• 제목/요약/키워드: apartment housing project

검색결과 170건 처리시간 0.032초

DEVELOPMENT OF FEASIBILITY ANALYSIS MODEL FOR DEVELOPER-REQUESTED HOUSING PROJECTS

  • Young-Ki Huh;Bon-Gang Hwang;Joong-Seok Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.847-855
    • /
    • 2009
  • While many studies on feasibility analysis for housing projects have been released, the main focus was on economic feasibility and factors related to developers were not clearly identified enough to be used in practice. In order to establish a feasibility analysis model for apartment development projects requested by developers in Korea, 31 driving factors behind projects' success were identified under seven different categories. Criterions of the each factor were also developed, and weight of each factor was assigned by applying the Analytical Hierarchy Process(AHP). Finally, based on the Monte Carlo simulation, the feasibility analysis model was established, providing probability distribution of project's grade. The model was applied to 12 housing projects to verify its reliability, and found that the model properly filtered projects that are unlikely to be profitable, indicating reasonable reliability of the model. The model can be a useful tool for contractors, especially with less experience in analyzing project development feasibility.

  • PDF

아파트 담장허물기 유형별 가로공간의 물리적 환경변화 및 이용특성 연구 (A Study on the Physical Environmental Alternations and the Using Characteristics of the Street Place by the Wall Removal Project Types)

  • 김묘정;정지석
    • 한국주거학회논문집
    • /
    • 제24권2호
    • /
    • pp.25-33
    • /
    • 2013
  • The purpose of this study was to compare the differences between two types of wall removal projects. One was the case that removed one side wall of the apartment in Daegu, another was the instance that eliminated the walls between two apartments in Gimcheon. For this study, the observation method was performed to know the using pattern on the street space, and survey including resident's opinion and satisfaction about result of the project was conducted to gather data. The total number of objects to analysis was 157. The conclusion of this study is as follows. First, when the space was secure from danger of cars, people could access easily. And when it had interesting elements, the street space after wall removal was used by residents. Second, the effective method to connect places was to make intermediate space after wall removal project. In this sense, the way can help to improve the level of quality the daily life of residents. Finally, in the apartment-oriented wall removal project, it could supplement the flaw of the detached house-oriented project and effective potentiality for vitalization of community.

SUGGESTING IMPROVEMENT METHODS OF FORM WORK FOR COST REDUCTION IN THE MID-RISE APARTMENT HOUSING

  • Jeongseok Lee;Seunghee Kang;Gunhee Cho;Jeongrak Sohn;Jongdae Bang
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1608-1614
    • /
    • 2009
  • In recent days, the study of urban regeneration has been conducting with purposeful and sincere intent starting out with the residential environment improvement works. Within the range of urban regeneration, the low-cost housing technology means development of totally-integrated housing technology that may be applied to the regeneration project, especially for the rundown areas where infrastructure facilities in the urban zone have been degraded and obsoleted. In line with this, among many and varied methods in order for realization of the low-cost housing as a part of urban regeneration project, this study should like to propose an improvement methods of the key technologies in relation to the construction works by type of work with which construction costs (directing cost) would be reduced. And, in order to elicit the method for element technology that has been developed and improved in the most optimal manner centering on the selected construction work by the type of work, the researcher conducted comparative review of summary of element technologies related to the construction works concerned, characteristics, and construction method thereof. In particular, the researcher investigated the expenses (construction cost and labor cost), constructions (contractibility and productivity), safety, quality of works, and the technical status in environmental aspects, and the researcher also conducted analyses and evaluations thereof.

  • PDF

공구분할기반 공동주택 거푸집공사 작업조 구성 프로세스 (Process of Formwork Crew Team Formation Based on Work Zoning in Apartment Housing Projects)

  • 구교진;조동현;이준호;박상헌;박찬수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.285-286
    • /
    • 2012
  • In the large scale projects, it is difficult to manage every blocks because of the apartment housing project have repetitive shapes and structures. Therefore, it is necessary to divide construction site into work zones and blocks considering site plan, the number of units per each floor, arrangement of blocks, etc. In this study, 20 influencing factors on the grouping of work zones and formwork crew team formation are identified through case study and literature review. Factors are analyzed to determine the degree of influence through experts interviews. A systematic process of crew formation based on work zoning and the considerations by each steps are presented.

  • PDF

주택개발 프로젝트 금융의 현황과 정책과제 (Current Status of Housing Development Project Finance and Its Policy Implications)

  • 박원석
    • 한국지역지리학회지
    • /
    • 제11권4호
    • /
    • pp.511-522
    • /
    • 2005
  • 본 연구는 금융기관의 주택개발 프로젝트 금융의 활용 현황자료 분석을 통해 주택개발사업에서 프로젝트 금융의 활용 실태, 특성, 문제점을 파악하고, 주택개발 금융시스템의 선진화를 위한 프로젝트 금융의 효과적인 활용 방안을 도출하는 것을 목적으로 한다. 분석결과를 보면, 2001년 이후 주택개발사업에서 프로젝트 금융이 활발히 일어나고 있으며, 그 중에서도 아파트 개발사업에서 가장 활발히 일어나고 있다. 그런데, 현재 주택 개발사업에서 활용하고 있는 프로젝트 금융은 대다수가 별도의 특수목적회사를 설립하지 않고, 금융기관이 사업시행자에게 특정 프로젝트에만 자금사용을 제한하는 조건부 기업금융 구조를 가지고 있다. 또한, 원리금 상환위험의 관리도 프로젝트의 사업성보다는 시공회사의 보증에 의존하고 있어, 엄밀한 의미의 프로젝트 금융시장은 아직 정착되지 못한 것으로 판단된다. 향후 주택개발 프로젝트 금융의 효과적인 성장을 위한 정책과제로는 주택개발사업의 투명성 확보와 세제지원을 골자로 하는 프로젝트 금융방식의 제도화 방안, 주택개발 프로젝트 금융에 대한 금융기관의 사업성 분석 역량 강화 방안, 부동산펀드 등 부동산 관련 금융상품의 효과적 활용 방안, 주택개발금융과 주택수요자금융의 효과적인 연계 방안을 들 수 있다.

  • PDF

개발사업지구의 공원 · 녹지 유형별 탄소효과 원단위 산정에 관한 기초연구 (A Study of Estimation of Carbon Effects per Unit Area by Park & Green Type in Development Project Area)

  • 강명수;김종림;김남정
    • 한국환경복원기술학회지
    • /
    • 제16권5호
    • /
    • pp.71-81
    • /
    • 2013
  • This study is aimed to provide basic data for the estimation of carbon effects in development project areas such as Happy Housing Project which includes redevelopment and reconstruction projects by inducing the basic unit of carbon effects and strategic planning and management to enhance carbon effects. According to the analysis, in urban parks, carbon uptake and carbon storage by the unit area of living area parks were $7.614kg/m^2$ and $18.5203kg/m^2$ respectively while carbon uptake and carbon storage by the unit area of theme parks were $1.2261kg/m^2$ and $2.831kg/m^2$ each. In facility greens, carbon uptake and carbon storage were $0.5683kg/m^2$ and $0.6636kg/m^2$ respectively while they were $10.77kg/m^2$ and $13.69kg/m^2$ individually in other urban planning facilities. In other greens, on the contrary, carbon uptake and carbon storage were $0.45kg/m^2$ and $1.02kg/m^2$ respectively. In site landscape, carbon uptake and carbon storage by the unit area of apartment landscape were $3.7394kg/m^2$ and $9.2292kg/m^2$ each.

OFF-SITE MANUFACTURE OF APARTMENT BUILDINGS

  • Neville Boyd
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.304-310
    • /
    • 2011
  • The populations of major cities in Australia are increasing rapidly and facing an acute housing shortage. Traditional apartment procurement techniques involve lengthy lead-times and factory-based, or offsite manufactured (OSM) multi-storey apartment buildings may offer the opportunity to help fulfill the need by significantly reducing build times. Other advantages of OSM may include superior quality, low weight ratios, economies of scale achieved through repetition of prefabricated units, use on infill sites, sustainable design standards and better occupational health and safety. There are also positive labour and training implications, which may help to alleviate an industry-wide shortage of skills through use of semi-skilled labour. Previous uncertainties about the adoption of offsite due to the high capital costs and perception issues were generally based on pre-cast concrete structures, which are quite a different building type in terms of flexibility, construction, delivery and finishes. Identification of drivers and constraints assists in the determination of current industry status, allows for a benchmark to be established and future opportunities and directions for OSM to be determined.

  • PDF

노후아파트 재활용을 위한 건축디자인 의사결정 및 관리정책 연구 (A Study on a Rhabilitation Design, Decision Making and Housing Management Policies for Reuse of Deteriorated Apartments in Korea)

  • 손승광;조형근;조순철;최일
    • 한국주거학회논문집
    • /
    • 제13권5호
    • /
    • pp.77-88
    • /
    • 2002
  • This article deals the investigations how to solve the social deficiencies of deteriorate apartments, which is a half cycle of a building and it goes slum clearance and redevelopment. And this proposes an active remodeling and design strategy, management, and housing policies for extending the usage of the resource. Most of apartment housing in Korea is built by the panel wall and slab structure system fur economic price. To remake is possible, even though not designed in flexibility and variation. The remodeling strategies are dwelling unification, transformation of two units to one or three units, addition of a room, changing into commercial and community required spaces, and reshaping of a envelop and facade by addition of a dwelling or dwellings, roof floors, change of materials and colors, and so on. And, all activities in structural aspect are proposed removal in upper part and addition in lower part of an apartment housing. Active remodeling cost a great deal compare to new construction, so any remodeling activities should be based on a minimal interfere and budgets to enhancing the quality in existing building. The final aim of an active remodeling is to enhance the quality in economic values, and to keep original state and to put on the new one in a small part. To promote the active and careful management and rehabilitation, it is necessary to give the positive incentive in terms of architectural law, bank loan, and any redevelopment project should get the remodeling record in national resources.

공동주택 개량을 위한 재건축과 리모델링의 사업 추진 결정 방법 (A Decision Making Method between Reconstruction & Remodeling for Improvement of the Apartment Housing)

  • 김형만;윤석호;박찬식
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.476-479
    • /
    • 2004
  • 1970년대 산업화의 과정에서 인구의 도시 집중으로 인한 주택수요의 급격한 증가로 우리나라의 주택정책은 공급위주의 편향된 방향으로 진행되었다. 급속한 공동주택의 보급은 품질의 조악화에 따른 조기 노후화의 문제를 유발하였으며, 재건축과 리모델링이 이를 해결할 수 있는 방안들로 대두되었다. 따라서 본 연구에서는 소유자들이 스스로 주체가 되어 자신들의 공동주택에 대한 합리적인 의사결정을 도모할 수 있도록 재건축과 리모델링을 판단하는 평가방법을 제시하고자 한다. 우선 평가 항목 선정 과정을 통해 기능성과 경제성을 평가항목으로 설정하고, 재건축과 리모델링 의사결정을 위한 방법을 설정하기 위하여 계층화분석법을 이용하였으며, 기능성과 경제성 평가항목의 평가치를 통일하기 위하여 다기준의사결정법의 벡터규준화와 선형변환 과정을 이용하였다. 이러한 평가방법을 통해서 노후 공동주택의 소유자 조합이 합리적으로 대안을 선택할 수 있을 것으로 판단된다.

  • PDF

행정중심도시 공동주택 설계공모안의 배치 계획 및 경향 분석 (An Analysis on the Layout Patterns and their Trends in the Apartment Housing Design Competitions of Sejong City)

  • 김형진;김영석;김상진;조중근;박찬규
    • 한국산학기술학회논문지
    • /
    • 제11권4호
    • /
    • pp.1381-1390
    • /
    • 2010
  • 본 연구는 최근에 적용되고 있는 다양한 설계 기법과 최근의 동향을 행정중심도시 설계안들을 통해 조명해보고자 한다. 왜냐하면 행정중심도시가 가장 최근에 실시된 주거단지 현상설계이며, 우리나라 주거단지 계획을 선도하는 대표적인 설계사무소와 건설 회사들이 참여했기 때문이다. 따라서 이 공모안들에 다양한 계획 개념들이 사용되었을 것이라 여겨지며, 이러한 분석과 평가는 향후 공동 주택의 설계 향상을 위해서도 도움이 될 것이다.