• Title/Summary/Keyword: architectural drawings

Search Result 212, Processing Time 0.024 seconds

Development of the Construction Procedures Prototype and Analysis of Construction Period for the HPC Method (HPC공법의 공사절차 프로토타입 개발 및 공사기간 분석)

  • Kim, Jae-Yeob
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.6
    • /
    • pp.577-585
    • /
    • 2017
  • HPC method is developing to improve the constructability and structural performance of the existing PC method. The objective of this study is to develop construction procedures and to analysis of construction period for HPC method. In order to develop construction procedures, the building construction data of the existing half-slab method was analyzed. Analyzing design drawings and specifications of nine construction cases, a prototype of half-slab method, was drawn. Applying the core technology of HPC method to the drawn prototype of half-slab method, a prototype of HPC method, was developed. The differences of both methods were 'installing PC column' and 'placing topping concrete'. To analysis the differences of both methods, seven construction cases were analyzed. According to the analysis for HPC method, cases1 and 2 had columns divided for construction shortened about 16% of a construction period. The schedule of column assembly work was analyzed to be shortened much. That is judged to be because the use of a hollow PC column leads to a decrease in the number of columns. In particular, if HPC method is applied to a building construction site using large columns, it is analyzed to shorten a construction period more than the existing Half-slab method.

A Study of the Establishment of BIM Design Environment based on Virtual Desktop Infrastructure(VDI) of Cloud Computing Technology (클라우드 컴퓨팅 기술을 활용한 데스크탑 가상화 기반의 BIM 설계 환경 구축에 관한 연구)

  • Shin, Joonghwan;Lee, Kyuhyup;Kwon, Soonwook;Choi, Gyuseong;Ko, Hyunglyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.118-128
    • /
    • 2015
  • Recently BIM technology has been expanded for using in construction project. Due to the high-cost of BIM infrastructure development, lack of regulations, lack of process and so forth, usage of BIM has been delayed than initial expectations. In design phase, especially, collaboration based on BIM system has been a key factor for successful next generation building project. Through the analysis of current research trends about IT technologies, virtualization and BIM service, data exchange such as drawings, 3D model, object data, properties using cloud computing and virtual server system is defined as a most successful solution. The purpose of this study is to enable the cloud computing BIM server to provide several main functions such as editing models, 3D model viewing and checking, mark-up and snapshot in high-performance quality by proper design of VDI system. Concurrent client connection performance is a main technical index of VDI. Through testing of test-bed server client, developed VDI system's multi-connect control is evaluated. Performance-test result of BIM server VDI effect to development direction of cloud computing BIM service for commercialization.

Development of Method for Manufacturing Freeform EPS Forms Using Sloped-LOM Type 3D Printer (Sloped-LOM 방식 3D 프린터를 이용한 비정형 EPS 거푸집 제작 공법 개발)

  • Ahn, Heejae;Lee, Dongyoun;Ji, Woojong;Lee, Woojae;Cho, Hunhee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.2
    • /
    • pp.171-181
    • /
    • 2020
  • Recently, free-formed construction technology is becoming a new measure of representing technological superiority and sociocultural ingenuity. However, the CNC processing technology utilizing the existing wood and iron form has limitations in terms of the manufacturing time and material cost. Therefore, in this study, the method and process of manufacturing free-formed EPS form using S-LOM-based 3D printing technology were suggested. Furthermore, through the mock-up test, a comparative analysis of the manufacturing time and precision with CNC milling technology was conducted. The results show that S-LOM-based 3D printing technology has reduced manufacturing time about 57.4% compared to CNC milling technology during the free-formed EPS form manufacturing process. In addition, compared to the design drawings, the maximum error value was 20.5mm, proving the applicability of S-LOM-based 3D printing technology. The results of this study are expected to contribute to the improvement of S-LOM method and the activation of S-LOM method by verifying the applicability of S-LOM-based 3D printing technology.

Study of the Dormitory Architecture of Governmental Secondary Schools in the Japanese Colonial Era (일제 강점기 관립 중등학교 기숙사 건축에 관한 연구)

  • Lee, Jeong-Woo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.8
    • /
    • pp.5355-5362
    • /
    • 2014
  • This study reviewed the planning characteristics of dormitories for secondary schools in the Japanese Colonial Era by analyzing the architectural drawings collected by the National Archives of Korea. The dormitory was one of the essential facilities in secondary schools but there have been few studies in this area. The analysis items were the site plan and the planning characteristics of student bedrooms, dining hall, and supervisor's area, which were the main elements of the dormitory. The results of this study were summarized as follows. 1) Generally, the dormitory area was placed in the rear of buildings for teaching with a close connection. 2) The student bedroom wings were laid out in parallel to the south as a rule making the typical site plan pattern for a dormitory, whereas the other parts of dormitory, such as the dining hall and supervisor's area were placed in the site conditions. 3) Generally, the unit plans of bedrooms for Korean schools were the ondol type and were small in size, whereas those for Japanese were the tatami type and large in size with separate study and sleeping areas. 4) The dining hall annex was made up of a dining hall and kitchen-bathroom area in general. For Japanese schools, the school store area was added to these areas. The typical shapes of dining hall plans were narrow and long with an adjacent corridor, so the overall plan of the dining hall annex was like that of a single-corridor type block plan. 5) The supervisor's area was a smaller part of the dormitory but it was considered to be a symbolic part of the whole dormitory in site planning and design.

A Survey on the Performance-based Design Status of Fire-fighting Facilities through the Whole Design Drawings and Specifications (설계도서 전수조사를 통한 소방시설분야 성능위주설계 현황조사)

  • Jeon, Eun-Goo;Bae, Young-Hoon;An, Sung-Ho;Hwang, Cheol-Hong;Hong, Won-Hwa;Choi, Jun-Ho
    • Fire Science and Engineering
    • /
    • v.33 no.5
    • /
    • pp.155-162
    • /
    • 2019
  • In Korea, the relevant laws and regulations for fire safety in buildings have been revised. Since 2011, Performance-based Design has been conducted for large-scale or high-rise buildings. However, the Korea's performance-based design is still at a level where life safety evaluation using fire and evacuation simulation tools is compared with existing methods. Although related studies have been conducted continuously for the mandatory performance-based design, the fact that it is relatively unsatisfactory for design and construction of fire-fighting facilities as it mainly focuses on administrative and institutional improvement measures or computer simulation. This study collected 91 performance-based design documents that were carried out nationwide at the initial stage of implementation until 2016 to analyze the status of performance-based design of fire-fighting facilities. As a result, fire-fighting facilities, except for fire extinguish system facilities, were not properly designed for performance. Furthermore, the designers found that if corresponding facilities or higher-level equipment with upgraded performance is additionally installed, the performance-based design fared well compared to the existing the prescriptive-based design.

Benchmarking of US General Contractor's Pre-construction Services for a CM at Risk Project to Improve Contractor's Competitiveness (책임형 CM사 경쟁력 확보 및 선진화를 위한 미국 건설사의 시공이전단계 서비스 벤치마킹 연구)

  • Lee, Chang-Jae;Lee, Sang-Hyo;Ahn, Yong-Han
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.3
    • /
    • pp.9-18
    • /
    • 2017
  • Construction Management at Risk (CMAR) is a project delivery method that enables CM companies to deliver projects at a Guaranteed Maximum Price (GMP). General contractors can apply CMAR from the initial design phase right through the construction phase to reduce risks and improve project performance. One of the major advantages CMAR offers is that it permits a general contractor to provide a comprehensive suite of preconstruction services, including estimating, a constructability review, value engineering, drawings and a specification review, green building, and Building Information Modeling(BIM), among others. However, general contractors in South Korea currently provide only limited preconstruction services using CMAR because few CMAR projects have yet been implemented in Korea and their experience using the method is therefore limited. This benchmark study of how foreign general contractors utilize CMAR in their projects, particularly during the preconstruction process, its purpose, and the roles and responsibilities of each of the different participants in successful implementations thus provides invaluable information and will serve as a useful guide for Korean contractors seeking to incorporate CMAR preconstruction services in their projects and thus improve the competitiveness of their construction businesses.

Object Classification List for BIM-based Maintenance Information Modeling in Electrical and Telecommunications Field of Architecture (BIM 기반 유지관리정보 모델링을 위한 객체분류목록 개발 -건축 전기/정보통신 분야를 중심으로-)

  • Song, Jong-Kwan;Cho, Gen-Ha;Won, Ji-Sun;Ju, Ki-Beom;Bea, Si-Hwa
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.5
    • /
    • pp.3183-3191
    • /
    • 2014
  • It is essential to effectively manage facilities because operating and maintenance cost for them accounts for more than 83% of lifecycle cost. This study developed BIM Object-based classification list to manage information required to operating and maintenance phase of them from design and construction phase. In order to develop this classification list, Construction Information Classification System, Design Criteria for Architectural Electrical Installations, commodity list classification of PPS(Public Procurement Service) were analyzed. and problems for consisting of object classification list were drawn. And each materials is classified that drawings discipline code (KSF 1540:2010 (Principle and criteria for CAD Drawing) was classified as level 1 to cover main areas and construction information classification system was classified as level 2 to cover elements also UNSPSC was classified as level 3 to cover objects for devices and equipments. this classification criteria was given code. This study is expected to be useful to exchange and share information in operating and maintenance phase by offering object point of view classification in design and construction phase. besides, it is looking forward to effective operating and maintenance of facilities by enabling management of devices and equipments by function, space, use.

A Basic Study on BIM Library Business Model based on Building Material Information System (건축 자재 정보 시스템기반 BIM 라이브러리 비즈니스 모델에 관한 기초 연구)

  • Lee, Goon-Jae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.4
    • /
    • pp.43-49
    • /
    • 2017
  • In recent years, the use of BIM in domestic construction has been increasing, but it is used mainly for internal and external visualization rather than for BIM design including drawings. For this reason, several studies have highlighted the lack of libraries and economic problems for BIM design. In other words, for the most economically small domestic design offices, activating the BIM design is a negative factor because it is difficult to invest the necessary manpower and cost to produce and use the required BIM library. The BIM design can be more applicable if the library can be supplied economically, easily, and quickly. In this study, BIM library business model and consideration factors that can provide BIM library service economically, easily, and quickly by considering the existing building material selection task and BIM library are presented. The proposed business model will increase the number of suppliers of BIM libraries, which are lacking in Korea, and will enable an effective BIM design at low cost and effort. If a service that reflects the business model proposed in this study is made, an integrated database that can consistently share information in the design, construction, and maintenance stages will be constructed. This can monitor the changes in material and equipment information during the life cycle of the building. The database can be used to monitor any changes in material and equipment information throughout the life cycle of a building, so that it can be used as historical data for effective design and maintenance as well as for material and equipment upgrades.

Difference Factors Analysis of between Quantity Take-off Using BIM Model and Using 2D Drawings in Reinforced Concrete Building Frame (건물 골조수량 산출 시 BIM모델 기반 수량과 2D도면 기반 수량 차이 요인 분석)

  • Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.5
    • /
    • pp.651-662
    • /
    • 2023
  • Recently, research on the use of Building Information Modeling(BIM) for various construction management activities is being actively conducted, and interest in 3D model-based estimation is increasing because it has the advantage of being able to be automatically performed using the attribute information of the 3D model. Therefore, this study aimed that the difference in the quantities is calculated the quantity based on the 2D drawing of a building and is extracted from the 3D model created by the Revit software was compared and tried to find out the cause. The difference in the quantity calculated by the two methods was the largest in the formwork, followed by the smallest in the order of the quantity of rebar and concrete. The reason for this difference is that there is a part where the quantity extraction in the 3D model is not suitable for the quantity calculation standard, and in particular, in the case of formwork, it was difficult to separate only the quantity of the necessary part. In addition, since the quantity of rebar was not separated by member, it was impossible to accurately compare the quantity and identify the cause of the difference. Therefore, it is considered to be the most reasonable to use application software that imports only the numerical information necessary for quantity calculation from the 3D model and applies a separate calculation formula.

A Study on the Construction Cost Risk through Analyzing the Actual Cost of Public Apartment (공공주택 실적공사비 분석을 통한 공사비 리스크에 관한 연구)

  • Yoon, Woo-Sung;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.65-78
    • /
    • 2011
  • Construction business, which is complex and long-term business, requires accurate estimation and verification in construction costs and payment procedure from project planning to the completion of construction phase. And more importantly, it is necessary to investigate and determine the risk factors related to construction costs during the entire process including design planning, construction drawings, and quantity calculating. But, currently, it is not seem to be adequate to cope with the risk and increased construction costs against the operational budget in terms of actual costs when screening and estimating the bidding cost of public apartment. Therefore, this study selected and analyzed 40 sites' report of construction completion account from 2004 to 2010 focused on the adequacy on the modification of contract and design planning and on the complication of the budget in the beginning of the project. This study deducted various risk causes and results by analyzing actual costs according to year, architectural area, region, construction cost and sale/lease classification. We could find out construction risk according to annual variation of government policy and economy, and also deducted risk items by construction characteristic according to region and architectural area. Study result, we first found out the problems of lowest price award system according to the construction costs. The weight of the cost increase risk was analyzed that subcontract and material costs are very high. Roof and tile work were analyzed highly in subcontract cost risk and reinforcing bar and cement were analyzed highly in material cost risk, among direct construction cost. Finally, this study results could be used in comparing the categories of the construction costs made by specific construction process, belonging to the construction costs, with the operational budget made in the beginning of the project that can enable to grasp unpredictable risks over the construction costs and making quantitative analysis for it through analyzing the range of fluctuation and variations led by the fluctuations in the actual construction costs.