• Title/Summary/Keyword: bid evaluation

Search Result 73, Processing Time 0.027 seconds

A Priority Analysis on Influential Factors for Software Bid Evaluation in Public Sectors based on Analytic Hierarchy Process(AHP) (AHP 기법을 활용한 소프트웨어 제안평가요인의 상대적 중요도에 관한 연구 : 발주자와 수주자 비교를 중심으로)

  • Kim, Hong Jin;Jo, Dong Hyuk;Ahn, Tae Ho
    • Journal of Information Technology Services
    • /
    • v.16 no.1
    • /
    • pp.41-53
    • /
    • 2017
  • Recently, due to the economic recession and increase of ITO (IT Outsourcing), bidding in software industry has been recognized as more competitive and the importance of software bid evaluation for corporate selection is being increased. This study aims to analyze and prioritize influential factors in the software bid evaluation criteria which is adopted as the main evaluation model of national software businesses by Ministry of Science. The priority was developed by AHP (Analytic Hierarchy Process) through pair-wise comparison. For the analysis, this study developed analysis model for AHP and conducted survey of experts who have work experience for more than 10 years in the IT industry. As the result of analysis, weighted factors in the evaluation criteria were deduced and differences of priority factors between purchaser and bidder were investigated. The analysis showed differences of view point in the bidding process. With these results, this study suggests how to write a proposal strategically and effectively in perspective of the purchaser. It is expected that priority factors will be adopted in strategic proposals in both bidder and purchaser. For purchaser, the priority will be adopted to select reliable bidder. So, we expect that the priority factors will be used to get more values for both bidder and purchaser in their business atmosphere.

Whole Life Performance Bid Evaluation in the Korean Public Sector

  • Park, Kenneth Sungho;Lim, Hyoung-Chul
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.6
    • /
    • pp.682-700
    • /
    • 2012
  • Over the last several years, Korea has increasingly adopted design-build for public construction projects. There is a much greater awareness of the need to change to a system based on 'Value for Money', which is high on the government's agenda. A whole life performance bid evaluation model is proposed to aid decision makers in the selection of a design-builder. This is based on the integration of a framework using an analytic hierarchy process, as the bid awarding system is being changed from one based on the lowest price to one based on best value over the life-cycle. Key criteria such as whole life cost, service life planning and design quality are important through the key stages of the evaluation process. The model uses a systematic and holistic approach, which enables the public sector client to make better decisions in design-builder selection, which will deliver whole life benefits based on long-term cost-effectiveness.

Assignment-Change Optimization for the Problem of Bid Evaluation (입찰 평가 문제의 배정-변경 최적화)

  • Lee, Sang-Un
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.21 no.4
    • /
    • pp.171-176
    • /
    • 2021
  • This paper deals with bid evaluation problem that chooses the vendors and quantity with minimum purchasing cost for bid information of setup cost and unit price. For this problem, the branch-and-bound(BB) and branch-and-cut(BC) methods are well-known. But these methods can be fail to obtain the optimal solution. This paper gets the initial feasible solution with procuring quantity assignment principle in accordance with the unit price or setup cost rank-first. Then procuring quantity moving optimization(vendor change) is execute take account of unit price or setup cost rank. As a result of experimentation, the propose algorithm is significantly lower compared to BB and BC.

Deduction on The Problems and Improve The Way of The Successful Bidder Determination Method for Turnkey·Alternative Bid Construction (턴키·대안입찰공사 낙찰자 결정방식의 문제점 및 개선 방안 도출)

  • Park, Hong-Tae;Lee, Yang-kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1881-1891
    • /
    • 2014
  • Full system of turnkey deliberation committee in 2010 was abolished and permanent Deliberation committee was introduced. So far, ordering organization selected the best method suitable for the design and comprehensive evaluation method in the turnkey bid construction. Comprehensive evaluation method have bid price design score coordination, weighted basis, the best design approach fixed amount, five successful bidder decision method in addition. Design deliberation branch committee in the successful bidder decision way configured and operated branch members of special design consultation committee, But main agent changed from committee deliberation pull system to permanent committee deliberation, as well as and The lobby burden was not improved. This similar to the past at the portion of the design deliberation and the way of the design deliberation in the turnkey bid construction. Therefore it is necessary to improve the design deliberation system. In other words, design score and technology competition should be adapted to determine a successful bid. This study suggested the operating system of the design deliberation, the decision method problems of the successful bidder and ways to improve the design deliberation.

A Study on the Evaluation System for Bidders to According to the Best Value Bid System by Technology Proposal Method (기술제안방식의 최고가치낙찰제도 입찰자 평가체계에 관한 연구)

  • Yeo, Sang-Ku;Lee, Gun;Lee, Hyun-Chul;Go, Seong-Seok
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2009.04a
    • /
    • pp.211-216
    • /
    • 2009
  • Bidding systems in the domestic public construction work have been amended many times since the lowest-bidding system was implemented in 1951. However, this hasn't had much success. Competition in technical development among companies has declined as the contracts for buildings are given to company which submits the lowest price without considering traits of projects. In addition, as the construction market turns to the limitless competition system due to FTA(Free Trade Agreement), advanced techniques are needed to promote the national competitive power. Considering the needs of the times, Korean government announced that "Best Value Contract (Design-Bid-Build)" and "Bridging Contracts (Design-Build)" are included to 4 existing bidding systems in October 2007. Thus this study aims to suggest devised the evaluation criteria including major items for evaluating bidders, in order to establish and revitalize the best-value bid system successfully.

  • PDF

The study on improving the regulation for industrial accident rate level assessment of construction companies (건설업 산업재해발생률 산정·평가기준 개선방안 연구)

  • Park, Yong-Kyu
    • Journal of the Korea Safety Management & Science
    • /
    • v.18 no.3
    • /
    • pp.17-24
    • /
    • 2016
  • The regulation for industrial accident rate level assessment of construction companies was introduced to the construction industry in the Republic of Korea since 1993 and has brought positive outcome on industrial accidents reduction at construction work sites. There were considerable decrease of industrial accident ratio and enforcing of contrators' safety organizations from the beginning of the regulation for industrial accident rate level assessment. In spite of these positive outcomes, there were some negative effects such as contractors' shrinking accident reports to keep good accident ratios since these figures had a great impact on pre-qualification stage of bidding when general contractors were competing for new construction projects. In addition, Comprehensive evaluation bid system, which replaces the lowest price bid system is applied to government-ordered construction projects since 2016. Comprehensive evaluation bid system includes construction company's accident rate as one of the evaluation items and carries out with the industrial accident rate level assessment of construction companies at the same time. The regulations of two systems have been called for improvement to unify these different procedures and standards which have led business stakeholders to confusion for several years. This study aims to devote on lessening shrinking accident reports and to reduce the waste of business stakeholders through changing the regulation for industrial accident rate level assessment.

EVALUATION OF COST-TIME RELATIONSHIPS FOR CONTRACTORS PARTICIPATING IN COST-PLUS-TIME BIDDING

  • Saeed Abdollahi Sean Pour;Hyung Seok David Jeong
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.479-487
    • /
    • 2013
  • State Highway Agencies (SHAs) have started utilizing cost-plus-time bidding (A+B bidding) since Federal Highway Agency (FHWA) declared it operational on May 4, 1995. Although this technique has successfully accelerated many projects by incorporating construction time in the bidding competition, a framework to illustrate the interactions of incentive/disincentive (I/D) rates on the competitiveness of contractors participating in the bid competition is yet to be developed. In a previous research, authors indicated that for each bid competition there is an efficient cap for I/D rates which are dictated by the capabilities of contractors in project acceleration. However, the results of previous study were based on the assumption that there is a statistically significant relationship between cost and time. In this study, the entire cost-plus-time projects implemented by the Oklahoma Department of Transportation (ODOT) were investigated. Then the significance of relationship between cost and time were analyzed for each contractor utilizing Analysis of Variance (ANOVA) technique, and the price-time function of each contractor was determined by regression analysis. The results of the analysis indicate that there is a significant relationship between cost and time for the majority of contractors. However, a quadratic relationship is not always significant and for some contractors a linear price-time relationship is significant. The results of this project can be used not only by ODOT to optimize the incentive/disincentive rates but also by contractors to determine the most competitive strategies of other bid participants.

  • PDF

Structural Analysis of the OnBid Car Auction (온비드 공매가격 결정요인에 관한 연구: 승용차 공매를 중심으로)

  • Song, Unjy
    • KDI Journal of Economic Policy
    • /
    • v.36 no.3
    • /
    • pp.61-93
    • /
    • 2014
  • This paper analyzes Onbid car auction data by employing various methods, including structural estimation, to identify main factors which decides auction prices and figure out what effects those factors are making on the auction price. I then discuss on how to maximize sellers' revenue in OnBid car auctions. The government and public institutes sell their assets through the OnBid auction, hence the optimal design of the OnBid auction is important. The paper's main findings are as follows: (ⅰ) The independent private value model explains OnBid car auction data better than the correlated private value model or the interdependent value model; (ⅱ) Both the number of bidders and the ratios of the auction price to the evaluation value were lower in the auctions posted by the Kamco than auctions by institutes other than the Kamco; (ⅲ) Some auctions require that at least two bidders should submit a bid no less than the reserve price for sale. In those auctions, both the number of bidders and each bidder's valuation on the auctioned object were lower than in auctions without that requirement; (ⅳ) The sum of sellers' revenue would be decreased in the simulation with the reserve price higher by 5%, 10%, and 20% across auctions by institutes other than Kamco.

  • PDF

IMPLEMENTATION OF GOVERNMENT E-PROCUREMENT: A COMPARATIVE STUDY OF THAILAND AND INDONESIAN PRACTICES

  • Budi Hasiholan;Shin-ei TAKANO
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.827-834
    • /
    • 2009
  • In respond to the demand of an open, fair, transparent, and efficient environment for procurement, many governments have incorporated the use of internet in their procurement systems with online procurement (e-procurement). Given the different policies and laws which have to be complied with, the practice of government e-procurement system varies from one country to another. Thus, experiences in running e-procurement will vary as well. The achievements and obstacles of one country's experience will be a constructive reference for other countries in establishing e-procurement system. In this regard, government e-procurement system practices in two Southeast Asia countries i.e., Thailand and Indonesia particularly in public works are consecutively presented and finally compared in this paper. The government of Thailand has applied Online Auctions (e-Auctions) as the national procurement practice since 2005 and performed the e-Auctions in two types: Reverse Auction and Sealed Bid Auction. Contrary to the common practice of e-procurement, the Thai government, with some rationales, runs the bid documents obtaining manually as well as qualification and technical documents submission and holding the e-Auctions at bidding office. Whereas Indonesian government runs Online Sealed Bid Bidding (e-Procurement) and most of the bidding stages are performed electronically except bid evaluation for both technical and financial. The advantages and drawbacks of these two e-procurement practices are discussed as well as improvements that have to be made for successful of e-procurement.

  • PDF

THREE-STAGED RISK EVALUATION MODEL FOR BIDDING ON INTERNATIONAL CONSTRUCTION PROJECTS

  • Wooyong Jung;Seung Heon Han
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.534-541
    • /
    • 2011
  • Risk evaluation approaches for bidding on international construction projects are typically partitioned into three stages: country selection, project classification, and bid-cost evaluation. However, previous studies are frequently under attack in that they have several crucial limitations: 1) a dearth of studies about country selection risk tailored for the overseas construction market at a corporate level; 2) no consideration of uncertainties for input variable per se; 3) less probabilistic approaches in estimating a range of cost variance; and 4) less inclusion of covariance impacts. This study thus suggests a three-staged risk evaluation model to resolve these inherent problems. In the first stage, a country portfolio model that maximizes the expected construction market growth rate and profit rate while decreasing market uncertainty is formulated using multi-objective genetic analysis. Following this, probabilistic approaches for screening bad projects are suggested through applying various data mining methods such as discriminant logistic regression, neural network, C5.0, and support vector machine. For the last stage, the cost overrun prediction model is simulated for determining a reasonable bid cost, while considering non-parametric distribution, effects of systematic risks, and the firm's specific capability accrued in a given country. Through the three consecutive models, this study verifies that international construction risk can be allocated, reduced, and projected to some degree, thereby contributing to sustaining stable profits and revenues in both the short-term and the long-term perspective.

  • PDF