, Australia, Japan, and China are collected and analyzed. Results: According to the study, the noise regulation value during blasting work at domestic construction sites was not separately established, so it was not properly tailored to the specific and characteristics of blasting noise. In the case of overseas, a realistic noise regulation value was established so that a safer, more efficient and eco-friendly blasting method could be applied to the noise regulation value uniformly during blasting work. Conclusion: In this study, it is hoped that noise regulations will be established during reasonable blasting work, as shown in domestic and international comparative studies, and will be widely adopted without interfering with the introduction of efficient, economical, and eco-friendly blasting methods by complying well with blasting safety standards.

A Study on the Installation Time and Method of Soundproofing Facilities According to Tunnel Blasting Work (터널발파작업에 따른 방음시설의 설치시기와 방법에 대한 고찰)

  • Won, Yeon-Ho;Son, Young-Bok;Jeong, Jai-Hyung
    • Explosives and Blasting
    • /
    • v.25 no.1
    • /
    • pp.1-14
    • /
    • 2007
  • A blasting noise generated by blasting work, which is a kind of shock-noise, influences the human body. A civil appeal due to blasting noise causes work discontinuance and downsizing of a blasting scale. Most of soundproof facilities for reducing a blasting noise is installed at each working spot by itself and the degree of a noise reduction is very low. The aim of this study is to recommend a technology on noise reduction considering the method and material of soundproof facilities. As the first study step to acquire basic data, investigations on the installation time, installation method, and material of the soundproof facilities have been done at about 20 tunnel work spots such as railroad tunnel, road tunnel, tunnel for electric power.

The Development of Soundproof System for the Blasting Noise Reduction in Tunnels (터널 발파소음 감쇠를 위한 방음시스템 개발)

  • 노상림;김욱영;조영천;이상필;유지영
    • Explosives and Blasting
    • /
    • v.22 no.1
    • /
    • pp.67-74
    • /
    • 2004
  • Blasting in urban area has become a serious issue in our living because it causes inconvenience to the resident living by construction area. Therefore, the practical solution and the better method for reducing blasting noise are highly required. However, finding practical solutions for the blasting noise is very difficult due to the lack of basic data and insufficient existing research. In order to overcome the limitation of existing sound barrier, we applied a new material to multi-layer soundproof system in the construction site, Kuksabong Tunnel in Yang Nyung-Ro. The statistical method was used to analyze blasting noise data. Through all these processes, it was verified that the soundproof system in this study was very effective method to decrease blasting noise.

A Case on Excavation Plan and Design of Adjacent Railroad Tunnel (근접 철도터널의 굴착계획 및 설계 사례)

  • 김선홍;정동호;석진호;정건웅;서성호
    • Explosives and Blasting
    • /
    • v.20 no.3
    • /
    • pp.59-71
    • /
    • 2002
  • The points of this design case are the planning and excavation method of a new double-tracked railroad tunnel which is approx. 11∼22 meters apart from existing single-tracked railroad tunnel. For the optimum excavation method some needs are required in design stage, such as the reduction of noise and vibration, public resentment, damage of buildings and construction costs. Hence the estimation and application of allowable noise and vibration criterion is important. The ground coefficient (K, n) of this site is determined by field trial blasting. The excavation method is chosen to satisfy the allowable noise and vibration criterion. In addition, in order to ensure the stability of existing single-tracked railroad tunnel, the instrumentation of maintenance level is accompanied during the construction stage. As a result of this design condition, central diaphragm excavation with line drilling and pre-large hole boring blasting is applied to the area within 15 meters apart from existing tunnel. And above 15 meters apart, pre-large hole boring blasting is designed.

A Study on Data Analysis of Ground Vibration.Noise Dust Dispersion Measurement for Enhancing Safety at the Construction Sites - Focussed on Blasting and Piling in Sedimentary and Igneous Rocks in the Youngnam Area - (건설 현장에서 안전성 향상을 위한 지반진동.소음.비산먼지 측정자료의 분석에 관한 연구 -영남지역의 퇴적암.화성암층에서의 발파 및 항타작업을 중심으로-)

  • 안명석;류창하;박종남
    • Explosives and Blasting
    • /
    • v.19 no.3
    • /
    • pp.91-104
    • /
    • 2001
  • As in Korean environments with mountainous and hilly areas, the rock generally has to be removed in construction or civil engineering work in tunnelling or excavation for development in urban area. Explosives should be used for blasting, which may cause serious problems on local people for their claim for compensation due to ground vibration, noise. For safe and economic blasting, geology and engineering characteristics of rocks such as discontinuities of rock or weathering are very important factors, together with site characteristics for prediction of ground vibration. In this study, conducted were the detailed study for major rocks most widely distributed in the South-east area, in-situ geological survey, geological and geochemical analysis, and further laboratory uniaxial rock stress, seismic velocity of core samples together with in-situ seismic velocity measurements. Regulations on ground vibration and noise were reviewed for assessing their adaptabilities, and a total of 4,856 measured blasting vibration data were examined for enhancing the confidence level in estimating the predictive formulation using scaled distance statistically.

  • PDF

A Study on the Efficiency of Horizontal Direction Deck-charge Blasting Method Using Electronic Detonator (전자뇌관을 이용한 수평방향 데크차지 발파공법의 효율성검토 연구)

  • Yoon, Ji-Sun;Hahn, Suk-Ju;Bae, Sang-Hun
    • Journal of the Korean Geotechnical Society
    • /
    • v.29 no.4
    • /
    • pp.5-11
    • /
    • 2013
  • In close to downtown construction, the main problem is complaints caused by blasting vibration and noise. To reduce blasting vibration and noise, deck-charge blasting method using electronic detonator can be more secure because there is no cut-off problem. And in this method it is possible to blast in horizontal direction. In this study, the efficiency of horizontal direction deck-charge blasting method using electronic detonator is compared to that of the existing blasting method. And the possibility of applying the construction site is evaluated. As a result, the reduction of blasting vibration, noise and secondary breaking has been determined, as well as large-scale blasting in the vibration criterion can be regulated by the overall increase in blasting efficiency.

Study on the Acceptance Level for Damage due to Underwater Noise from the Case Study of Field Measurement at Marphysa sanguinea Farm (바위갯지렁이 양식장 인접지역 계측 사례를 포함한 수중소음 피해인정기준에서 배경소음과의 차에 대한 문제점)

  • Choi, Tae-Hong;Kim, Jae-Woong;Ko, Chin-Surk
    • Explosives and Blasting
    • /
    • v.35 no.1
    • /
    • pp.34-42
    • /
    • 2017
  • It is very difficult to clearly define the damages caused by blasting-induced noise and vibration, because the damages depend on, besides the level of noise and vibration, the response of the object, environmental conditions, subjective feeling, and mental condition. Especially, it is more difficult when the fish is concerned, because that experimental approach is not easy and that we lack of the reasonable criterion for the acceptance level of noise and vibration. In Korea, the acceptance level for damage due to underwater noise is 140 dB re $1{\mu}Pa$, and the difference from the underwater background sound level is defined as more than 20 dB re $1{\mu}Pa$. It is however, appropriate for continuous noise not for transient sound. The authors compared the relationship between vibration velocity and underwater noise measured from the test blasting around Marphysa sanguinea farm. This paper presents the measurement results and suggestions the acceptance level for damage due to underwater noise from explosive blasting.

A Tunnel Blasting Method Favorable to the Environment, which Utilizes Pre-splitting & an Upper Center Cut. (선균열과 상부 심빼기를 이용한 환경 친화적 터널발파공법)

  • 김일중;김영석;기경철
    • Explosives and Blasting
    • /
    • v.20 no.2
    • /
    • pp.7-19
    • /
    • 2002
  • The cut is placed high up in the section, the 1st sloping holes below the cut, and divided all the holes located below the 1st sloping holes into a certain area with longitudinal section, to lower pollution made from tunnel blasting. With the sequential blasting machine, after I first blasted holes around the cut holes by a pre-splitting method, blasted the cut area and the 1st sloping holes. The 1st and 2nd sloping holes divided areas are initiated gradually to free face upwards made by the cut. Especially, I pre-splinted contour holes previous blast the before sloping holes from the contours. The ground vibration from the earth surface just over the advance face decreased about 42.0% compare with the down blasting method under the condition of equal charge weight per delay. I controlled the crack and over break of the mother rock by pre-splitting contour holes before blast the first sloping holes from the contours. The peak values of noise and air blast by blasting decreased about 10dB more than the down blasting method. the noise and air blast diminished gradually as a round. The throw distance of the fly rock was decreased about 55%.