• 제목/요약/키워드: bidding guideline

검색결과 9건 처리시간 0.019초

건축턴키공사 입찰안내서의 문제점과 개선방안에 관한 연구 - 클레임예방을 중심으로 - (The Study on Problems in Bidding Guideline and Suggestion for Improvement in Architectural Turnkey project in Construction - Focused on Preventing Claim-)

  • 윤준선
    • 한국중재학회지:중재연구
    • /
    • 제15권3호
    • /
    • pp.303-324
    • /
    • 2005
  • Turnkey project in construction which accounts for about $10\%$ of the total annual construction orders in the nation is expected to grow in size as an effort to strengthen international competitiveness and improve quality of construction work. However, problems of turnkey project in construction raise concern for many possible cases of possible claims. Based on the understanding that bidding guidelines which plays a critical role in turnkey project in construction actually contain some unequal clauses and causes for problems which undermine development of turnkey construction and further create possible cases of claims, the paper aims to identify and analyze the unequal clauses and problems contained in the guidelines in order to make suggestions for improvement. Among all the turnkey construction orders that has been placed since 2000 when domestic turnkey project in construction became relatively formulated, 13 constructions costing more than 50 billion won were selected for this study since their construction scale were large enough that the bidding guidelines for them were regarded as containing little difference among one another. In order to enhance construction technology and to prevent claims while trying to achieve the original purpose of Turnkey system, the parties involved in or schedule to take part in Turnkey project including ordering institution, Construction Company and Design Company should make an effort to have more reasonable bidding guidelines drawn up.

  • PDF

IPP 입찰평가와 도매전력요금 결정방향 (Competitive Bidding System and Rate Design for IPP Projects)

  • 이창호;김창수;권영한
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1995년도 하계학술대회 논문집 B
    • /
    • pp.535-539
    • /
    • 1995
  • In recent years, electric industries in many countries confront with a structural change in business and socio-economic environments. Since 1984, PUC and utilities in U.S.A. have adopted or developing competitive bidding systems, and this new procurement programs prevailing and restructuring the power markets. In Korea, government and the Korea Electric Power Corporation (KEPCO) invited the private sector to build and operate two 500 MW coal plants and two 400 MW LNG plants during 2001 - 2004. The plan also specifies basic concepts and conditions for the IPP projects such that new IPPs are selected through competitive bidding system with the purchased power price based on the avoided cost. In this study, the direction, guideline and scoring methods to Korean IPP bidding system are presented. Also, as a benchmark price and rates for purchased power, the avoided cost calculation models are developed, this study may contribute for the development of private power in Korea, and improve overall economic efficiencies of whole electric power sector.

  • PDF

총사업비 관리 프로세스 분석을 통한 입·낙찰 방식별 공사비 조정 시나리오 분석 연구 (A Study on the Analysis of Cost Adjustment Scenarios by Bidding Method through Analysis of the Total Project Cost Management Process)

  • 김경백;이가연;김상범
    • 한국건설관리학회논문집
    • /
    • 제21권2호
    • /
    • pp.30-38
    • /
    • 2020
  • 국내 공공 건설공사 공사비 수준이 시장 상황을 합리적으로 반영하지 못하고 있는 인식이 산업 전반에 널리 펴져 있는 가운데, 총사업비 관리 프로세스 상의 과도한 공사비 조정이 공사비의 적정성 미확보에 대한 핵심 원인 중 하나로 지목되고 있다. 정부는 건설 프로젝트 총사업비 산정 및 관리 프로세스에서 삭감 위주의 정책을 펼치고 있으며, 산업계에서는 예정가격 대비 낙찰가격의 수준은 매우 낮다는 인식이 일반적이다. 본 연구에서는 총사업비 관리 프로세스를 개선하기 위한 목적으로 총사업비 산정 및 관리 프로세스에 대한 분석을 수행한다. 입·낙찰 방식별 총사업비가 단계별 조정되는 과정을 분석하고, 사업구상 단계 대비 낙찰가격의 수준에 대한 정량적 비교분석 결과를 도출한다.

불확실한 부하곡선에 대한 발전기 기동정지계획 (Unit Commitment for an Uncertain Daily Load Profile)

  • 박정도;박상배
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제53권6호
    • /
    • pp.334-339
    • /
    • 2004
  • In this study, a new UC (Unit Commitment) algorithm is proposed to consider the uncertainty of a daily load profile. The proposed algorithm calculates the UC results with the lower load level than the one generated by the conventional load forecast and the more hourly reserve allocation. In case of the worse load forecast, the deviation of the conventional UC solution can be overcome with the proposed method. The proposed method is tested with sample systems, which shows that the new UC algorithm yields completely feasible solution even though the worse load forecast is applied. Also, the effects of the uncertain hourly load demand are statistically analyzed especially by the consideration of the average over generation and the average under generation. Finally, it is shown that independent power producers participating in electricity spot-markets can establish bidding strategies by means of the statistical analysis. Therefore, it is expected that the proposed method can be used as the basic guideline for establishing bidding strategies under the deregulation power pool.

Unit Commitment for an Uncertain Daily Load Profile

  • Park Jeong-Do
    • KIEE International Transactions on Power Engineering
    • /
    • 제5A권1호
    • /
    • pp.16-21
    • /
    • 2005
  • In this study, a new Unit Commitment (UC) algorithm is proposed to consider the uncertainty of a daily load profile. The proposed algorithm calculates the UC results with a lower load level than that generated by the conventional load forecast method and the greater hourly reserve allocation. In case of the worst load forecast, the deviation of the conventional UC solution can be overcome with the proposed method. The proposed method is tested with sample systems, which indicates that the new UC algorithm yields a completely feasible solution even when the worst load forecast is applied. Also, the effects of the uncertain hourly load demand are statistically analyzed, particularly by the consideration of the average over generation and the average under generation. Finally, it is shown that independent power producers participating in electricity spot-markets can establish bidding strategies by means of the statistical analysis. Therefore, it is expected that the proposed method can be used as the basic guideline for establishing bidding strategies under the deregulation power pool.

캐나다 오일, 가스 산업 최신 동향 분석 (The Recent Trend on Oil and Gas Industry in Canada)

  • 서형준;문상호;권순일
    • 한국가스학회지
    • /
    • 제21권2호
    • /
    • pp.10-19
    • /
    • 2017
  • 본 연구에서는 캐나다 오일, 가스 사업의 현황과 특성들을 분석하고 이를 기반으로 오일, 가스 개발 및 생산을 위한 광권, 광구 투자의 개략적인 가이드라인을 제시하였다. 캐나다 서부 퇴적분지는 11개 정도의 주요 지층으로 구분되는데 이중 몬트니, 카디움, 바이킹, 바켄 지층을 중심으로 개발이 진행되고 있다. 하지만 2014년 이후 지속된 저유가로 캐나다 내 시추는 2016년 1분기 기준 총 1,917공이 수행되어, 2014년 1분기의 5,724공, 2015년 1분기의 3,365공에 비하여 각각 67%, 43% 감소하였다. 또한, 저유가의 영향으로 오일, 가스 광구 거래 가격은 매장량 및 생산량 기준 평균 2011년 최고치 대비 34~47% 감소하였고, 개발을 위한 앨버타주 광권의 입찰금액, 입찰면적, 단위 면적당 입찰 가격은 2011년 최고치 대비 평균 81~97% 감소하였다. 이런 이유로 국내 기업의 캐나다 석유사업 진출이 매우 유리한 상황이고, 특히 대규모 투자가 요구되는 광구 매입에 비하여 소규모 투자로 오일, 가스 사업 진출이 가능하고 광구가격 대비 하락폭이 매우 큰 광권 확보가 가능한 최적 시기로 판단된다.

턴키사업과 CM의 역할 (A Study on the Role of Construction Management in the Construction Turn-Key Projects)

  • 김경남;김종훈
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.223-232
    • /
    • 2002
  • 정부에서는 건설사업관리에 대한 법적 근거를 마련한 이후 후속적인 제도보완과 함께 시범사업을 선정하는 등 제도의 정착과 활성화에 노력하고 있다. 그러나 턴키사업에서 CM방식 적용의 경우 설계와 시공이 단일 책임 하에 이루어지는 계약의 특성상 CM 역할의 일부가 제한되고 현행 $\lceil$건설사업관리업무지침$\rfloor$에 턴키사업의 특성이 반영되지 않아 적용상의 어려움이 예상된다. 턴키사업은 그간의 적용을 통해 다양한 문제가 도출되고 있으며, 우리나라의 $\lceil$건설사업관리업무지침$\rfloor$은 미국CMAA의 CM서비스를 비교하여 그 내용이 포괄적이고 CM의 선계이전단계업무의 중요성을 간과하고 있다. 턴키사업에서 CM의 역할을 공사착공 이전까지를 연구범위로 '입찰준비단계', '입찰단계', '실시설계단계', '계약단계'로 구분하여 CM 업무를 규정하고, 제도상의 보완책을 제시하였으며 턴키사업의 CM 역할은 정서적 역할과 전문적 역할로 구분하여 그 내용을 고찰하여 CM적용을 통해 현행 턴키사업의 문제점에 대한 보안방안을 제시하였다.

  • PDF

공공건설공사의 기술제안형 입찰 운영모델 개발 (Development of an Operation Model for Technical Proposal-Based Tender of Public Construction Projects)

  • 유일한;김경래
    • 한국건설관리학회논문집
    • /
    • 제9권2호
    • /
    • pp.136-145
    • /
    • 2008
  • 공공건설사업의 발주방식을 다양화하려는 차원에서 재정경제부는 2007년 10월 $\ulcorner$국가계약법시행령$\lrcorner$ 개정을 통해 기술제안형 입찰인 '기술제안입찰', '설계공모 기술제안입찰'을 새로이 도입하였다. 이러한 입찰은 사업의 특성 및 목적에 맞게 입찰자들에게 기술제안서를 요구한 후 이를 평가하여 낙찰자를 선정하는 방식이다. 본 연구는 국내에 처음 적용되는 기술제안형 입찰제도의 효과적인 운영을 위한 가이드라인을 제공하는 것을 목적으로 하고 있다. 이를 위해 국내외 관련 문헌 및 사례를 분석하여 운영모델의 틀을 구축하였으며, 이후 수차례의 전문가 자문을 통해 표준적인 운영 프로세스, 기술제안서 작성기준, 기술제안서 평가기준, 그리고 낙찰자 결정방법을 개발하였다. 발주자의 중요한 의사결정 요소인 낙찰자 결정방법은 가상 사례를 이용한 시뮬레이션을 수행하여 '기준적합최저가', '가중치', '가격조정입찰', '기술조정점수'의 4가지 낙찰방식이 갖는 정량적 인 특성과 적용기준을 시사점으로 도출하여 제시하였다.

방과후학교에서 계약법 적용에 따른 대안 모색 (A Study On The Exploring Alternatives In After-School Program According To The Application Of Contract Law)

  • 정영모
    • 예술인문사회 융합 멀티미디어 논문지
    • /
    • 제6권7호
    • /
    • pp.219-228
    • /
    • 2016
  • 본 연구는 방과후학교 민간위탁의 정책 변화과정을 조사하고, 향후 대안을 제시하는데 목적이 있다. 본 연구를 위해 정책관련 연구 자료와 관련 법규를 문헌조사 하였다. 조사결과 2004년부터 2008년은 교육부에서 방과후학교 운영계획을 수립하였으나 학교운영위원회의 심의(자문)를 통해 단위학교의 자율로 민간위탁이 진행되었고, 2008년부터 2015년은 교육부와 시도교육청에서 공동으로 제작한 '방과후학교 운영 가이드라인'에 제시된 표준화된 절차를 따르고 있었으며, 2016년 이후에는 방과후학교 민간위탁 시 계약법을 적용하도록 하는 등 정책 변화가 있었다. 2016년 이후의 정책 변화는 방과후학교 민간위탁의 투명성 확보 필요성과 함께 방과후학교 민간위탁 계약규모가 커지면서 계약법을 준수해야 하는 법적 필요성에 기인한다. 하지만 최저가 입찰방식으로 인해 방과후학교 교육의 질이 떨어질 수밖에 없다는 우려의 목소리도 함께 제기되고 있다. 정부에서는 기초금액에서 일정비율 이상을 인건비로 지급하도록 하여 지나친 가격경쟁을 방지하는 대안을 제시하였지만, 본 논문에서는 보다 근본적인 해결 방안으로 방과후학교 교육활동 및 시도의 특수성을 담아내는 시도의 조례를 제정하는 방안을 제시하였다.