Analyzing the Competence of Construction Engineers in Apartment Construction (아파트 공사에서의 건설기술자 역량 분석 연구 - 공무업무를 중심으로 -)

  • Kim, Hu Yong;Kim, Yea Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.6
    • /
    • pp.14-23
    • /
    • 2018
  • In the domestic construction industry, large-scale housing construction projects are being carried out by construction companies with competitiveness in the domestic top 10, it is said that the competence of the construction engineer is a factor for the success of the project. In Korea, there is National Competency Standards (NCS) that systematize contents of knowledge, technology, and attitude required in order to perform job in industrial field as the importance of individual ability is systemized in the country. Therefore, in this study, defined the detail competence in construction administration works, and examined the level of competence and degree of impotance detailed competency of construction engineers using AHP analysis & ANOVA. As a result, it was found that the current capacity of the Engineers in the apartment construction work is insufficient compared to the level of the competence they think they have, and that they have different competencies depending on their work experience and job position. This means that if the career is accumulated, the capacity that is possessed naturally will be changed. Therefore, it will be necessary to improve the capacity of the construction engineers who have a short work experience and a low job level.

The Process of Urban Development of Chilgok District in Daegu City (대구시 칠곡지구의 도시발달)

  • Jin, Won-Hyung
    • Journal of the Korean association of regional geographers
    • /
    • v.10 no.1
    • /
    • pp.83-95
    • /
    • 2004
  • Chilgok District is a historical area, which has had a certain amount of development. It has its own regional characteristics originating from its isolation from the existing built up area of Daegu City by the Kumho River This study explores the historical development processes and pending development issues of Chilgok District. In 1640 after the Japanese invasion of Korea in 1592, the district upgraded into Chilgok Dohobu due to its importance as a transportation hub of Youngnamdaero(the main road of Youngnam province in Chosun Dynasty). In its early stages, the government office was located in Kasan fortress, later the of office was moved to Eupnae-Dong. The Chilgok district has experienced a developmental lag resulting from the office's removal to Waegwan, located on the Kyungbu railroad since 1914. Later, due to the increasing influence of nearby Daegu City, urbanization continued gradually. Finally in 1981 Chilgok district was officially incorporated into Daegu Metropolitan City. In the later 1980s, the housing land development project was applied into the district centered on the alluvial plain of Palgeo-Cheon(stream) of the Northern part of Taejun-Bridge. Although the old built up zone was excluded from public sector development projects, private sector development has made the zone a modern town. Now, Chilgok district has transformed into a high-density residential new town in which high-rise apartment complexes mingle with numerous houses. As the district has developed, traffic jams have become a hot issue and it is going to get worse than now as the development continues. To solve this problem, Daegu city needs to swiftly construct the fourth belt way and the third subway line.

  • PDF

Optimization of Estimating Duration of the Structural Frame for the High-rise Apartment Housing during the Winter season -Focusing on One Cycle Time Scheduling Mechanism of the Typical Floor- (동절기 아파트 골조공사의 적정공기 산정에 관한 연구 - 기준층 사이클 공정분석을 중심으로 -)

  • Bang Jong-Dae;Han Choong-Hee;Kim Sun-Kuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.170-178
    • /
    • 2004
  • Public construction companies have strictly followed a rule that they should not work in the wet area such as structural frame for a certain period during the winter season. It is usually known that the non-working period during the winter causes increase of the project duration, and the project cost escalation. Also, it makes negative effects on national economy because it reduces workers income. Therefore, the site work for the structural frame should be performed even during the whiter season. But the site work for the structural frame during that period cannot proceeds in the same way as during other periods, and requires a different method for estimating project duration. Through an analysis of time scheduling mechanism, actual working days are obtained for 1 cycle of typical floors in the structural frame during these periods, and non-working days of 5 years average are calculated based on calendar day using data of 5 years weather forecasts for that season. This study proposes an optimized way of estimating project duration for 1 cycle of typical floors in the structural frame during these periods. This estimating method uses the combined actual working days and non-working days of 5 years' average, and the estimated results are confirmed by being compared with field data. This study is expected to be used in estimating the construction duration of the structural frame during the winter season.

Technical Proposal based Bidding System Applying the Concept of the Lowest Total Combined Bid Price for Supplying Affordable Housing (최저통합환산가격 개념을 적용한 기술제안 기반 입찰제도)

  • Cho, Gun-Hee;Kang, Seung-Hee;Lee, Jeong-Seok;Sohn, Jeong-Rak;Bang, Jong-Dae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.94-105
    • /
    • 2010
  • Recently, resettlement problems of low income groups in the urban regeneration area have been issued in Korea because they have no capability to purchase (or lease) redeveloped housing (or apartment). There are several approaches for supplying affordable housing and one of these is the bidding system which can reduce construction cost. However, the lowest bidding system has many problems such as dumping and substandard quality. In this context, this study proposed bidding system based on technical proposal applying the concept of the lowest total combined bid price for optimization of bid price, reduction of construction cost and period, and maintenance of suitable quality. This bidding system embraces the best value and cost plus time concept on the basis of an improved lowest price bidding system. It consists of the following components: work unit based, project unit based, and period reducing technical proposals. The proposed bidding system for determining bidders are designed to evaluate the adequacy of each technical proposal in the order of the combined minimum price in an effort to effectively optimize bid prices and reduce the construction periods, as well as to maintain a minimum appropriate quality.

Improvement Strategy & Current Bidding Situation on Apartment Management of Landscape Architecture (공동주택 조경관리 입찰 실태와 개선방안)

  • Hong, Jong-Hyun;Park, Hyun-Bin;Yoon, Jong-Myeone;Kim, Dong-Pil
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.48 no.4
    • /
    • pp.41-54
    • /
    • 2020
  • This study was conducted to provide basic data for a transparent and fair bidding system by identifying problems and suggesting improvement measures through an analysis of the bidding status for construction projects and service-related landscaping of multi-family housing. To this end, we used the data from the "Multi-Family Housing Management Information System (K-apt)" that provides the history of apartment maintenance, bidding information, and the electronic bidding system to examine the winning bid status and amount, along with the size and trends of the winning bids by year, and the results of the selection of operators by construction type. As a result, it was found that out of the total number of successful bids (36,831), 4.4% (16,631) were in the landscaping business, and the average winning bid value was found to be about 24 million won. According to the data, 73% of the landscaping cases were valued between 3 million won and 30 million won, and 58.6% of the cases were in the field of "pest prevention and maintenance". 36% of the total number of bids were awarded from February to April, with "general competitive bidding" accounting for 59.8% of the bidding methods. As for the method of selecting the winning bidder, 55% adopted the "lowest bid" and "electronic bidding method," and 45% adopted the "qualification screening system" and "direct bidding method." As an improvement to the problems derived from the bidding status data, the following are recommended: First, the exception clause to the current 'electronic bidding method' application regulations must be minimized to activate the electronic bidding method so that a fair bidding system can be operated. Second, landscaping management standards for green area environmental quality of multi-family housing must be prepared. Third, the provisions for preparing design books, such as detailed statements and drawings before the bidding announcement, and calculating the basic amount shall be prepared so that fair bidding can be made by specifying the details of the project concretely and objectively must be made. Fourth, for various bidding conditions in the 'business operator selection guidelines', detailed guidelines for each condition, not the selection, need to be prepared to maintain fairness and consistency. These measures are believed to beuseful in the fair selection of landscaping operators for multi-family housing projects and to prepare objective and reasonable standards for the maintenance of landscaping facilities and a green environment.

A study on the Construction Materials Management using RFID (RFID를 활용한 건설공사 자재관리 방안 연구)

  • Oh, Kun-Soo;Song, Jeong-Hwa
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.1
    • /
    • pp.242-249
    • /
    • 2010
  • As the scale of domestic building construction becomes larger, more complicated and more specialized, demands for quality improvement, cost reduction and construction period shortening increase. Construction materials management becomes a main factor to perform the project successfully. Therefore, various researches using RFID(Radio Frequency Identification) are being studied to manage the construction materials efficiently. This research aims to suggest the method of construction materials management using RFID in apartment housing. First, the technical properties of RFID are grasped. Second, problems are extracted by analyzing the case studies and related research using RFID in construction field. Third, construction materials are classified according to the construction process and process of materials management is analyzed. Lastly, method of construction materials management using RFID is suggested. The results of this research are expected to contribute the improvement of construction productivity through effective material management.

Status of Economics Analysis Using LCC in Turn-Key Project : Focus on Landscape Architecture (설계시공일괄발주(턴키) 설계에서 LCC를 활용한 경제성 분석 실태: 조경분야를 중심으로)

  • Yoon, Yong-Han;Kim, Jeong-Ho
    • Journal of Environmental Policy
    • /
    • v.10 no.4
    • /
    • pp.39-59
    • /
    • 2011
  • In this article, I would like to analyze the conditions in applying the LCC method for each construction type by selecting 10 apartment complexes among the Turn-key projects which have been ongoing for the last 5 years. In addition, this article will identify the problems to the application of double landscape architecture and suggest improvement measures. Among the 10 case targets, a total of 151 LCC analyses were conducted, and the average application ratio placing for each construction type was shown in the following order: architecture (34.4%)> electricity (21.2%)>machine (18.5%)>civil engineering (13.2%)>landscape architecture (12.6%). As numbers show, landscape architecture was the lowest. The ratio of LCC reduction amount was shown in the following order: machine (32.1%)> architecture (23.9%)>electricity (23.4%)>civil engineering (17.5%)>landscape architecture (3.1%). The field of landscape architecture had a reduction amount that was about 5 to 6 times lower than civil engineering which had a similar number of LCC analysis cases. The total LCC analysis items of landscape architecture was 19, including 15 double packing material, 1 building covering, 1 grass planting, 1 planting infrastructure, and 1 facility. The following measures were suggested to promote LCC analysis in landscape architecture: first, set an analysis item that considers the construction expense ratio of landscape architecture; second, legal regulation of landscape architecture and expansion of its application; third, prepare VE/LCC standards which are suitable for landscape architecture.

  • PDF

Analysis of impact structure on Business satisfaction and Continuous business intention by the conflict Response and processing of Apartment Reconstruction projects (공동주택 재건축 사업의 갈등대응 및 처리가 사업만족도 및 지속적 사업의사에 미치는 영향구조 분석)

  • Kim, Hyung-Jin;Lee, Joo-Hyung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.3
    • /
    • pp.1699-1706
    • /
    • 2015
  • The purpose of this study is to induce a indicator related to the response, handling and management which are appeared on each step of business enforcement in housing reconstruction projects. Then, it aims to appropriately and reasonably resolve the conflicts of reconstruction business with relevant subjects. These projects physician satisfaction and continual business was going to have the impact that any analysis of the structure in an evaluation. In addition, this study analyzes the impact structure on the business satisfaction and a intention for continuous business through this evaluation. This study sets a operational hypothesis in order to verify the relationship between the variables. then, it creates the structural model by using the Smart PLS 3.0. After analyzing the impact structure by using total 252 samples, this study adopts the final hypothesis which shows (+) path coefficient as set in the hypothesis and test statistic above 1.65. In result, six out of the nine hyphothesis are adopted. then, The 'Response to conflict' which affects the 'Management to conflict(H1)' has a path coefficient of 0.618. In addition, the 'Handling to conflict' which affects the 'Management to conflict(H2)' has a path coefficient of 0.150. The 'Handling to conflict' which affects the satisfaction of 'business' has a path coefficient of 0.101. and the 'management to conflict' which affects the satisfaction of 'business(H7)' has a path coefficient of 0.644. In addition, the 'Intention for continuous business(H8)' shows a path coefficient of 0.258. Finally, The satisfaction of 'business' which affects the 'intention for continuous business(H9)' has a path coefficient of 0.391.

Community Recovery Considering the Spatial Characteristics of Shanty Towns (저소득층 주거지 공간적 특성을 고려한 공동체 회복)

  • Shin, Haeng-Woo;Kim, Young-Ook
    • Land and Housing Review
    • /
    • v.7 no.2
    • /
    • pp.97-102
    • /
    • 2016
  • It has recently become a major concern for us contemplating could regain the advantage with a 'village' concept of the traditional in a modern city. The village community recovery project which is one of the flagship projects of seoul is being actively conducted with the aim to form a network between residents and have even appeared positive results. Among the many efforts to recover community, spatial approach may be one solution. To secure a space for people to easily access, may bring about a small but significant effect. Community Space with high visual accessibility has a large effect as a space of communication and exchange of residents. Socio-economic efforts to restore the community has a limit. In some cases of poor village, Spatial relationship network was found to be a large influence on the formation of the socio-economic relations network. It is important to understand how people lived and formed a relationship within the space of traditional forms and space disappeared from rapid social change process. The community recovery efforts are needed through research and experiments for the residential network can reflect the spatial characteristics.

Constructability Analysis in Aged-Housing Remodeling Demolition Work for Maximizing Waste Recycling (폐기물 재활용성 향상을 위한 리모델링 철거공사의 시공성 평가 및 사례적용)

  • Chae, Seong-Hyun;Kim, Ki-Hyun;Cha, Hee-Sung;Kim, Kyung-Rai;Han, Ju-Yeoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.13-22
    • /
    • 2010
  • From now on, the aged apartment or house is expected to increase rapidly. So, we have to build a process of remodeling and develop the new technique. Demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stability of building. Therefore, we need a step to develop a assessment system, verify and make specified. This paper evaluated how much improve on construction speed, work efficiency, intensity of work and influence with another process comparing the existing method with the new demolition method. The qualitative and quantitative assessment system are developed with these output. The case study was carried out experimental group and control group, based on developed assessment system, which have the same condition. The existing method was made up of 3 steps- 1)Demolish windows, doors and iron goods, 2)Demolish indoor and outdoor walls, 3)Drop the waste. The new demolition method was made up of 5 steps- 1)Demolish windows, doors and iron goods, 2)Demolish the ceiling and wall's finishing materials, 3)Demolish the floor's finishing materials, 4)Demolish indoor and outdoor walls, 5)Drop the waste. Work time, idle time, the character of a work unit are analyzed by mock-up test. This study's output is expected to establish a systematic process of new demolition method and based on the maximizing waste recycling work in our construction industry.