• Title/Summary/Keyword: bid evaluation

Search Result 73, Processing Time 0.026 seconds

Life Cycle Cost Evaluation Index Enhancing of Public Facilities (공공시설물의 LCC 평가기준 개선방안)

  • Gu, Bon-Hak;Kim, Tae-Hui;Kim, Ok-Gyu;Park, Tae-Keun;Lee, Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.412-415
    • /
    • 2007
  • Recently advanced nations utilize evaluation system about LCC, and KOREA begin to introduce the system to reduce construction expense. And Introducing "Technical proposal type bid" that is new government construction order mode made needs for valuation of price to evaluate facilities LCC. These days LCC is evaluated by BTL and turnkey project in KOREA, but it is suffering from difficulty in evaluation. because evaluation element and standard are indefinite. In addition LCC evaluation of public construction business except BTL and turnkey is not consisting. Therefore, in this research we present LCC evaluation Index for systematic and objective evaluation.

  • PDF

A Study of the Client′s Importance Perception on the Factors Affecting the Foodservice Management Contract (위탁급식 업체선정에 영향 미치는 요인에 대한 고객사의 중요도 인식 조사)

  • 김현아;양일선;이보숙;박진영
    • Journal of Nutrition and Health
    • /
    • v.37 no.5
    • /
    • pp.406-414
    • /
    • 2004
  • The purposes of this study were 1) to investigate the importance level on factors affecting the foodservice management contract perceived by the clients in the office building, government and public offices and manufacturing company in Seoul and Kyungi 2) to compare the perceived importance levels of the present contract and future contract 3) to compare the perceived importance levels of the competitive bid with those of the private contract. To collect the data on the perceived importance level on the affecting the foodservice management contract, the questionnaires were developed by the delphi technique and modified by the pilot test. The questionnaires consisted of 4 categories and 19 items on the factors affecting the foodservice management contract and the importance level on the factors were measured by 5-likert scale. From March 12 to April 13 in 2003, the self-administrative questionnaires were mailed to 280 clients. The questionnaires were responded from the 50 clients (respondent rate: 25%). On the factors affecting the present contract and the future contract, among the 4 categories (the appropriateness of foodservice operation plan, the evaluation of the foodservice company, sales ability, the conditions of the cost in the contract), the importance level of the appropriateness of foodservice operation plan was higher than those of the other categories. In the comparison of the perceived importance level between the present contract and the future contract, the importance level of 4 items (sanitation and safety management plan, menu management plan, service management plan, food cost per meal) in the future contract were significantly higher than those in the present contract (p<.01, p<.05, p<.05, p<.01). There were the significant differences between the private contract and competitive bid on the factors affecting the present contract in the 3 items, which were $\ulcorner$renewal plan for interior and environment$\lrcorner$, $\ulcorner$strategic alliance with the contractor$\lrcorner$, $\ulcorner$lobby of the foodservice company$\lrcorner$ (p<.05, p<.05, p<.05). And on the factors affecting the future contract, there were significant differences in the 2 items, which were $\ulcorner$renewal plan for interior and environment$\lrcorner$and $\ulcorner$cost per meal$\lrcorner$in comparing the competitive bid and private contract (p<.05, p<.01). The clients perceived the appropriateness of foodservice operation plan was more important than the other categories in the future foodservice management contract. It was proposed that the foodservice management contract company should focus on the foodservice operation to satisfy the customers and clients in order to get more contract in the future.

Evaluation on the impact of Lowest Bid Contracts on Site Operations in times of Severe Economic Downturn (건설경기 침체기의 최저가 낙찰제 건설현장의 운영 실태분석과 개선 방안 도출)

  • Koo, Bon-Sang;Jang, Hyoun-Seung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.146-153
    • /
    • 2009
  • The year 2008 was a hard year for Korea's construction companies. The real estate downturn resulted in halting new construction and stopping existing work, and inflation of global oil prices caused price hikes in rebar and concrete materials. As a solution to reducing the budget, the newly appointed government announced plans to increase low cost bid contracts from 10 billion to 30 billion won. When such economical and political factors negatively impact the construction market, projects based on low cost contracts are the hardest hit. Many problems already inherent in low cost bid contracts become accentuated. Consequently, this provides an opportune time to actually study and analyze the issues in these projects. This paper introduces the findings made from investigating four projects struggling to make ends meet in the year 2008. Results show that flow of cash (i.e., liquidity), or lack thereof, was the root cause which in turn was hampered by failed mechanisms for design changes, material inflation. Attributing cash flow risk to the bottom of the production structure (i.e., small business subcontractors) was also a problem within the industry. Contractors need a better way to prepare against material price fluctuations, and owners need to assist in expediting payment during times of extreme downturn.

Improvement Factors of Promoter Selection Evaluation Criteria for Build-Transfer-Lease Private Participation in Infrastructure Projects (BTL사업의 사업시행자 평가기준 개선 요인 분석)

  • Shin, Hyun-In;Park, Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.310-316
    • /
    • 2006
  • Since 'Act on Private Participation in Infrastructure' were changed in January 2005, BTL(Build-Transfer-Lease) projects of Private Participation in Infrastructure was introduced in the domestic construction market for the purpose of providing public facilities with the public. Selecting the most qualified Promoter should be considered discreetly in BTL projects because BTL projects is for projects with approximately thirty year project life cycle, plan, construction, operating, maintenance and obviously the success of the project totally depends on the capability and role of Promoter. However, score for cost is likely to influence selecting Promoter to take the project. Accordingly, low bid contract with too much competition could decrease the quality of the construction plan and operating plan. Thus, this study did preliminary research and documents on problems of evaluation criteria for selecting Promoter in BTL projects, and proposed improvement factors by doing questionnaire over specialists of each field.

  • PDF

Calculation for Components of Locational Marginal Price considering Demand-Side Bidding in a Competitive Electricity Market (경쟁시장내의 수요자원입찰을 고려한 모선별 한계가격의 구성요소산정 기법)

  • Kim, Hyun-Houng;Kim, Jin-Ho;Park, Jong-Bae;Shin, Joong-Rin
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.7
    • /
    • pp.1157-1166
    • /
    • 2008
  • This paper presents a new approach for the evaluation of location marginal prices (LMPs) considering demand-side bidding (DSB) in a competitive electricity market. The stabilization of the electric power supply and demand balance is one of the major important activities in electric power industry. In this paper, we present an analytical method for calculation of LMPs considering DSB, which has opportunity to compete with generating units, as England & Wales Pool's DSB scheme[1]. Also, we propose a new approach that LMP considering DSB is divided into three components. The proposed approach can be used for the evaluation of demand-side bidding into the electricity market and the assessment of the influence of DSB on total production costs and LMPs as well as three components.

Extradural spinal lipoma in a dog

  • Lim, Ji-Hey;Kim, Wan Hee;Kim, Dae-Yong;Cho, Deo-Youn;Kweon, Oh-kyeong
    • Korean Journal of Veterinary Research
    • /
    • v.46 no.1
    • /
    • pp.75-76
    • /
    • 2006
  • A 7-year-old, female pointer dog was referred to the SNU Veterinary Medicine Teaching Hospital for the evaluation of lameness in the pelvic limb of 10 days' duration. After the treatment for 2 weeks (carprofen 2.2 mg/kg, bid), the progressive, symmetric, ambulatory caudal paraparesis was profound. In the spinal myelography, left lateral extradural compression of the spinal cord over the ninth and tenth thoracic vertebral bodies was found. A left hemilaminectomy of the ninth and tenth thoracic vertebrae was done. A 1.5-cm-long, white extradural mass occupied the left side of the spinal canal. The tumor was identified histologically as lipoma. The 6 weeks after surgery the dog's complaints were much improved. Continuous evaluation is needed.

Development of VE/LCC Evaluation Model for Railway Route Selection (최적 철도 노선 선정을 위한 VE/LCC 평가 모델 개발)

  • 이동욱;이태식
    • Journal of the Korean Society for Railway
    • /
    • v.7 no.3
    • /
    • pp.215-222
    • /
    • 2004
  • Optimal route selection of railway should take consideration of the function of the railway, topography, practicability of construction and management as well as the cost. This study performed the surveys for experts and surrounding industries and the review for the bid guidelines in order to develop the quality model with the AHP method and establish the weight for each factor. Six quality models were developed for such as the efficiency of railway operation, structure design and practicability, economic feasibility, correspondence with other plans, civil appeal and environmental sustainability, and correspondence with system. The detailed evaluation elements were also derived by each factors.

A Study on the adequacy of Hospital Architecture Deign-Build and Improvement of Assessment Criteria - Focus on the case of Architectural Planning Design Change - (병원건축 일괄입찰방식의 적합성과 평가기준 개선방안에 관한 연구 - 건축계획의 설계변경사례를 중심으로 -)

  • Hong, Seung-Min;Yang, Nae-Won
    • Korean Institute of Interior Design Journal
    • /
    • v.21 no.2
    • /
    • pp.215-222
    • /
    • 2012
  • Design-build is expanding gradually in large construction projects over 10billion won, and continue to work in health care facilities is increasing in this way. This constructional method in health care facilities, despite the many advantages, many problems caused by design changes are being raised. Raises the question of design changes on the side of construction contract, such as approval systems have been studied in the field of construction. The purpose of this study design in aspects of architectural planning on changing the grasp of the issues outlined in the ITB and bid evaluation criteria through consideration of the basic plan for improvement guidelines and evaluation criteria is presented. In conclusion, Design build, according to the presence of existing users are more likely to lead to design changes. Thus, hospital architecture, depending on how it is considered that constructional methods. And evaluation items of ITB(Invitation To Bidder) for a large part of the change in the variables evaluated in the hospital building is not suitable for the design build. Instead, the overall shape of the building and department, unit type and size, vertical and horizontal parts of the circulation system in the shape of the building that does not change in structure and etc should be considered for evaluation.

  • PDF

A Proposal Research of Assessment Standards for Ordering BIM-based Projects in Railway Infrastructure - Case Study on Application of Existing Projects - (철도인프라 BIM기반 공사 발주를 위한 평가기준 제안 연구 - 기존 발주사업 적용 사례를 통해 -)

  • Son, Seo-Yeon;Lee, Geun-Il;Jung, Ji-Hyun;Moon, Woo-Hyoung
    • Journal of KIBIM
    • /
    • v.11 no.4
    • /
    • pp.10-19
    • /
    • 2021
  • In the evaluation for ordering BIM-based projects (Design Build) of Korean National Railway, criteria of BIM-based smart construction technology are assessed. Unlike the existing assessment criteria, performance resources and detailed assessment guidelines have been added by this research. The purpose of this study is to propose qualification assessment standards according to specific guidelines when evaluating on the phase of bidding for BIM-based projects. In the study, an improved evaluation standard (draft) was arranged based on two consultation meetings and surveys of related companies, applied to existing projects with the companies that won the bid, and validated. As more specific and added criteria compared to the existing standards, it could reduce the difficulty of evaluation for BIM capability and lay the foundation for railway BIM-based project management.

Test and analysis of settlement pattern of trackbed during pipe roof excavation (각관 추진 굴착시 궤도노반의 침하경향 실험분석)

  • Jung, Kwan-Dong;Eum, Ki-Young;Choi, Chan-Yong;Jo, Su-Ik;Hwang, In-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.895-902
    • /
    • 2010
  • The method in a bid to make better use of limited urban space amidst increasingly expanding urban area have been attempted in various ways. Efficient using underground space is one of the examples. The pipe roof and excavation for underground crossing implemented in this study was the part of evaluation of such attempt. However, the pipe roof method for underground crossing may cause the ground surface to be uplifted or settled down, having effect on structure above the ground. Thus in this study, a laboratory model test designed to evaluate the effect on surface during implementing pipe roof and excavation was carried out. The ground displacement during pipe roof advancing and excavation is usually occurred in a radial shape but as the study focused on trackbed, the evaluation included ground settlement only. Thus, appropriately-scaled model was selected considering domestic geological characteristics and operation characteristics of traditional and high-speed rail trains and the qualitative evaluation of displacement was carried out with a certain ground loss depending on excavation after categorizing trackbed settlement pattern depending on depth of top soil.

  • PDF