• Title/Summary/Keyword: asphalt pavements

Search Result 242, Processing Time 0.026 seconds

Study on fracture behavior of polypropylene fiber reinforced concrete with bending beam test and digital speckle method

  • Cao, Peng;Feng, Decheng;Zhou, Changjun;Zuo, Wenxin
    • Computers and Concrete
    • /
    • v.14 no.5
    • /
    • pp.527-546
    • /
    • 2014
  • Portland cement concrete, which has higher strength and stiffness than asphalt concrete, has been widely applied on pavements. However, the brittle fracture characteristic of cement concrete restricts its application in highway pavement construction. Since the polypropylene fiber can improve the fracture toughness of cement concrete, Polypropylene Fiber-Reinforced Concrete (PFRC) is attracting more and more attention in civil engineering. In order to study the effect of polypropylene fiber on the generation and evolution process of the local deformation band in concrete, a series of three-point bending tests were performed using the new technology of the digital speckle correlation method for FRC notched beams with different volumetric contents of polypropylene fiber. The modified Double-K model was utilized for the first time to calculate the stress intensity factors of instability and crack initiation of fiber-reinforced concrete beams. The results indicate that the polypropylene fiber can enhance the fracture toughness. Based on the modified Double-K fracture theory, the maximum fracture energy of concrete with 3.2% fiber (in volume) is 47 times higher than the plain concrete. No effort of fiber content on the strength of the concrete was found. Meanwhile to balance the strength and resistant fracture toughness, concrete with 1.6% fiber is recommended to be applied in pavement construction.

The Thermal conductivity analysis on the pavement applying geothermal snow melting system (지열 융설시스템을 적용한 포장체에서의 열전도 분석)

  • Lee, Seok-Jin;Kim, Bong-Chan;Seo, Un-Jong;Lee, Seung-Ha;Lee, Joo-Ho
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.221-228
    • /
    • 2010
  • A sliding accident on the road have a high percentage by road freezing, especially, it is often appeared at bridges and Tunnel of freezing areas. Thus, the stability of road operations is enhanced by preventing a partial freezing phenomenon. According to the geothermal snow melting system analysis, a pattern of thermal conductivity is found out about pavement materials of concrete and asphalt when it is buried. The thermal conductivity study is essential that be applied the geothermal snow melting system according to heating exchanger pipe laying of lower pavements. The model tests are conducted on low temperature in freezer using the manufactured test model which is equal to pavement materials. And Many variables are discovered from numerical analyzes of the same conditions with model test.

  • PDF

A Study on the Impact of an Improved Road Pavement Technology on the Thermal Structure of Atmospheric Boundary Layer (도로 포장 기술 개선에 따른 대기 경계층의 열 변화에 관한 연구)

  • Lee, Soon-Hwan;Kim, In-Soo;Kim, Hae-Dong
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.24 no.5
    • /
    • pp.551-561
    • /
    • 2008
  • In order to clarify the impact of anti-heat insulation pavement on the thermal structure of atmospheric boundary layer, field experiments and numerical simulations were carried out. Field experiment with various pavements were also conducted for 24 hours from 09LST 19 June 2007. And numerical experiment mainly focused on the impact of albedo variation, which is strongly associated with thermal characteristics of insulated pavement materials, on the temporal variation of planterly boundary layer. Numerical model used in this study is one dimension model with Planterly Boundary Layer developed by Oregon State University (OSUPBL). Because anti-heat insulation pavement material shows higher albedo value, not only maximum surface temperature but also maximum surface air temperature on anti-heat insulation pavement is lower than that on asphalt. The maximum value of surface temperature only reach on $49.5^{\circ}C$. As results of numerical simulations, surface sensible heat flux and the height of mixing layer are also influenced by the values of albedo. Therefore the characteristics of urban surface material and its impact on atmosphere should be clarified before the urban planning including improvement of urban heat environment and air quality.

Evaluation on the Mechanical Properties of Multi-Functional Asphalt Pavements for Surface Course (다기능 표층용 아스팔트 혼합물의 역학적 특성 평가)

  • Lee, Kwan-Ho;Ham, Sang-Min;Kim, Seong-Kyum;Lee, Byung-Sik
    • Proceedings of the KAIS Fall Conference
    • /
    • 2011.05a
    • /
    • pp.292-295
    • /
    • 2011
  • 본 논문에서는 배수성(저소음)포장을 포함하는 2-Layer 아스팔트 포장의 상부층과 하부층의 역학적인 특성을 평가하는데 목적이 있다. 연구 방법으로는 슈퍼페이브 배합설계로 2-Layer 아스팔트 포장의 상 하부층 시편을 제작하였으며, 시편 상부층의 최대공칭치수는 4.75mm이고 하부층의 최대공칭치수는 13mm이다. 이 시편에 대한 기본 물성 시험 실시 후 마샬 안정도 시험에 대한 안정도와 흐름값을 평가하였다. 그리고 상부층과 하부층의 자유단 공진주 시험을 통해 탄성계수(E)를 측정하였고, 비파괴 시험법인 슈미트해머(Schmidt hammer)를 이용해 반발경도를 측정한 후 강도를 추정하였다. 또한 일축압축시험으로 측정된 압축강도로 탄성계수($E_{50}$)를 계산하였다. 마지막으로 각각의 역학적 시험을 통해 얻어진 결과값으로 강도(qu)와 탄성계수 ($E_{50}$)의 상관관계와 추정식으로 구한 강도와 일축압축강도 시험으로 얻어진 강도와의 상관관계를 분석하였고, 자유단 공진주 시험의 탄성계수(E)값과 일축압축시험의 결과로 얻어진 탄성계수($E_{50}$)의 상관관계를 분석하였다.

  • PDF

Directions to Introduce Warranty Contraction for Pavements in Korea (도로포장 성능보증(Warranty)계약제도 도입방향)

  • Kim, Tae-Song;Koo, Jai-Dongl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.987-990
    • /
    • 2007
  • Warranty contracting is contracting methods that European Countries have applied to asphalt pavement projects from long ago, and in America as the expected effects of the warranty contracting are being verified to introduce it, the number of projects with warranty is being increased rapidly. In Japan, the warranty contracting suitable for Japanese style was established and is being applied. This study investigated and analyzed the present state of the warranty contracting being applied to European countries, America and Japan, and suggested advantages and disadvantages in introducing the warranty contracting into Korea and directions to introduce it. The principal result of this study is that performance bond contract system, performance surety bond system and performance bidding system should be established to introduce the warranty contracting into Korea.

  • PDF

A Study on Life Cycle Cost Analysis of Latex Modified Concrete Pavement for Bridges (LMC 교면 포장 공법의 생애주기비용분석에 관한 연구)

  • Cho, Hyo-Nam;Choi, Hyun-Ho;Jung, Pyoung-Ki;Lim, Jong-Kwon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.5 no.4
    • /
    • pp.185-195
    • /
    • 2001
  • Latex Modified Concrete(LMC) has been widely used for the pavement of highway bridges over the past 35years around the world since it is more resistant to the intrusion of chloride ions, has higher tensile, compressive, and flexural strength, and has greater freeze-thaw resistance. However, in Korea, it has not been introduced to fields due to higher initial construction cost for its overlay compared with that of conventional pavement materials. Due to durable characteristics, it should be noted that the LMC may be more cost-effective than conventional pavements such as asphalt pavement, when life-cycle cost(LCC) concept is considered. The objective of this study is intended to suggest a practical LCC analysis model for pavement projects and to demonstrate relative cost-effectiveness of the LMC overlays in comparison with conventional pavement techniques. It may be stated that the procedure proposed in this study may be utilized for making optimal decision on cost-effective pavement design.

  • PDF

Comparison Analysis between PWL and Probability Theory for Quality Measurement of Asphalt Pavement (아스팔트 포장의 품질측정을 위한 확률이론과 PWL방법의 비교 분석)

  • Choi, Jang-Kyu;Rhee, Suk-Keun;Kim, Seong-Min;Hwang, Sang-Min
    • International Journal of Highway Engineering
    • /
    • v.11 no.2
    • /
    • pp.27-35
    • /
    • 2009
  • This study was conducted to suggest resonable quality measurement methods of asphalt pavements to be used in the Pay adjustment. The Pay adjustment is a method to adjust the construction cost according to the pavement quality based on the statistic theories. Many U.S states use Pay adjustment and the PWL(Percent with in Limit) is calculated using their quality index tables. In this study, the application of PWL in Korea was evaluated by comparing the PWL South Carolina with the probability theories. The probability values and the PWL obtained using the data collected from the test roads were used to determine the pay factors suggested by AASHTO and the pay factors between them were closed to each other. In addition, the PWL was very similar to the probability obtained using the predicted average of the population when calculating the Z-values. The pay factors were obtained using artificial data whose average satisfied the codes and whose standard deviation was large. The pay factors were less than 100% in the quality measurements can be performed using the PWL methods, and with the development of the korea quality index table, the PWL methods can be applied in korea.

  • PDF

A Study on the Application of Very Rapid Hardening Acrylic Polymer Modified Concrete for Bonded Concrete Overlay Method (접착식 콘크리트 덧씌우기 공법을 위한 초속경 아크릴계 폴리머 개질 콘크리트의 적용성 연구)

  • Lee, Seung-Woo;Kim, Young-Kyu;Lee, Poong-Hee
    • International Journal of Highway Engineering
    • /
    • v.13 no.1
    • /
    • pp.139-148
    • /
    • 2011
  • Asphalt concrete overlay method is used by general maintenance and rehabilitation of construction for aged concrete pavement in Korea. However, in case of the AC overlay method to extend service life of the existing concrete pavements, various distresses of reflection crack, pothole and rutting are the typical problems of the asphalt overlay on existing concrete pavement since it has different physical characteristics between asphalt overlay and existing concrete pavement. To achieve this, application of concrete overlay method is required instead of AC overlay method. Concrete overlay method has advantages that can reduce maintenance cycle and costs since it has excellent bearing value for heavy vehicles and no rutting. However, technical problems of detour road construction, traffic control and other disadvantages happened by long curing time. Thus, in this study and experimental research were launched to evaluate the workability, durability and resistance against environmental loading of Very Rapid Hardening Acrylic Polymer Modified Concrete(VRH-APMC) for application of bonded concrete overlay method. Test results showed that the compressive and bond strength were exceed 21MPa and 1.4MPa of target strength after four hours for rapid traffic opening properties. And tests of resistance against environmental loading results showed that VRH-APMC secured excellent durability. Thus, it was known that VRH-APMC was suitable material for large scale bonded concrete overlay method, and it was possible to use maintenance and rehabilitation method which needs enough workability and rapid traffic opening.

A Consideration on the Electromagnetic Properties of Road Pavement Using Ground Penetrating Radar (GPR) (지표투과레이더(GPR)에 의한 도로포장의 전자기적 특성값 고찰)

  • Rhee, Jiyoung;Shim, Jaewon;Lee, Sangrae;Lee, Kang-Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.3
    • /
    • pp.285-294
    • /
    • 2020
  • This study investigated the use of Ground Penetrating Radar (GPR) over a two-decade period on public roads, focusing on the electromagnetic characteristics of the pavement dielectrics and attenuation. From the results, a typical range of characteristic value, influencing factors, and a correction method were suggested. The typical dielectrics of asphalt pavements were 4-7, as measured by an air-coupled 1 GHz GPR antenna. The dielectrics of concrete pavements were very large in the early age, but were drastically reduced with ageing. Ten years on, collection was in the range of 6-12. The dielectrics were proportional to the relative humidity (R.H.) of the atmosphere. The effects were reduced to one eighth with an overlay. Attenuation generally increased with thickness of the road layer, and also increased where there was damage. The GPR results could also vary depending on the weather conditions as well as on the characteristics of the GPR equipment, even at the same frequency. Therefore, GPR surveys should be performed on road surfaces without debris on a single, fine day. The reliability of the GPR analysis could be improved by cores and equipment calibration with other non-destructive test surveys.

A Study on the Estimation of Proper Construction Cost for Road Pavement Maintenance Work (아스팔트포장 유지보수 적정공사비 산정방안 연구)

  • Oh, JaeHun;Song, TaeSeok;An, BangYul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.16-26
    • /
    • 2020
  • Road Pavement Maintenance Work is generated in a variety of different field conditions, and it is difficult to calculate the construction cost because there are no detailed criteria when preparing the estimated construction cost. Unlike new pavements, Road Pavement Maintenance has to be constructed with operating vehicles, and there are many differences in productivity depending on urban areas, limited work hours, night-time, construction area, etc. To compensate for this, the standard for calculation of construction cost provides additional charges for the number of lanes, residential areas, working hours, and night work, but it applied differently depending on construction officials. In this study, construction cost estimation standards that can properly reflect the conditions of the site was investigated for major types of Road Pavement Maintenance work. The site was investigated and analyzed mainly for many construction sites with 'overlay of asphalt after cutting', 'restore surface', 'repair of pavement', and 'recovery of roadway'. The criteria for the application of construction volume separately according to working hours, public places, and land area including extra charges for basic downtown and residential area. The hours of operation were divided into three types(7 hours, 5 hours, 3 hours) excluding movement and preparation time, and each type provided a coefficient for dividing the area of the construction site into five types. The construction cost calculation method based on the construction purpose is site conditions is proposed accordingly, and it is deemed that a plan for the designer to calculate the construction cost has been prepared in consideration of the site conditions.