• Title/Summary/Keyword: apartment building project

Search Result 137, Processing Time 0.034 seconds

Effectiveness Analysis of the Construction Schedule for PC Apartment Buildings using a Tower Crane (타워크레인을 적용한 대단지 PC공동주택의 공정계획 효용성 분석)

  • Kim, Ki-Ho;Lee, Bum-Sik;Lee, Dong-Gun;Kim, Min-Jun;Sohn, Jeong-Rak
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.105-106
    • /
    • 2023
  • In project projects where various factors arise, the construction company's initial establishment of a reasonable process plan reduces various variables and potential risks. In order to create a densely written initial process plan, it is necessary to compare the economic feasibility of time and money by reflecting Slack time. Through this, site managers can lead a successful project based on reasonable and stable construction.

  • PDF

Prefabricated Apartments Project Using Precast Concrete Large Panel System (프리캐스트 콘크리트 대형 패널을 이용한 조립식 아파트 공사)

  • 박의식
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1989.10a
    • /
    • pp.49-52
    • /
    • 1989
  • This report introduces the large scale prefabricated apartment project in Saudi Arabia designed and built by Hyundai Engineering and construction Co. as turn-key basis from ministry of Public works and ltousing of Saudi Arabia. This project using precast large panel system is 7,600 dwelling unit, total building area 1.8 mil sguare meters. Large panel system is a kind of industrialized building method which classified as monolithic system, total system and structural system. Hyundai Engineering and Construction Co. develop his own prefabricated large panel system for this project and named "HYUNDAI SYSTEM". The key point of this system is vertical and horizontal joints between panels. Also stability of whole building structure is especially important for this kind of prefabricated building. building.

  • PDF

Conflict Management in Planning phase of Remodeling Project through Multi-Agent based on Fuzzy Inference. (퍼지추론 기반 멀티 에이전트를 통한 리모델링 사업 전 추진단계에서의 갈등관리)

  • Park, Ji-Eun;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.202-203
    • /
    • 2015
  • To promote the remodeling project it is important to get apartment residents' consent. It is significant variable to determine project to progress smoothly from planning stage which committee of association establishment sets up to establishment stage of association. On average, it takes about 1~1.6 year in planning phase which means before construction phase of remodeling. Therefore, it is very important issue to get apartment residents' consent in planning phase. In this research, we focused on residents' opinion and proposed solution of conflict with gathering residents' opinion to proceed remodeling project. By setting particular remodeling situation, related residents represented as agents made effort to efficient coordination to reduce total duration of decision making. Therefore, we proposed multi-agent based on fuzzy inference to simulate behavior of decision making on remodeling project effectively. From this method, optimal alternative is selected by considering each agents' attributes which represented by fuzzy set. This research will develope to further research for realizing concrete multi-agent based on fuzzy inference considering all stakeholders in remodeling project.

  • PDF

The Success Factors of Scheduling Using the TACT Technique in Wall Type Apartment House Construction (벽식(壁式) 아파트의 택트공정(工程)계획의 성공요인 분석에 관(關)한 연구(硏究))

  • Kim Joon-Ho;Kim Gwang-Hee;Cho Hyung-Keun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.1 s.19
    • /
    • pp.79-86
    • /
    • 2006
  • Recently, the construction companies show lots of interest in reducing the construction duration of apartment housing project in Korea. Therefore, the purpose of this study is to investigate the success factors of scheduling using the TACT technique in wall type apartment house construction for managing the construction schedule effectively. For appling the tact scheduling technique to wall type apartment house construction, the success factors can be summarized as follows : (1) zoning the horizontal and vortical work area properly, (2) preparing the flow chart of finishing works, (3) minimizing the undefined activity like chipping off the concrete wall, (4) reordering the construction activities for keeping up the continuity of works in winter season, (5) dividing the amount of work for minimizing the delay time of any activity, etc.

Comparative Analysis of Construction Management Index for Apartment Remodeling Project (공동주택 리모델링을 위한 공사관리 지표 비교분석)

  • Lee, Dong-Heon;Baek, Nak-Ku;Lim, Hyoung-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.191-192
    • /
    • 2017
  • After 1980's, as economy was rapidly grown and real estate market was active, greatly increased in population has been supplied to the city. Accordingly, national apartment house market is located in the form of Urban Housing Culture. However, as time goes by the apartment houses where the supply of mass became superannuated and residential environment became poor. So, the environment of old apartment houses has been changed to improve with reconstruction. It has been changed in response to the demands of the times. It is one of essential part in a remodeling field for the future although it has some problems in the way that uses existing buildings.

  • PDF

Share of Cost Estimation Considering Business Contribution in Apartment Remodeling Projects (사업기여도를 고려한 공동주택 리모델링 사업의 분담금 산정)

  • Kim, Jeong-Won;Lee, Dong-Jin;Kim, Seung Jin;Jung, Kwang-Sub;Moon, Hyunseok;Lee, Min-Joo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.205-206
    • /
    • 2017
  • The purpose of this paper is to examine a reasonable share of cost in the apartment remodeling projects. Therefore, the case model of remodeling apartment was made up and then the rate of return by method of floor area change rate, method of proportion, method of investment earnings rate and method of proportion reflected business contribution were estimated. Consequently, the model by the method of proportion reflected business contribution presented 20.6% of rate in all apartment units.

  • PDF

Delay Factors Based on the Importance of Finish Work in Apartment Construction Project (공동주택 마감공사 중요도 기반 작업지연 요인 분석)

  • Lee, Seung-Hoon;Lee, Sang-Hyo;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.125-129
    • /
    • 2010
  • The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.

  • PDF

Prediction of Reduction of Traffic(Railroad) Noise using Soundproof Tunnel in a high-rise apartment building (고층 주거지역에서 터널형 철도 방음 시설의 소음 저감 예측)

  • 김준엽;나희승;엄기영;조준호
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2001.05a
    • /
    • pp.843-848
    • /
    • 2001
  • Railroad noise is one of the main causes of environmental impact. Whenever a new railroad line is planned or a housing project near an existing railroad is proposed, an estimate of the relevant noise levels is usually required. For this, it is necessary to quantify those parameters that affect the railroad noise. This paper deals with an estimation of railroad noise using soundproof tunnel in a high-rise apartment building

  • PDF

OFF-SITE MANUFACTURE OF APARTMENT BUILDINGS

  • Neville Boyd
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.304-310
    • /
    • 2011
  • The populations of major cities in Australia are increasing rapidly and facing an acute housing shortage. Traditional apartment procurement techniques involve lengthy lead-times and factory-based, or offsite manufactured (OSM) multi-storey apartment buildings may offer the opportunity to help fulfill the need by significantly reducing build times. Other advantages of OSM may include superior quality, low weight ratios, economies of scale achieved through repetition of prefabricated units, use on infill sites, sustainable design standards and better occupational health and safety. There are also positive labour and training implications, which may help to alleviate an industry-wide shortage of skills through use of semi-skilled labour. Previous uncertainties about the adoption of offsite due to the high capital costs and perception issues were generally based on pre-cast concrete structures, which are quite a different building type in terms of flexibility, construction, delivery and finishes. Identification of drivers and constraints assists in the determination of current industry status, allows for a benchmark to be established and future opportunities and directions for OSM to be determined.

  • PDF

A Study on Preferences for Apartment Interiors, Exteriors, and Neighborhood Environment for a Family Friendly Community Environment - Focused on Apartment Dwellers in Daejeon City- (가족친화마을 환경조성을 위한 주민들의 아파트 내.외부 및 근린환경 선호에 관한 연구 - 대전시 아파트 거주자를 중심으로 -)

  • Cha, Sung-Lan;Lee, Hae-Wook
    • Journal of Family Resource Management and Policy Review
    • /
    • v.15 no.2
    • /
    • pp.45-62
    • /
    • 2011
  • Since 2008, a communal child care and 'Family Pumasi' program have been conducted as a pilot project for the Healthy Family Support Center. These programs have been positioned as a step toward a family friendly community project. For the Healthy Family Support Centers, a family friendly community project is an essential program as a part of the policies in response to the country's low fertility. However, the people in charge face difficulties, because they do not have much experience in such projects. This study attempted to explore the preferences regarding interior and exterior apartment spaces, and neighborhood environment to provide information about how to better implement a family friendly community program. For this purpose, data were collected from 418 housewives who are apartment dwellers in Daejeon city. The results were as follows; first, the person in charge must consider child care facilities, culture, and sports centers in order to start building a community lifestyle. Second, people with relatively low levels of education and short terms of residence are more deeply motivated by community lifestyle compared to others. Third, families with their first young child showed much interest in communal child care facilities. If the people in charge can motivate and encourage such residents to be engaged in family friendly community projects, the project will effectively progress.

  • PDF