• Title/Summary/Keyword: apartment building project

Search Result 137, Processing Time 0.026 seconds

A Study on Application of MC Design Standardization Standard and Current Status in Ga-Yang Modular Housing (가양 모듈러 실증단지의 MC설계표준화 기준 적용 및 실태조사 연구)

  • Lim, Seok-Ho;Chung, Joon-Soo;Seol, Wook-Je;Baek, Cheong-Hoon
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.35 no.5
    • /
    • pp.85-94
    • /
    • 2019
  • The modular apartment has been completed for the first time in Korea through the national research and development (R&D) project in December 2017, and 30 households moved in. Although conditions such as technicality and constructability have to be satisfied to adopt and spread the modular apartments in the future, economic feasibility is the most important factor among the conditions. The economic feasibility of modular apartments can be compared with that of existing reinforced concrete (RC) structure apartments. It is highly important to reduce the construction cost through standardization above all. The standardization refers to establishment of national design standards and principles, and it is important for manufacturers and building companies to comply with those standards and principles. The modular construction (MC) skill in Korea is at an early adoption stage and the MC market is not widely expanded yet. Thus, the application of the MC design, which is the basis of the standardization, has not been widely accepted. However, related R&D projects are now performing mainly by the Ministry of Land, Infrastructure, and Transport to promote modular apartments in recent years and the design standardization standard (draft) is now prepared to be notified as a result of the steady research. Furthermore, pilot complexes for demonstration purpose are under construction, starting from public rental apartments. Thus, MC method-applied public rental houses will be spread in near future. This study aims to investigate the current design status in the Ga-Yang Housing as a pilot modular complex to produce and supply more economical and efficient modular houses, and analyze the problems by comparing the design standardization standards with pre-notified design standardization standards and summarize the modifications between them thereby presenting foundational data for establishment of the design standardization in the modular business industry.

Status of Economics Analysis Using LCC in Turn-Key Project : Focus on Landscape Architecture (설계시공일괄발주(턴키) 설계에서 LCC를 활용한 경제성 분석 실태: 조경분야를 중심으로)

  • Yoon, Yong-Han;Kim, Jeong-Ho
    • Journal of Environmental Policy
    • /
    • v.10 no.4
    • /
    • pp.39-59
    • /
    • 2011
  • In this article, I would like to analyze the conditions in applying the LCC method for each construction type by selecting 10 apartment complexes among the Turn-key projects which have been ongoing for the last 5 years. In addition, this article will identify the problems to the application of double landscape architecture and suggest improvement measures. Among the 10 case targets, a total of 151 LCC analyses were conducted, and the average application ratio placing for each construction type was shown in the following order: architecture (34.4%)> electricity (21.2%)>machine (18.5%)>civil engineering (13.2%)>landscape architecture (12.6%). As numbers show, landscape architecture was the lowest. The ratio of LCC reduction amount was shown in the following order: machine (32.1%)> architecture (23.9%)>electricity (23.4%)>civil engineering (17.5%)>landscape architecture (3.1%). The field of landscape architecture had a reduction amount that was about 5 to 6 times lower than civil engineering which had a similar number of LCC analysis cases. The total LCC analysis items of landscape architecture was 19, including 15 double packing material, 1 building covering, 1 grass planting, 1 planting infrastructure, and 1 facility. The following measures were suggested to promote LCC analysis in landscape architecture: first, set an analysis item that considers the construction expense ratio of landscape architecture; second, legal regulation of landscape architecture and expansion of its application; third, prepare VE/LCC standards which are suitable for landscape architecture.

  • PDF

A Probabilistic Risk-based Cost Estimation Model for Initial-Stage Decision Making on Apartment Remolding Projects (공동주택 리모델링 초기 단계 의사결정을 위한 확률론적 리스크 기반 비용 예측 모델 개발)

  • Lee, Dong-gun;Cha, Heesung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.70-79
    • /
    • 2016
  • The current remodeling cost estimation process is not only dependent on the historical data of new building construction, but it also has a poor linkage with risk-based estimation approach. As such, there is a high risk of falling short of initial budget. To overcome this, a risk-based estimation approach is necessary by providing a probabilistic estimation in consideration of the potential risk factors in conducting the remodeling projects. In addition, the decision-making process should be linked with the risk-based estimation results in stead of intuitive and/or experience-based estimation. This study provides a probabilistic estimation process for residential remodeling projects by developing a detailed methodology in which a step-by-step approach can be achieved. The new proposed estimation approach can help in decision-making for remodeling projects in terms of whether to proceed or not, by effectively reflecting the potential risk factors in the early stage of the project. In addition, the study can enhance the reliability of the estimation results by developing a sustainable estimation process model where a risk-based evaluation can be accomplished by setting up the cost-risk relationship database structure.

A Study on the landscape change by Privately-invested Park of Long-term Non - executed Urban Parks by using accumulated viewshed analysis - (누적가시분석(Accumulated Viewshed Analysis)을 이용한 도시녹지 경관변화특성 연구 - 의정부시 장기 미집행 도시공원 내 아파트단지계획을 사례로 -)

  • Jeung, Yoon-Hee;Lee, Sang-Min;Yoon, Hee-Jea;Lee, Dong-Kun
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.21 no.2
    • /
    • pp.65-75
    • /
    • 2018
  • This study analyzes the characteristics of the urban landscape changes as a result of the introduction of private parks among the long-term uncollected urban planning facilities and enables the analysis of the characteristics of the urban landscape changes as a result of the introduction of private parks, and applied to the private park projects. The DSM with its building was established for the quantitative landscape analysis to examine the view ratio using the stacked visible analysis. The analysis showed that Jikdong Park had a high frequency of view from downtown to green due to its location, and that the development project of a private park on park and town boundaries significantly lowered the view ratio. This implies a large degree of damage to the landscape by development projects provided protection of the view as a natural landscape is of value. Chudong Park also saw its view ratio of views from downtown to the hills green area of Chudong Park was much lower than that of Jikdong Park. And it was confirmed that the ratio of view changes due to development projects was small compared to that of Jikdong Park. In other words, although Jikdong Park and Chu-dong Park were developed in a similar scale in terms of the ratio of views, they were subject to significant damage due to their location characteristics. It is also meaningful to note that the degree of change in the landscape resulting from development projects that could not be found in the assessment or review of the existing Landscape Impact. As private parks are introduced in the urban green belt, apartment development is being pushed for at the edge of the green belt. This study is meaningful in that it is derived based on the calculation that the survey results are derived based on the changes in the views on green areas that urban residents may experience as the private park project is carried out, and it should be introduced based on the calculation of the private parks.

Constructability Analysis in Aged-Housing Remodeling Demolition Work for Maximizing Waste Recycling (폐기물 재활용성 향상을 위한 리모델링 철거공사의 시공성 평가 및 사례적용)

  • Chae, Seong-Hyun;Kim, Ki-Hyun;Cha, Hee-Sung;Kim, Kyung-Rai;Han, Ju-Yeoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.13-22
    • /
    • 2010
  • From now on, the aged apartment or house is expected to increase rapidly. So, we have to build a process of remodeling and develop the new technique. Demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stability of building. Therefore, we need a step to develop a assessment system, verify and make specified. This paper evaluated how much improve on construction speed, work efficiency, intensity of work and influence with another process comparing the existing method with the new demolition method. The qualitative and quantitative assessment system are developed with these output. The case study was carried out experimental group and control group, based on developed assessment system, which have the same condition. The existing method was made up of 3 steps- 1)Demolish windows, doors and iron goods, 2)Demolish indoor and outdoor walls, 3)Drop the waste. The new demolition method was made up of 5 steps- 1)Demolish windows, doors and iron goods, 2)Demolish the ceiling and wall's finishing materials, 3)Demolish the floor's finishing materials, 4)Demolish indoor and outdoor walls, 5)Drop the waste. Work time, idle time, the character of a work unit are analyzed by mock-up test. This study's output is expected to establish a systematic process of new demolition method and based on the maximizing waste recycling work in our construction industry.

Productivity Analysis of Reinforced Concrete Works and Tower Crane Working Ratio for High-rise Apartment Buildings (초고층 공동주택 RC 공사의 생산성 및 타워크레인 가동율 분석)

  • Kwon, Jihun;Huh, Youngki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.1
    • /
    • pp.55-62
    • /
    • 2021
  • The productivity of rebar-work and form-work was analyzed with data collected from an actual high-rise construction project, and the actual utilization rates of three tower cranes were also investigated. It was found that the average productivity of the form-work increased from 12.00~8.71(㎡/man·day) in the underground and above-ground/lower-floor to 11.94~20.73(㎡/man·day) in the standard floor. Comparing the productivity of core area to outer, the former was found to be about 11% higher. Moreover, the rebar-work productivity of the outer area(1.12 ton/man·day) was approximately 9.6% higher than that of the core area for the standard floor. The average utilization rates of three TC were surveyed to be about 63.49%, and it was revealed that rainy weather(6.1%), strong winds(6.1%), holidays(17.8%), TC lifting work(5.8%), and other failures and repairs(0.07%) were the causes of non-operation. These research results are expected to be beneficial data in planning and managing the process of high-rise RC construction works in the future.

A Study on the Characteristics of Projects Following the Promotion of Private Park Special Projects (민간공원특례사업의 추진에 따른 사업특성에 관한 연구)

  • Gweon, Young-Dal;Park, Hyun-Bin;Kim, Dong-Pil
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.49 no.5
    • /
    • pp.112-124
    • /
    • 2021
  • This study was conducted to examine and analyze local governments, park status, project characteristics, and the implementation in detail for private park special projects across the country as a means of responding to the sunsetting of urban parks. As a result of the analysis, first, the private park special project, was found to be mainly implemented in cities with a population of more than 100,000, so there was a limit to the application on military installations or in local small cities. Therefore, rather than applying the special system collectively, it was judged that institutional flexibility, considering the characteristics and size of local government, was needed. Second, the current special projects by the park creation donation collection method shows monotonous development centered on apartment houses, so it is necessary to diversify the development by introducing a park preservation method that purchases and donates park sites. Third, it was found that the area standard needs to be eased to less than 50,000m2 to include parks with high utilization and good accessibility in urban areas of large cities, as the type and area of parks are limited. Fourth, most special projects are mountain parks, which are feared to damage the natural terrain and skyline, so separate ordinances should be established and applied, and development approaches should be made to allow nature and parks to coexist with the setting of detailed building guidelines for each type of facility. The guidelines should include, first, after the nationwide private park special projects are completed, standards for appropriate returns for similar projects should be established, institutional standards such as the recovery of excess profits should be established, and environmental reviews should be conducted. Second, it was found that local governments should institutionalize the composition of private consultations to promote the efficient management of projects through a cooperative system, and third, a roadmap for maintenance after the donation of special parks should be established.