Suggestion of Optimum PHC Pile for 15~40 Story Shear Wall Type Apartment Building (벽식공동주택의 층수변화에 따른 최적 PHC말뚝 제안)

  • Lee, Bum-Sik;Park, Jong-Bae;Park, Yong-Boo;Kim, Sang-Yeon;Ha, Young-Bae;Choi, Geong-Ryun
    • Land and Housing Review
    • /
    • v.3 no.2
    • /
    • pp.177-185
    • /
    • 2012
  • LH applies a uniformly standardized PHC Pile to 15~25 stories of Shear-wall type Apartment Building. Recently it is predicted that LH will construct over 30~40 story Apartment Building to keep varied project condition and faces urgent needs to save construction cost for improving its competitiveness. Therefore, structural analysis and design on the upper part and foundation of apartment building were carried out in this study by subdividing story of apartment building, e.g. 15, 20, 25, 30, 35, 40 stories. Reflecting the result of basement analysis and design, the economic evaluations are performed and the optimum diameters of PHC piles are suggested. The result of this paper is considered to be applied usefully for foundation design of LH apartment housing, and the suggested PHC Piles can be used effectively by increasing efficiency and saving the construction cost of foundation.

Defect Classification and Management System Using CBR technique Based Internet in Apartment Housing Project (인터넷기반 공동주택 하자분류 및 관리 시스템 구축에 사례기반 추론기법을 활용한 연구)

  • Kim, Gwang-Hee;Shin, Han-Woo;Seo, Deok-Seok;Yoon, Jie-Eon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.1
    • /
    • pp.63-70
    • /
    • 2008
  • Management process of apartment buildings construction has increased because the after service of construction company meet the needs of customers. Many defect data, which was inspected by construction company or customers before moving into a new apartment house, were classified by field engineers and then communicated to corresponding subcontractors. The classification process needs to be performed by an expert engineer because there is so much data, it is unfeasible to complete in a short period of time. For this classification process, an automatic classification system using case base reasoning (CBR) should be considered. This research proposed a defect management system with automatic classification system using CBR. This constructed defect management system consists of cyber after service system for tenants and the whole defect management process of construction, preservation and management of apartment buildings. This system could improve the efficiency of expert work in terms of time and accuracy, as well as helping laymen users to conduct defect classification work as experts do.

Basic Research for Causal Analysis of a Low-rate of G-SEED Certified Apartment Buildings

  • Kim, JungHwa;Lee, Hyun-Soo;Park, Moonseo;Lee, Seulbi
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.728-729
    • /
    • 2015
  • As environmental issues have been increased globally, eco-friendliness in the construction area, which accounts for more than 30% of total GHG gas emission has being urged. In response, the Korean government has implemented G-SEED(Green Standard for Energy and Environmental Design) certification from 2002. However, total number of certified apartment buildings is only around 1% of total number of approved apartment buildings. As a basic research to find out reasons of low rate of the certification, this paper analyzes consumers' decision-making process in G-SEED certified apartment building market comparing to non G-SEED certified one and draw System Dynamics modeling based on causal relationship. As a result, consumers' demand for the certified one is increased by 'Perceived Relative Utility' which is resulted from comparison process with non-certified one. The 'Perceived Relative Utility' is ascended upward steadily by 'Relative Perceived Price' considered as relatively short-term effect and 'Favorable Image of Certified Housing' referred to long-term effect.

  • PDF

Development of Prediction Model of Subcontract's Bidding-Ratio for Private Apartment Projects (민간 공동주택 하도급 낙찰률 예측모델 개발)

  • Jang, Ki-Suk;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.250-251
    • /
    • 2021
  • A subcontract work order is the basis of the construction process and consists of the root and trunk of the construction industry. The construction process through a subcontract work order is an important element of project success, and it is the basic unit of creating profit in the construction industry. Therefore, correct analysis and forecasting of subcontract work orders allow correct estimation of construction cost and profit which is the foundation of corporate decision making. This study has started to provide predictions of subcontractor's bidding-ratio for decision-making. Since the actual project data has been used in this study, the contribution level of the model is highly expected in actual field. The statistical confidential level of adjusted decision coefficient is concluded low because of limited sample numbers. However, its accuracy and confidence level can be increased through increasing sample numbers, considering more variables, and studying of reducing error.

  • PDF

Case Studies: Schedule Delay Factors and Delay Prevention Program for Concrete Frame Works in Apartment Construction Project (사례분석을 통한 아파트 골조공사의 공기지연 요인 도출 및 개선방안)

  • Cho, Tae-Jea;Choi, Jong-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.1
    • /
    • pp.9-17
    • /
    • 2011
  • Project delay is one of the most crucial impact factors in the construction process from a schedule and cost management perspective. This study focused on analyzing the causes of concrete frame work delay in the apartment construction project. According to the analysis of project cost composition, the direct cost of concrete works was highest in most samples. Actual delays of concrete works were analyzed for the six different construction components. Causes of delay were grouped into two categories; preconstruction and construction phases and these two groups were further divided into sub-groups. Analysis results revealed that the most significant delay was occurred in the 1st. floor concrete skeleton work. For each delay factor, implications of delay as well as suggestion(s) for reducing the possibility of schedule delay are provided.

A Web-based Long-Term Repair Planning System for Apartment House (웹 기반의 공동주택 장기수선계획 시스템)

  • La Hyo-Shin;Kim Tae-Hee;Han Choong-Hee;Kim Sun-kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.495-500
    • /
    • 2001
  • After the completion of an apartment housing project, deterioration of building materials will commence over time. Building maintenance consists of short-time and long-term repair projects. A long-term repair plan for organized maintenance management should be developed and implemented to maintain the longevity of the building. When forming such a plan, one should carefully predict when each part of the building will need repairs and how often subsequent repairs of each part will occur. The plan should be based on these predictions. Many apartment buildings in Korea have poor long-term maintenance management plans. This is because many of these plans are developed as mere legal formalities rather than as serious attempts to maintain the longevity of buildings. In this study, the materials used in the construction of each part of an apartment building we selected are taken into account to predict when the repairs will be required and how frequently subsequent repairs will be required. Furthermore, We suggest a long-term maintenance management plan for elongation so that apartment house managers can use to periodically check, diagnose, and replace old or malfunctioning parts using a web-based maintenance calender.

  • PDF

Study of Construction Costs in South and North Korea: Focusing on Construction Cost in Ryomyong Street Project, Pyongyang (남북 건축공사비 연구: 평양 려명거리 사업 건설조립액을 중심으로)

  • Kim, Jang-Han
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.4
    • /
    • pp.371-378
    • /
    • 2022
  • The Ryomyong Street project is the only construction project for which the construction cost is known, but its scale cannot be estimated because it is marked in North Korean Won. In this paper, the construction cost per m2 of North Korean apartment building construction was calculated based on the construction and assembly amount of the Ryomyong Street project. 160 to 1 was calculated as the ratio of the building construction cost per m2 between South and North Korea based on the Ryomyong Street project in Pyongyang and Seoul Housing & Communities Corporation. This ratio can be used to assume the construction size presented in North Korean won as there is no official exchange rate between the two Koreas.

Preferences of Mixed Types in a Social Mix Apartment Community and It's Residents' Social Behavior - Focused on the first district in Eunpyeong New Town in Seoul - (사회적 혼합아파트 거주자의 혼합유형 선호특성과 사회적 행태 연구 -서울시 은평뉴타운을 대상으로-)

  • Lee, Hye-Jin;Lee, Yeun-Sook;Lee, Soo-Jin
    • KIEAE Journal
    • /
    • v.11 no.5
    • /
    • pp.69-77
    • /
    • 2011
  • In order to solve social exclusion and segregation phenomenon and to realize social integration, the necessity of social combination and consensus has been presented and existing conception about the public lease apartment confronts a turning point due to the diversification of apartment supply system. With this social background, Eunpyeong New Town Project implemented by Seoul Metropolitan Government is the first example that supplied diverse apartments for social integration. Survey was made upon the residents aged 20 and over and living in combination apartments, lease apartments and common apartments for private ownership in the Enpyeong New Town Apartment Complex in section 1 area, and the survey sheets filled up by the respondents were collected by personal visits or by using specified gathering spots. Summary of study results is as follows: Firstly, regarding the combination method, respondents preferred the irregular combination of lease apartment units and common apartment units in the same apartment building at the top, analyzing by survey groups marked that residents of common apartment with initial ownership responded not to choose combination apartment complex or combination apartment in future. Secondly, the living consciousness with neighbors revealed that respondents were generally satisfied without difference between the residents of lease apartment and common apartment. As the demand and policies for diverse lease apartments are increasing recently, Eunpyeong New Town Project aimed for positive social integration and consensus will be evaluated as model case for social combination apartment in future. And it is necessary to introduce the policies that consider the differences in consciousness and interest of the residents among the lease apartments and common apartments.

A Comparative Analysis of Status on the Selection and Evaluation of Field Manager in Apartment and Office Building Project (공동주택과 오피스 건설현장의 조직원선정 및 평가실태 비교분석)

  • Lee Jung-Yong;Kim Byeong-Lae;Son Chang-Baek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.290-293
    • /
    • 2003
  • The field organization management in construction industry is very important factor improvement and cost reduction. But, until now, evaluation methods on the existing field organization did not make ready and endeavor of organization betterment was insufficient in construction industry. The purpose of this study to provide basic data for reasonable selection and evaluation of the field manager through analyzing operation status of the existing field organization in apartment and office building project by interview and questionnaire on the 22 construction companies. This study presented optimal proposal on the selection and evalution of field manager for productivity improvement and cost reduction by means of efficient construction progress in apartment and dffice building project.

  • PDF

The Current State and Application of project Financing followed by Sale after Building System of the Apartment (공동주택 후분양 전환에 따른 프로젝트 금융의 현황 및 활용방안)

  • Lee Sung-Rock;Moon Hwi-Young;Lee Soo-Yong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.218-225
    • /
    • 2004
  • The supply for the apartment complex in Korea has been accomplished by the sale before building system as a way of institutional means to support massive housing supply in the past. Although this sale before building system has helped the provision of the housing, the necessity of that has been weakened in the current housing market. As this market is changed to emphasize on consumer, the necessity of conversion to sale after building system was raised and finally enforced partially. However, the sale after building system has difficulty in ensuring construction fund and the safety of housing business. So, the diversification in the style of business structure we and the strategy for the activation of construction fund will solve these problems. Consequently, this essay examine the change and influence in the construction fund after adopting sale after building system and suggest the appropriate strategy in project financing for providing fund and reducing the risk in construction business.