• Title/Summary/Keyword: apartment building project

Search Result 137, Processing Time 0.028 seconds

A Study on a Rhabilitation Design, Decision Making and Housing Management Policies for Reuse of Deteriorated Apartments in Korea (노후아파트 재활용을 위한 건축디자인 의사결정 및 관리정책 연구)

  • Shon, Seung-Kwang;Cho, Hyung-Geun;Cho, Sun-Chul;Choi, Il
    • Journal of the Korean housing association
    • /
    • v.13 no.5
    • /
    • pp.77-88
    • /
    • 2002
  • This article deals the investigations how to solve the social deficiencies of deteriorate apartments, which is a half cycle of a building and it goes slum clearance and redevelopment. And this proposes an active remodeling and design strategy, management, and housing policies for extending the usage of the resource. Most of apartment housing in Korea is built by the panel wall and slab structure system fur economic price. To remake is possible, even though not designed in flexibility and variation. The remodeling strategies are dwelling unification, transformation of two units to one or three units, addition of a room, changing into commercial and community required spaces, and reshaping of a envelop and facade by addition of a dwelling or dwellings, roof floors, change of materials and colors, and so on. And, all activities in structural aspect are proposed removal in upper part and addition in lower part of an apartment housing. Active remodeling cost a great deal compare to new construction, so any remodeling activities should be based on a minimal interfere and budgets to enhancing the quality in existing building. The final aim of an active remodeling is to enhance the quality in economic values, and to keep original state and to put on the new one in a small part. To promote the active and careful management and rehabilitation, it is necessary to give the positive incentive in terms of architectural law, bank loan, and any redevelopment project should get the remodeling record in national resources.

A Study on the Effective Inventory Management by Optimizing Lot Size in Building Construction (건설공사의 적정 Lot Size 결정에 의한 효율적인 재고관리 방안에 관한 연구)

  • Kim, Sang-Hoon;Kim, Gwang-Hee;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.2
    • /
    • pp.73-80
    • /
    • 2004
  • The purpose of this study was to look up the proper inventory management system in construction industry. it is important for construction company to improve competitiveness and to reduce construction cost. Lot-sizing techniques were applied to rebar procurement in apartment project. The results of this study were as follows; the method of Groff's marginal cost showed the best performance of other techniques and the method of Norman showed a similar result.

A Study on Necessity of Applying of BIM for Maintenance of the Long-Life Housing (장수명 공동주택 유지관리를 위한 BIM 적용 필요성에 관한 연구)

  • Kwon, Dae-Geun;Shim, Un-Jun;Ahn, Yong-Sun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.108-109
    • /
    • 2013
  • To join in the global trend toward the green growth, the government has chosen the technical development of a long-life housing as a national project and has been working on it. However, a research on its maintenance has been insufficient. Therefore, in order to come up with and support the systematic maintenance of long-life housing, I suggest the need for application of BIM by comparing and analyzing an apartment house and a long-life housing.

  • PDF

Materials management using RFID in the apartment construction (RFID를 활용한 공동주택 건설공사 자재관리 방안 연구)

  • Park, So-Hyun;Song, Jeong-Hwa;Oh, Kun-Soo
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2008.04a
    • /
    • pp.251-255
    • /
    • 2008
  • Nowadays the scale of domestic construction becomes large, sophisticated and specialized. It has led to a growing need for the high quality, cost reduction, safety and reduction of work duration. Therefore the importance of construction materials management is emphasized to perform the project successfully. It becomes an current issue about method of construction material management according to the flow of construction progress in the construction field. Therefore, various researches using RFID for efficiency of construction material are being studied. We analyzed the case study using RFID, drew the problems through the investigation of status about the management of material in the field, and then suggested the method of material management using in the apartment building construction field.

  • PDF

AN EVALUATION OF ENERGY PERFORMANCE IN SUPER HIGH-RISE APARTMENT HOUSING WITH EXTERIOR WINDOW TYPES

  • Sang-Ho Lee;Yong-Ho Park;Jong-Chan Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1637-1642
    • /
    • 2009
  • This study evaluates the energy performance of super high-rise residential buildings with e-QUEST simulation and calculates the annual cooling and heating load. The result of this study have concluded that the most influential factor is the characteristics of the window and also suggest the most efficient window system from the result of calculation of different glasses' cooling and heating load. The result of this study shows that The most efficient method to enhance the energy performance is to use low reflective 3 pairs Low-E glass and Low-E coating(inside of outer glass) pair glass.

  • PDF

A Study on the Time-Sectional Analysis of Apartment Housing related research in Korea (국내 아파트 관련 연구의 연구주제 시계열 분석)

  • Kim, Tae-Sok;Park, Jong-Mo;Park, Eu-Gene;Han, Dong-Suk
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.3
    • /
    • pp.45-52
    • /
    • 2018
  • Currently, apartments have become an important research subject for the overall area of politics, economics, and culture as well as urban architectural study. However, there are few analyses of the research trends related to the current interest in the apartment research and prediction of the future changes of an apartment in politics and industry. In this study, the research information related to the apartment has classified, and the changes in the research trends have analyzed. Based on the classified data, the first thesis and dissertation related to the apartment and changes of academic notation have discovered. In addition, future interests and future research directions through Frequency of Appearance, Degree Centrality Analysis, and Betweenness Centrality Analysis of author keywords were predicted. As a result of the analysis, 'Space,' 'Residential Mobility' and 'Apartment Complex' studies were found to be important research topics throughout the entire period. 'Han Gang Apartment,' 'Small Size Apartment,' 'Civic Apartments,' 'Jamsil,' and 'Child' were newly interested topics until 70's era. '(Super) High-rise Apartment,' 'Perception,' 'Jugong Apartment,' 'Housing Environment,' 'Housewife,' 'Apartment Layout,' and 'Busan' were newly interested topics during the 80's and 90's era. 'Apartment Price,' 'Energy,' 'Remodeling,' 'Noise,' 'Resident Satisfaction,' 'Community,' and 'Apartment Lotting-out' were newly interested topics after the year 2000. New concerns for last decade are found to be 'Super High-rise Apartment', 'Remodeling', 'Indoor'(2007), 'Apartment Reconstruction Project', 'Brand', 'AHP', 'Housing Environment'(2008), 'Ventilation'(2009), 'Apartment Lotting-out'(2010), 'Economic Assessment'(2011), 'Cost'(2012), 'Green Building', 'Apartment Sales', 'Law', 'Society'(2013), 'Floor Impact Noise', 'Seoul'(2014), 'Noise'(2015), 'Hedonic Model'(2016). In addition, following research topics are expected to be active in the future: In maturity stage of the research development is going to be 'Apartment Price', 'Space', 'Management of Apartment Housing'; the hedonic model, which is research growth and development stage, is going to be '(Floor Impact) Noise', 'Community', 'Energy.

Analysis of Importance by Defect Type in Apartment Construction (공동주택 건축공사 하자유형별 중요도 분석)

  • Kim, Do-Hyung;Lee, Dongyoun;Lee, Hak-Ju;Min, Yoon-Gi;Park, Insung;Cho, Hunhee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.4
    • /
    • pp.357-365
    • /
    • 2020
  • While numbers of apartment housing are continually rising in the domestic housing construction industry, apartment contractors are currently developing plane models, upgrading facilities, and relevant technology, and investing much efforts to meet the higher demands of consumers. However, the construction process of apartment housing involves the intricate properties of the construction industry such as materials, workforce, equipment, weather, and unpredictable situations. If any of these factors becomes discordant and results in interference and interruption of the construction process, then defects, both functional and aesthetic, are likely to occur due to errors in the plan of industry organizers and constructors. Therefore, this research identifies the types of defects in an apartment construction project and analyzes their relative importance. Firstly, this research reviews the previous research trends and will reduce the needs of this research. Afterward, defect repair costs corresponding to the different defect types are calculated by applying results of the research and performing frequency analysis on defect types included in 'Tenant preliminary research' on apartments constructed by Company A. As a result of analyzing the importance of defect type, the top six activities, including tile, floor, paper hanging, PL window, cabinetry, and kitchen cabinet, are found to be of high importance, and the top six activities in question need of repair and management of defects first. The results of this study will help establish a plan to initially respond to such problems as refusal to move in and filing a defect suit against delay in repairing defects.

A Process for Replacing BIM Property Information about Internal Finishing of Office Building in Design Phase (업무시설 설계단계 BIM 내부마감 속성정보 교체 프로세스)

  • Han, Ji-Ho;Nam, Dong-Hee;Park, Sang-Hun;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.207-208
    • /
    • 2023
  • The procedure of predicting the construction cost and selecting the best alternative is performed based on comparative review of each building case. In the case of office building, it is required continuously until design is complete, since the owner requirements are various and likely to change during the design process compared to a standardized apartment. However, since the comparison work for each alternative in practice uses only the unit construction cost, there is no correlation between the alternative and the final result, and it is difficult to quantitatively determine the effect of the determined design factor on the total construction cost. It is needed that a means to support the generation of design alternatives using similar building cases during the design phase. This paper proposes a BIM-based data replacing process to support creating and comparison of design alternatives of internal finishing for office building. When design alternatives are created through the proposed process, it is possible to compare several similar cases with current project under equivalent design circumstance. Because only some finishing properties are replaced while maintaining the shape information such as the length, height, and base constraint of the object to be replaced.

  • PDF

A Case Study on BIM-enabled Evaluation of Design Alternatives for an Actual Remodeling Project in Korea - Focusing on the Spatial Program Review in Early Phase of Design -

  • Kim, Hyunjung;Lee, Jin-Kook
    • Korean Institute of Interior Design Journal
    • /
    • v.24 no.5
    • /
    • pp.117-127
    • /
    • 2015
  • This paper depicts a case study of the BIM (Building Information Modeling)-enabled evaluation of design alternatives for an actual remodeling project in Yeongwol, Korea. The increase of urban population and income followed by the growth of economy has derived massive supply of grand scale housing project in Korea since 1970s. Consequently, building remodeling became one of the feasible resolutions for renovating such old housings in these days. This paper aims to introduce a technical approach to such remodeling projects based on BIM-enabled applications focusing on quantitative analysis of design alternatives. Among the technical issues of such building remodeling projects, this paper focuses on the BIM-enabled area analysis and comparison between design alternatives to support decision-making even in early phase of remodeling design process. BIM and its variety of applications have broadly influenced the domain of AEC-FM (Architecture, Engineering, Construction, and Facility Management) within the lifecycle of buildings. As one of the applications facilitated by BIM, the automated area calculation and scenario-based comparison between alternatives can play an important role in the early phase of remodeling project. We modeled three design alternatives (buildings) and three housing modules (units) based on the actual case in Yeongwol city, Korea using a BIM design authoring tool. Nine combinatorial BIM models were demonstrated for the BIM-enabled review process described in this paper. To determine the most optimal design scenario among nine alternatives, this paper demonstrates a result of the conducted spatial program review. The main subject includes specific spatial program issues on; 1) the number of unit spaces; and 2) area of individual/grouped and private/shared spaces.

Analysis Methodology for Feasibility Study of Remodeling of Aged Apartment by Comparative Analysis of Price Influencing Factors (가격 영향요인 비교분석을 통한 노후 공동주택 맞춤형 리모델링의 사업성 분석 방법론 제안)

  • Bae, Byungyun;Kim, Kyungrai;Shin, Dongwoo;Cha, Heesung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.6
    • /
    • pp.47-56
    • /
    • 2017
  • As of 2017, there are 848 million households living in apartment and 55.87% of Aged apartments over 15 years old. The allowable standard for remodeling the apartment is more than 15 years and the market for remodeling the apartment will continue to increase. For the success of the remodeling project feasibility analysis is important but the existing feasibility analysis of new construction and reconstruction is being used for remodeling feasibility analysis. Therefore, it is necessary to study the feasibility analysis of customized remodeling without increasing the number of households according to the building law. Purpose of this paper is to develop a feasibility analysis methodology for customized remodeling projects by deriving the factors affecting the formation of land prices and building prices in apartment. According to the concept of price formation of the apartment, the analysis method of the customized remodeling of the old apartment using the factors affecting the Land Price Indexes, Officially Assessed Individual Land Price, House Price Indexes, and Officially Assessed Individual House Price was suggested. The Stair Price Algorithm developed in this research can be utilized at the stage of selecting remodeling contractors after the remodeling housing association is established.