• Title/Summary/Keyword: blasting

Search Result 1,532, Processing Time 0.023 seconds

The Development of Soundproof System for the Blasting Noise Reduction in Tunnels (터널 발파소음 감쇠를 위한 방음시스템 개발)

  • 노상림;김욱영;조영천;이상필;유지영
    • Explosives and Blasting
    • /
    • v.22 no.1
    • /
    • pp.67-74
    • /
    • 2004
  • Blasting in urban area has become a serious issue in our living because it causes inconvenience to the resident living by construction area. Therefore, the practical solution and the better method for reducing blasting noise are highly required. However, finding practical solutions for the blasting noise is very difficult due to the lack of basic data and insufficient existing research. In order to overcome the limitation of existing sound barrier, we applied a new material to multi-layer soundproof system in the construction site, Kuksabong Tunnel in Yang Nyung-Ro. The statistical method was used to analyze blasting noise data. Through all these processes, it was verified that the soundproof system in this study was very effective method to decrease blasting noise.

A Case Study of Air Ball Blasting Method (에어볼 발파공법에 의한 진동 및 폭음 계측연구)

  • Lee Shin;Kim Sang-Wook;Kang Dea-Woo
    • Explosives and Blasting
    • /
    • v.23 no.2
    • /
    • pp.15-21
    • /
    • 2005
  • Already, VARI-STEM, CAS-BAG, POWER DECK etc. are used by various blasting methods to take the advantage of air decking technology in abroad. This study analyzed the application and the effect of Air ball blasting method in domestic blasting area. It is shown that blasting vibration was showed decrease about $30\~40\%$ and quantities of explosives was shown decrease about $20\~25\%$. Also, in the case of using air ball blasting method, it is found for airblast to be lower than common blasting method.

Electronic Blasting Case Study Method Using Deck Charge (분상장약공법을 이용한 전자발파 시공사례)

  • Kim, Gab-Soo;Son, Young-Bok;Kim, Jae-Hoon;Choi, Hyung-Bin
    • Explosives and Blasting
    • /
    • v.33 no.1
    • /
    • pp.27-34
    • /
    • 2015
  • Recently, the residence complaints have been increased by blast vibration and noise issue due to increased urban blasting works so that the trouble between construction company and residence have been continuously increased. Deck-charge blasting method using electronic detonator provided not only blast vibration and noise control but also minimized residence complaints through shortening of the blasting period. This blasting method will be widely used for maximizing urban blasting productivity.

A Study on the Installation Time and Method of Soundproofing Facilities According to Tunnel Blasting Work (터널발파작업에 따른 방음시설의 설치시기와 방법에 대한 고찰)

  • Won, Yeon-Ho;Son, Young-Bok;Jeong, Jai-Hyung
    • Explosives and Blasting
    • /
    • v.25 no.1
    • /
    • pp.1-14
    • /
    • 2007
  • A blasting noise generated by blasting work, which is a kind of shock-noise, influences the human body. A civil appeal due to blasting noise causes work discontinuance and downsizing of a blasting scale. Most of soundproof facilities for reducing a blasting noise is installed at each working spot by itself and the degree of a noise reduction is very low. The aim of this study is to recommend a technology on noise reduction considering the method and material of soundproof facilities. As the first study step to acquire basic data, investigations on the installation time, installation method, and material of the soundproof facilities have been done at about 20 tunnel work spots such as railroad tunnel, road tunnel, tunnel for electric power.

A Case of the Alternative Method to Improve the Ambient Vibration Blasting Method Applied NATM Tunnel Construction in Urban Areas (도심지 NATM 터널 굴착시 적용된 미진동발파 공법 개선사례)

  • Lee, Jong-Yoon;Hwang, Yeon-Soo;Choi, Hack-Yong;Bae, Hyo-Jin
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.535-542
    • /
    • 2010
  • Various difficulties have been increased in the construction of public structure; like the road in the overcrowding urban area, because of civil complaint, cost and period of construction. In oder to overcome these social problems, the tunnel has been planned the road design. Despite the resolution, there are many technical problems when constructed near facilities. The design of new tunnel below the existing service reservoir is applied to the ambient vibration blasting using Plasma. The result of test blasting was exceeded the standard ("2kine"). So it was considered a countermeasure for the vibration reduction applied to change the controlled blasting method, reduce the charge, add the pre middle horizontal hole in the cut blasting site, and so on. The result was satisfied the standard. Accordingly, if the quality of blasting process can be managed well, the application of this alternative method is highly effective one. Also, based on cost analysis between two methods, the alternative method is very competitive.

  • PDF

A Case of Application-blasting in the Urban Blasting Works (도심지 터파기를 위한 응용발파 시공 사례)

  • Kim, Taihyun;Park, Yongwon;Cho, Raehun;Kim, Hongyool;Jeong, Byungho
    • Explosives and Blasting
    • /
    • v.34 no.2
    • /
    • pp.18-30
    • /
    • 2016
  • A drill & blasting method using explosives is the most efficient way to break the rock in the urban projects. However, the blasting method cause vibration, noise and fly-rock as blast pollutions so that blasting wroks are restricted by adjacent structures such as apartment and residence houses. To conduct blasting works at near structures, the numbers of blast-holes a blast and the size of the blast are limited by kinds of detonators and initiation methods. So, the production rate is reduced and the construction period should be increased. Therefore, in this case the deck-charge blasting methods using available detonators in domestic market were designed and evaluated in order to confirm the application possibilities in specific urban sites.

Effects of Blasting Vibrations on Strength and Physical Properties of Curing Concrete (발파진동의 크기가 양생콘크리트의 강도와 물성에 미치는 영향)

  • 임한욱;박근순;정동호;이상은
    • Tunnel and Underground Space
    • /
    • v.5 no.2
    • /
    • pp.134-143
    • /
    • 1995
  • Effects of blasting vibrations on curing concrete have not been well studied. As a result, unreasonable and strong blasting vibration constraints have been placed on blasting when it occurs in the vicinity of curing concrete. To study the effects of blasting on curing concrete blocks of 33.3X27.7X16.2 cm were molded and placed on the quarry. Several sets of concrete blocks were subjected separately to peak vibrations of 0.25, 0.5. 1.0, 5.0, and 10cm/sec. The impulses of blasting vibrations were applied with thirty-minute intervals. Along with unvibrated concrete blocks, the vibrated concrete samples cored with 60.3 mm in diameter were measured for elastic moduli, sonic velocity and uniaxial compressive strength. Test results can be summarized as follows; 1. The blasting vibrations between 6 and 8 hours after pour generally lowered on the uniaxial compressive strength of the concrete. 2. A low blasting vibration of 0.25 cm/sec did not affect the uniaxial compressive strength. As the magnitude of the blasting vibration increases, compressive strength of concrete is decreased. 3. Physical properties of the P-wave velocity, Young's modulus, and Poisson's ratio showed a weakly decreasing trend in the concrete blocks vibrated between 6 and 8 hours after pour.

  • PDF

A Calculation of Blasting Load using Input Identification Method & Evaluation of Structure's Vibration in Numerical Analysis (역해석기법을 통한 발파하중 산정 및 수치해석을 이용한 구조물의 진동영향평가)

  • Choi Jun-Sung;Lee Jin-Moo;Jo Man-Seop
    • Tunnel and Underground Space
    • /
    • v.16 no.3 s.62
    • /
    • pp.232-240
    • /
    • 2006
  • In this paper, the blasting load has been calculated using Input Identification method and measured data in borehole blasting to reflect the exact blast behavior and soil vibration. The fitness of calculated blasting load is examined by comparing measured data and results of numerical analysis. According to the results, blasting load estimated by Input Identification method was more adequate than proposed blasting pressure equation in the reflection of blast behavior and soil vibration. In addition, it showed more reasonable results at the evaluation of structure's vibration in the 3D finite element method.

The effect of blast-induced vibration on the stability of underground water-sealed gas storage caverns

  • Zhou, Yuchun;Wu, Li;Li, Jialong;Yuan, Qing
    • Geosystem Engineering
    • /
    • v.21 no.6
    • /
    • pp.326-334
    • /
    • 2018
  • Underground water-sealed gas storage caverns have become the primary method for strategic storage of LPG. Previous studies of excavation blasting effects on large-scale underground water-sealed gas storage caverns are rare at home and abroad. In this paper, the blasting excavation for underground water-sealed propane storage caverns in Yantai was introduced and field tests of blasting vibration were carried out. Field test data showed that the horizontal radial velocity had a major controlling effect in the blasting vibration and frequencies would not cause the vibration velocity concentration effects. In terms of the influence of blasting vibration on adjacent caverns, the dynamic finite element model in LS-DYNA soft was established, whose reliability was verified by field test data. The numerical results indicated the near-blasting side was primary zone for the structural failure and tensile failure tended to occur in the middle of the curved wall on the near-blasting side. Meanwhile, the safety criterions for adjacent caverns based on stress wave theory and according to statistic relationship between peak effective tensile stress and peak particle velocities were obtained, respectively. Finally, with Safety Regulations for Blasting in China (GB6722-2014) taken into account, a final safety criterion was proposed.

On the Mechanism of Smooth Blasting on the Rock Containing Discontinuties (불연속면이 존재하는 암반에서의 Smooth Blasting의 기구)

  • 박홍민;이상은
    • Explosives and Blasting
    • /
    • v.14 no.4
    • /
    • pp.13-19
    • /
    • 1996
  • Lately, the improtance of smooth blasting is increasing on every construction fields, suchas underground caves, tunnels, and roadconstruction, etc. The main purpose of smooth blasting is to prevent unnecessary cracks from the base rockwhich preserved permanently and is to gain the smooth fracture plane. So, in smooth blashing, explosives with low detonating velocity are generally used. But it is difficult to discuss general theory on the smooth blashing because the mechanical properties of pertienent rocks are difficult regionally. Accordingly basic reserches on the smooth blasting are demended. In this paper, the mechanisms of the smooth blasting on the rocks containing discontinuities were discussd. Firstly, the writer predicted the formation of fracture plane and unevenness using mathematical methodology, the next the model blast tests were conducted in order to simulate the crack propagation modes from the blast holes. Through the research, the following conclusions were obtained l)The blast test results were in reasonally good agreement with the theoretical prediction. 2)The degree of discontinuity has an influence on the fracture morphology.

  • PDF