• Title/Summary/Keyword: architectural construction cost

Search Result 592, Processing Time 0.057 seconds

Multi-objective Optimization Model for Tower Crane Layout Planning in Modular Construction (모듈러 건축의 타워크레인 배치계획 수립을 위한 다중 최적화 모델 개발)

  • Yoon, Sungboo;Park, Moonseo;Jung, Minhyuk;Hyun, Hosang;Ahn, Suho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.1
    • /
    • pp.36-46
    • /
    • 2021
  • With an increasing trend toward high-rise modular construction, the simultaneous use of tower cranes at a modular construction site has recently been observed. Tower crane layout planning (TCLP) has a significant effect on cost, duration, safety and productivity of a project. In a modular construction project, particularly, poor decision about the layout of tower cranes is likely to have negative effects like additional employment of cranes and redesign, which will lead to additional costs and possible delays. It is, therefore, crucial to conduct thorough inspection of field conditions, lifting materials, tower crane capacity to make decisions on the layout of tower cranes. However, several challenges exist in planning for a multi-crane construction site in terms of safety and collaboration, which makes planning with experience and intuition complicated. This paper suggests a multi-objective optimization model for selection of the number of tower cranes, their models and locations, which minimizes cost and conflict. The proposed model contributes to the body of knowledge by showing the feasibility of using multi-objective optimization for TCLP decision-making process with consideration of trade-offs between cost and conflict.

Structural Analysis of Earthwork Productivity Influence Factors Using Fuzzy DEMATEL Method (Fuzzy DEMATEL 방법을 활용한 토공사 생산성 영향요인 구조분석)

  • Lee, Chanwoo;Kim, Hyeonmin;Kim, Hyungjun;Cho, Hunhee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.6
    • /
    • pp.751-760
    • /
    • 2023
  • Enhancing productivity in earthwork projects is crucial, significantly affecting both time and cost efficiencies. However, existing research in this domain predominantly relies on qualitative data and methodologies, which may not suffice given its critical significance. This study employed the fuzzy DEMATEL method to conduct a structural analysis of variables affecting productivity in construction projects. The findings reveal that plan changes possess the most substantial overall influence on earthwork productivity, with a comprehensive strength rating of 4.58. Additionally, it was observed that precipitation data exerted the most pronounced positive impact, with a rating of 0.48. These insights are anticipated to aid in identifying and prioritizing areas for productivity enhancement in construction projects.

A Case Study on Construction Cost Comparison for On-Site Construction and Off-Site Construction of Plant Project (플랜트 건설의 현장시공 및 모듈시공에 대한 공사비 비교 사례연구 - Pipe Rack을 대상으로 공사비 산정 -)

  • Kang, Hyun Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.4
    • /
    • pp.25-34
    • /
    • 2023
  • The purpose of this study is to calculate and compare construction costs for On-Site Construction and Off-Site Construction in Plant Project. For this purpose, the target for calculating the construction cost was limited to the Pipe Rack(Steel Structure and Piping). The results derived according to the purpose of the study are as follows. 1)The direct construction cost for On-Site Pipe Rack construction was KRW 56 billion, with Steel Structure KRW 25.1 billion and Piping KRW 30.8 billion won. 2)Comparing the rate of change between On-Site Construction and Off-Site Construction, material costs increased by 1.9% and expenses by 192.1%, but labor costs decreased by -9.1%, resulting in a total direct construction cost increase of 8.4%. These results can be used as reference data to check the current status of the increase or decrease in construction costs when constructing Pipe Racks as Off-Site Construction.

A Study on the Applicability of Character Recognition Technology for Construction Supply Chain Management of Structural Steel Components and Precast Concrete Works (철골 및 PC 공사의 물류관리를 위한 문자 인식 기술의 적용성 검토)

  • Kim, Jun-Sik;Chin, Sangyoon;Yoon, Su-Won
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.4
    • /
    • pp.20-29
    • /
    • 2014
  • As construction projects increase their complexity, variety, and scale, various recognition applications (such as RFID, bar-code etc.) have been tried for managing material effectively in construction projects. However, existing recognition applications for construction material management have some limitations that cause additional works (such as attaching RFID tag), additional cost (labor cost, recognition device cost, etc.), and cognitive impairment of workers. Therefore, this study proposed a character recognition technology as an alternative of previous recognition technologies such as RFID, bar-code, etc. The technical feasibility of proposed technology was validated by three recognition tests. Additionally, this study proposed code the structure to manage materials using the character recognition technology. The effects of character recognition technology are presented by comparing with existing RFID-based logistics processes.

A Schematic Estimation Model for Structure Costs of High-rise Buildings based on Vertical and Horizontal Elements (고층건물 수직·수평 요소기반 골조공사 개산견적 모델)

  • Nam, Dong-Hee;Park, Hyung-Jin;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.3-10
    • /
    • 2014
  • High-rise buildings need thorough cost management because of large size and high risk. Cost management makes a budget by establishing and analyzing detail element at planning phase, needs cost control as each design phase, then reflected to next design. This research develops a schematic estimation model based on vertical and horizontal elements at design phase for structure cost of high-rise buildings to reduce error range and use data as design management. Usability of the model is confirmed by case study. The estimation model is expected to contribute to making the cost model more effective and satisfactory to concerned in construction or budget department and manage keeping track of the cost.

Cost Normalization Framework for a Benchmarking System: A Case for Downstream and Chemical Construction Projects

  • Yin, Zhe;DeGezelle, Deborah;Pappas, Mike;Caldas, Carlos
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.590-598
    • /
    • 2022
  • Benchmarking is an important tool to assess the performance of capital projects in the construction industry. Incorporating cost-related metrics into a benchmarking system requires an effective cost normalization process to enable meaningful comparisons among projects that were executed at different locations and times. Projects in the downstream and chemicals sector have unique characteristics compared to other types of construction projects, they require a distinctive cost normalization framework to be developed to benchmark their absolute cost performance. The purpose of this study is to develop such a framework to be used for the case of benchmarking the downstream and chemical projects for their performance assessment. The research team started with a review of existing cost normalization methodologies adopted in benchmarking systems and conducted 7 interviews to identify the current cost normalization practices used by industrial professionals. A panel of 12 experts was then convened and it held 6 review sessions to accomplish the framework development. The cost normalization framework for benchmarking downstream and chemical projects was established as a three-step procedure and it adopts a 4-element cost breakdown structure to accommodate projects submitted by both owners and contractors. It also incorporated 5 published cost indexes that are compatible with downstream and chemical projects and they were embedded into 2 options to complete the normalization process. The framework was then pilot-tested on 4 completed projects to validate its functional practicality and the downstream and chemical use case in the benchmarking system.

  • PDF

Cooling and Heating Energy Performance and Cost Analysis of Vertical Closed-loop Geothermal Heat Pump Coupled with Heat Storage Tank Compared to Conventional HVAC System (일반공조 시스템 대비 축열조와 연동된 수직밀폐형 지열히트펌프의 냉난방 에너지 성능 및 경제성 분석)

  • Kim, Min-Ji;Do, Sung-Lok;Choi, Jong-Min;Lee, Kwang Ho
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.11
    • /
    • pp.81-87
    • /
    • 2018
  • Among various types of geothermal heat pump systems, Vertical Closed-Loop Geothermal Heat Pump (VGSHP) has received increasing attention due to a variety of advantages such as the potential to be installed in a relatively small space and improved energy efficiency. In this research, the performance of VGSHP system coupled with heat storage tank was evaluated, by analyzing operational behavior of heat storage tank, the variations of heat pump energy performance due to the connection with heat storage tank, part load ratios characteristics of heat pump and the corresponding energy cost, compared to chiller and boiler based conventional system. The results of this study showed that the VGSHP system coupled with heat storage tank showed an energy saving effect of about 18% for cooling and about 73% for heating, and annual heating/cooling energy cost reduction of 43,000,000 KRW ($ 39,000), compared to the conventional air conditioning system. In addition, after considering both energy cost and initial investment cost including equipment, installation and auxiliary device expenses, payback period of approximately 11.8 years was required.

A Study on the Method for the Estimate of Construction Management in the Program Management (종합건설사업관리 사업관리비용산정을 위한 방법연구 - 기획단계에서 실시설계 입찰까지 -)

  • Baek, Myeongchang;Park, Junmo;Park, Gilbeom;Kim, Okkyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.3-12
    • /
    • 2014
  • With the scale of program management getting larger and complexity, More accurate and precise method for management cost estimate is demanded. However, most of project management cost estimates are based on similar cases and hence can not reflect distinct features of each project. Cost estimate precision is also not up to the standards, and also troublesome to policy-making and budget allocation. Therefore, project typical model for cost estimate of Comprehensive Project Management is developed, and makes it easier to manage level of effort and allocate cost by applying characteristic factor of each project. This study categorized the project package by phase; planning, detailed design, and bid procurement, to develop typical model. And by designating specific level of effort required for each field and rank, the study aims to improve the method for calculating the detailed and objective program cost. Outcome of this study will prevent conflicts between client and contractor, accurately calculate program management contract cost for the client, and become a reference for the contractor to receive rational and practical payments for their work.

Analysis of Factors Affecting Economic Feasibility of Long-term Public Rental Housing Reconstruction Project

  • Joe, Won Goog;Cho, Jae Ho;Son, Bo Sik;Chae, Myung Jin;Lim, Nam Gi;Chun, Jae Youl
    • Architectural research
    • /
    • v.24 no.3
    • /
    • pp.85-91
    • /
    • 2022
  • The public rental housing policy aims to provide the housing to the vulnerable class who do not have enough credit to own houses. The Korean government introduced new policies for housing supply to improve the availability of new houses. However, it is difficult to expand the supply because of the accumulated deficit of public rental housing. In this study, the economic feasibility of long-term public rental housing reconstruction projects was examined to ensure the economic and sustainable growth of public rental housing. The research found that the compensation for the accumulated deficit is needed. Also the research analyzed and identified the factors affecting the economic feasibility of reconstruction projects. The significant factors identified in this research are: the supply price of pre-sale/rental housing in the reconstruction project, total cost of the reconstruction project, and total floor area of the reconstruction project. According to the analysis results, it is necessary to increase the rent of existing long-term public rental housing, expand the government subsidy, increase the supply price of pre-sale/rental housing, and reduce the total project cost. However, there are limitations. For example, the fluctuations of construction market, residents' burden of housing costs, and the limit of the budget of the public housing authority. The increasing total Floor Area Ratio(FAR) limitation of the reconstruction project would be the realistic solution to the problem because it gives incentives to the reconstruction project.

BIM-based Property Management by Linking Maintenance with Financial Data for Commercial Building Projects

  • Shin, Hyeonju;Cha, Heesung
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.418-425
    • /
    • 2022
  • For a commercial building, property managers play an important role in maximizing the benefit by reducing cost and increasing revenue in the operation and maintenance phase of the building. However, most of property managers are spending their time in monitoring facility managers who have little impact on cost reduction and maximization of operating profit. The industry practitioners have difficutlty in increasing the efficiency of thier work due to this work environment. In addition, both property managers(PMr) and facility managers(FMr) are dependent on the paper drawings and manuals, which can worsen the inefficiency and human errors are inevitable. This study aims to contribute to improvement of the current practice by developing a novel algorithm that autmatically links the facility information with 3D model, which can provide an efficient property management for commercial buildings.

  • PDF