• Title/Summary/Keyword: and delay

Search Result 12,818, Processing Time 0.04 seconds

Reasons for Patient's Delay in Diagnosis of Breast Carcinoma in Pakistan

  • Memon, Zahid Ali;Shaikh, Anum Nizamuddin;Rizwan, Sundus;Sardar, Maimoona Batool
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.14 no.12
    • /
    • pp.7409-7414
    • /
    • 2013
  • Background: Delay in diagnosis of breast cancer is associated with a poorer survival and a pivotal contribution to this delayed diagnosis comes from patient delay in presenting at a clinic. Reasons involved must be evaluated in order to decrease this reducible delay. Objectives: i) To evaluate the reasons for patient delay in diagnosis of breast cancer; ii) to investigate any association with other variables. Materials and Methods: A 6 month cross sectional study (from July 2012 to Dec 2012), was carried out in Surgical and Oncology Units of Civil Hospital, Karachi. A total of 100 females diagnosed with breast cancer of any histological type were interviewed after informed consent and relevant data were collected. Due ethical clearance was obtained. Results: Mean age was $47.5{\pm}12.1$ years with a range from 25-77 years. Mean duration of delay was $5.13{\pm}4.8$ months, from shortest 1 month to longest 36 months. Duration of delay was observed to be no delay (<1 month) in 28%, short delay (1-3 months) in 30% and long delay (>3 months) in 42% of patients. Considering the symptoms as "harmless" (39%) was the most frequent reason of delay followed by "temporary" (20%) and the "use of traditional methods" (12%). Most common reason for later approaches was an increase in the size of the lump (41%). Statistically significant association (p-value <0.05) of longer patient delay was obtained with being single, being illiterate, painless breast lump as the first symptom, negative family history of breast cancer and vague attribution of the symptoms. Conclusions: Significant delay in approach to health care facility was observed in our study due to variable reasons given by women. Sufficient awareness regarding breast cancer, its symptoms and favorable effects of a timely diagnosis on prognosis must be imparted to our general population.

Stability Analysis of Time Delay Controller for General Plants (일반적인 플랜트에 대한 시간지연을 이용한 제어기법의 안정성 해석)

  • Kwon, Oh-Seok;Chang, Pyung-Hun;Jung, Je-Hyung
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.26 no.6
    • /
    • pp.1035-1046
    • /
    • 2002
  • Time Delay Control(TDC) is a robust nonlinear control scheme using Time Delay Estimation(TDE) and also has a simple structure. To apply TDC to a real system, we must design Time Delay Controller to guarantee stability. The earlier research stated sufficient stability condition of TDC for general plants. In that research, it was assumed that time delay is infinitely small. But, it is impossible to implement infinitely small time delay in a real system. So, in this research we propose a new sufficient stability condition of TDC for general plants with finite time delay. And the simulation results indicate that the previous sufficient stability condition does not work even for small time delay, while our proposed condition works well.

An Efficient Delay Calculation Tool for Timing Analysis (타이밍 분석을 위한 효율적인 시간 지연 계산 도구)

  • Kim, Joon-Hee;Kim, Boo-Sung;Kal, Won-Koang;Maeng, Tae-Ho;Baek, Jong-Humn;Kim, Seok-Yoon
    • Proceedings of the KIEE Conference
    • /
    • 1998.11b
    • /
    • pp.612-614
    • /
    • 1998
  • As chip feature size decrease, interconnect delay gains more importance. A accurate timing analysis required to estimate interconnect delay as well as cell delay. In this paper, we present a timing-level delay calculation tool of which the accuracy is bounded within 10% of SPICE results. This delay calculation tool generates delay values in SDF(Standard Delay Format) for parasitic data extracted in SPEF(Standard Parasitic Exchange Format). The efficiency of the tool is easily seen because it uses AWE(Asymptotic Waveform Evaluation) algorithm for interconnect delay calculation, and precharacterized library and effective capacitance model for cell delay calculation.

  • PDF

A Pilot Study on Factors Associated with Presentation Delay in Patients Affected with Head and Neck Cancers

  • Baishya, Nizara;Das, Ashok Kumar;Krishnatreya, Manigreeva;Das, Anupam;Das, Kishore;Kataki, Amal Chandra;Nandy, Pintu
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.16 no.11
    • /
    • pp.4715-4718
    • /
    • 2015
  • Background: Patient delay can contribute to a poor outcome in the management of head and neck cancers (HNC). The main objective of the present study was to investigate the factors associated with patient delay in our population. Materials and Methods: Patients with cancers of the head and neck attending a regional cancer center of North East India were consecutively interviewed during the period from June 2014 to November 2014. The participation of patients was voluntary. The questionnaire included information on age, gender, residential status, educational qualification, monthly family income, any family history of cancer, and history of prior awareness on cancer from television (TV) program and awareness program. Results: Of 311 (n) patients, with an age range of 14-88 years (mean 55.4 years), 81.7% were males and 18.3% females (M:F=4.4). The overall median delay was 90 days (range=7 days-365 days), in illiterate patients the median delay was 90 days and 60 days in literate patients (P=0.002), the median delay in patients who had watched cancer awareness program on TV was 60 days and in patients who were unaware about cancer information from TV program had a median delay of 90 days (p=0.00021) and delay of <10 weeks was seen in 139 (44.6%) patients, a delay of 10-20 weeks in 98 (31.5%) patients, and a delay of 20-30 weeks in 63 (20.2%) patients. Conclusions: Education and awareness had a significant impact in reduction of median patient delay in our HNC cases.

Delay Time Estimation in Frequency Selective Fading Channels

  • Lee Kwan-Houng;Song Woo-Young
    • Journal of information and communication convergence engineering
    • /
    • v.3 no.3
    • /
    • pp.119-121
    • /
    • 2005
  • This paper aims to estimate the delay time of multiple signals in a multi-path environment. It also seeks to carry out a comparative analysis with the existing delay time under the proposed algorithm to develop a new algorithm that applies the space average method in a MUSIC algorithm. Unlike the existing delay time estimation algorithm, the developed algorithm was able to estimate the delay time in 5ns low. Therefore, the algorithm proposed in this paper improved the existing delay time estimated algorithm.

Loop transfer recovery design for input-delayed systems (입력 시간지연 시스템의 루우프 전달복구 설계 기법)

  • 박상현;이상정
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1996.10b
    • /
    • pp.1201-1204
    • /
    • 1996
  • The previous results on LTR methods for time delay systems need the solution of the operator-type Riccati equation. In addition, it can be difficult to make the target loop shape representing the design specification. This paper proposes a new LTR method for input-delayed systems using well-established LTR method for non-delay systems. For doing this, a time delay margin is derived and the time delay of the input-delayed systems is assumed less than equal to the time delay margin. A simple example is presented for illustrations.

  • PDF

Periodic Properties of a Lyapunov Functional of State Delay Systems

  • Young Soo Suh
    • KIEE International Transaction on Systems and Control
    • /
    • v.2D no.2
    • /
    • pp.92-96
    • /
    • 2002
  • This paper is concerned with properties of a Lyapunov functional of state delay systems. It is shown that if a state delay system has a pure imaginary pole for some state delay, then no Lyapunov functional satisfying a Lyapunov condition exists periodically with respect to change of the state delay. This periodic property is unique in state delay systems and has been well known in the frequency domain stability conditions. However, in the time domain stability conditions using a Lyapunov functional, the periodic property is not known explicitly.

  • PDF

THE ROOT CAUSE ANALYSIS PROCESS FOR SCHEDULE DELAY IN CONSTRUCTION (건설공사의 작업지연 원인분석 프로세스)

  • Ji, Kun-Chang;Kim, Chang-Duk;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.138-148
    • /
    • 2006
  • In constructing projects, there exist various kinds of work interferences, which cause a delay of the outset and completion of planned schedule because of some attributions, such as variability, uncertainty and complexity, and so schedule delay has been treated as a natural phenomenon. To reduce or prevent the schedule delay, a constant confirmation of schedule delay and a preparation of counter plans for finding out the cause structure of schedule delay should have been done. However, all this time the research has been mostly done on the calculation method or claim cases of schedule delay, and the range of analysis method of the cause structure of schedule delay has been multifarious from industrial views to views of specific work. Moreover, the classifying system and analysis method did not consider the trait, which cause the schedule delay, in constructing projects. For this reason, it is difficult to compare the cause of delay factors of the projects and to understand the effect of schedule delay by each factor. This paper restricts the range of the cause analysis of schedule delay to the field of site management in the projects and divides the cause structure of schedule delay into the cause objects and cause attributes of schedule delay according to the input elements. The system of classifying causes of schedule delay is examined by interviews with experts and questionnaire. Additionally, this paper analyzes the attributes of cause attributes and cause subjects and presents the analysis method and procedure of schedule delay with the application of VSM.

Case Studies: Schedule Delay Factors and Delay Prevention Program for Concrete Frame Works in Apartment Construction Project (사례분석을 통한 아파트 골조공사의 공기지연 요인 도출 및 개선방안)

  • Cho, Tae-Jea;Choi, Jong-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.1
    • /
    • pp.9-17
    • /
    • 2011
  • Project delay is one of the most crucial impact factors in the construction process from a schedule and cost management perspective. This study focused on analyzing the causes of concrete frame work delay in the apartment construction project. According to the analysis of project cost composition, the direct cost of concrete works was highest in most samples. Actual delays of concrete works were analyzed for the six different construction components. Causes of delay were grouped into two categories; preconstruction and construction phases and these two groups were further divided into sub-groups. Analysis results revealed that the most significant delay was occurred in the 1st. floor concrete skeleton work. For each delay factor, implications of delay as well as suggestion(s) for reducing the possibility of schedule delay are provided.

Development of Coordinated Scheduling Algorithm and End-to-end Delay Analysis for CAN-based Distributed Control Systems (CAN기반 분산 제어시스템의 종단 간 지연시간 분석과 협조 스케줄링 알고리즘 개발)

  • 이희배;김홍열;김대원
    • The Transactions of the Korean Institute of Electrical Engineers D
    • /
    • v.53 no.7
    • /
    • pp.501-508
    • /
    • 2004
  • In this paper, a coordinated scheduling algorithm is proposed to reduce end-to-end delay in distributed control of systems. For the algorithm, the analysis of practical end-to-end delay in the worst case is performed priory with considering implementation of the systems. The end-to-end delay is composed of the delay caused by multi-task scheduling of operating systems, the delay caused by network communications, and the delay caused by asynchronous timing between operating systems and network communications. Through some simulation tests based on CAN(Controller Area Network), the proposed worst case end-to-end delay analysis is validated. Through the simulation tests, it is also shown that a real-time distributed control system designed to existing worst case delay cannot guarantee end-to-end time constraints. With the analysis, a coordinated scheduling algorithm is proposed here. The coordinated scheduling algorithm is focused on the reduction of the delay caused by asynchronous timing between operating systems and network communications. Online deadline assignment strategy is proposed for the scheduling. The performance enhancement of the distributed control systems by the scheduling algorithm is shown through simulation tests.