• Title/Summary/Keyword: alternative resource

Search Result 614, Processing Time 0.033 seconds

Social Capital for the Baby Boomer Generation in the Future -Focused on Cohort Characteristics of the Baby Boomer Generation- (베이비붐 세대를 위한 미래 사회적 자본 -베이비붐 세대의 집단적 특성을 중심으로-)

  • Cha, Sung-Lan
    • Journal of Family Resource Management and Policy Review
    • /
    • v.16 no.1
    • /
    • pp.67-83
    • /
    • 2012
  • Baby boomers are often defined by their support of their parents and their devotion to their children's educational success by providing financial and emotional aids. Now, 7.12 million baby boomers in South Korea are retiring, or are about to retire, without any retirement plans. Similar to financial stability, health, and leisure life, social capital is another important element in the quality life after retirement. This is because social capital can function as a potential resource network. Social capital is a source that provides money, information, goods, services, emotional aids, social relational opportunities etc. In the past, family and community provided social capital for the aged. However, the baby boomer generation cannot expect the same. The baby boomers have the task of creating new social capital that can assure their quality of life. Therefore, this study examines cohort characteristics of the baby boomer generation and, based on the examination, seeks an alternative for social capital. The results are as follows: First, social capital from the local community can be an alternative source of caring for the baby boomers in old age. Second, among the social capital of the local community, elderly care supported by a family friendly community is proposed. In addition, baby boomers must become the primary social capital that contributes to a mature civil society rather than a beneficiary of welfare for the aged.

  • PDF

A Study on the Correlation between Heavy Metal Content of Cement Products and Waste Used in Cement Industry (시멘트 산업에 투입되는 폐기물과 시멘트 제품의 중금속 함유량과의 상관관계 분석연구)

  • Kim, Yong-Jun;Um, Nam-Il;Kim, Woo-Il;Lee, Young-Kee;Kim, Ki-Heon
    • Journal of Korea Society of Waste Management
    • /
    • v.35 no.8
    • /
    • pp.721-730
    • /
    • 2018
  • We investigated the effects of heavy metals in cement in the last 3 years and the amount of waste in the cement manufacturing process. The result shows that the average $Cr^{6+}$ content in cement products is controlled at 10 mg/kg. Cu and Pb have lower detection tendency in white cement than in ordinary portland cement. In addition, heavy metals such as Cd show a certain level of detection regardless of the input wastes. Copper slag and phosphate gypsum are the main influencing factors on the heavy metals in cement products. In auxiliary fuels, plastics waste and wood waste are considered to affect heavy metals in cement products. Alternative raw materials are considered to be affected by the alternative raw materials managed as byproducts. In the case of supplementary fuels, auxiliary fuels managed as waste instead of auxiliary fuels managed as byproducts affect the heavy metals in cement. This study examined the input amount without considering the heavy metals in each waste. Therefore, the result may vary in different situations, and further research must be conducted to supplement the findings. However, if the heavy-metal contents in the waste are constant, it can be used as a reference material for the control of heavy metals in cement products.

Multi-Slice Joint Task Offloading and Resource Allocation Scheme for Massive MIMO Enabled Network

  • Yin Ren;Aihuang Guo;Chunlin Song
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.17 no.3
    • /
    • pp.794-815
    • /
    • 2023
  • The rapid development of mobile communication not only has made the industry gradually diversified, but also has enhanced the service quality requirements of users. In this regard, it is imperative to consider jointly network slicing and mobile edge computing. The former mainly ensures the requirements of varied vertical services preferably, and the latter solves the conflict between the user's own energy and harsh latency. At present, the integration of the two faces many challenges and need to carry out at different levels. The main target of the paper is to minimize the energy consumption of the system, and introduce a multi-slice joint task offloading and resource allocation scheme for massive multiple input multiple output enabled heterogeneous networks. The problem is formulated by collaborative optimizing offloading ratios, user association, transmission power and resource slicing, while being limited by the dissimilar latency and rate of multi-slice. To solve it, assign the optimal problem to two sub-problems of offloading decision and resource allocation, then solve them separately by exploiting the alternative optimization technique and Karush-Kuhn-Tucker conditions. Finally, a novel slices task offloading and resource allocation algorithm is proposed to get the offloading and resource allocation strategies. Numerous simulation results manifest that the proposed scheme has certain feasibility and effectiveness, and its performance is better than the other baseline scheme.

Supply Chain Planning in Multiplant Network (다중플랜트 네트워크에서의 공급사슬계획)

  • Jeong Jae-Hyeok;Mun Chi-Ung;Kim Jong-Su
    • Proceedings of the Society of Korea Industrial and System Engineering Conference
    • /
    • 2002.05a
    • /
    • pp.203-208
    • /
    • 2002
  • In case of the problems with multiple plants, alternative operation sequence, alternative machine, setup time, and transportation time between plants, we need a robust methodology for the integration of process planning and scheduling in supply chain. The objective of this model is to minimize the tardiness and to maximize the resource utilization. So, we propose a multi-objective model with limited-capacity constraint. To solve this model, we develope an efficient and flexible model using adaptive genetic algorithm(AGA), compared to traditional genetic algorithm(TGA)

  • PDF

Resources for assigning MeSH IDs to Japanese medical terms

  • Tateisi, Yuka
    • Genomics & Informatics
    • /
    • v.17 no.2
    • /
    • pp.16.1-16.4
    • /
    • 2019
  • Medical Subject Headings (MeSH), a medical thesaurus created by the National Library of Medicine (NLM), is a useful resource for natural language processing (NLP). In this article, the current status of the Japanese version of Medical Subject Headings (MeSH) is reviewed. Online investigation found that Japanese-English dictionaries, which assign MeSH information to applicable terms, but use them for NLP, were found to be difficult to access, due to license restrictions. Here, we investigate an open-source Japanese-English glossary as an alternative method for assigning MeSH IDs to Japanese terms, to obtain preliminary data for NLP proof-of-concept.

Estimating the Biological Growth Function of Korean Anchovy: A Maximum Entropy Approach (한국 연근해 멸치자원량 추정 - Maximum Entropy기법의 응용 -)

  • Kim, Gi Cheol;Kwon, Oh Sang
    • Environmental and Resource Economics Review
    • /
    • v.9 no.2
    • /
    • pp.285-309
    • /
    • 2000
  • One of the main issues in natural resource economics is estimating the amount of stock and the biological growth functions of renewable natural resources. Since the stock level is not directly observed the usual econometric approaches cannot be employed for this purpose. The maximum entropy approach has been suggested as a useful alternative to estimate the dynamic model of natural resource use. This study estimates the stock and the growth function of Korean anchovy using the data for yield and yield efforts. The results show that the current level of anchovy yield exceeds its maximum sustainable yield, which implies that the stock will decrease substantially over time.

  • PDF

Dynamic Decisions using Variable Neighborhood Search for Stochastic Resource-Constrained Project Scheduling Problem (확률적 자원제약 스케줄링 문제 해결을 위한 가변 이웃탐색 기반 동적 의사결정)

  • Yim, Dong Soon
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.43 no.1
    • /
    • pp.1-11
    • /
    • 2017
  • Stochastic resource-constrained project scheduling problem is an extension of resource-constrained project scheduling problem such that activity duration has stochastic nature. In real situation where activity duration is not known until the activity is finished, open-loop based static policies such as activity-based policy and priority-based policy will not well cope with duration variability. Then, a dynamic policy based on closed-loop decision making will be regarded as an alternative toward achievement of minimal makespan. In this study, a dynamic policy designed to select activities to start at each decision time point is illustrated. The performance of static and dynamic policies based on variable neighborhood search is evaluated under the discrete-event simulation environment. Experiments with J120 sets in PSPLIB and several probability distributions of activity duration show that the dynamic policy is superior to static policies. Even when the variability is high, the dynamic policy provides stable and good solutions.

A Study on the Performance Analysis of Process Model with Resource Constraints in Concurrent Engineering Environment (동시공학 환경에서 자원제약이 있는 프로세스 모델의 성능분석에 관한 연구)

  • 강동진;이상용;유왕진;정용식
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.22 no.51
    • /
    • pp.231-240
    • /
    • 1999
  • A major concern in Concurrent Engineering is the control and management of workload in a period of process. As a general rule, leveling the peak of workload in certain period is difficult because concurrent processing is comprised of various processes, including overlapping, paralleling looping and so on. Therefore, the workload management with resource constraints is so beneficial that effective methods to analyze design process are momentous. This study presents the Timed Petri Nets approach of precedence logic networks, and provides an alternative for users to analyze constraint processes to resolve conflicts of resources. Another approach to Continuous Time Markov Chain using Stochastic Petri Nets is also proposed. These approaches are expected to facilitate resolving resource constrained scheduling problems more systematically in Concurrent Engineering environment.

  • PDF

Butyric Acid Fermentation of Sodium Hydroxide Pretreated Rice Straw with Undefined Mixed Culture

  • Ai, Binling;Li, Jianzheng;Chi, Xue;Meng, Jia;Liu, Chong;Shi, En
    • Journal of Microbiology and Biotechnology
    • /
    • v.24 no.5
    • /
    • pp.629-638
    • /
    • 2014
  • This study describes an alternative mixed culture fermentation technology to anaerobically convert lignocellulosic biomass into butyric acid, a valuable product with wide application, without supplementary cellulolytic enzymes. Rice straw was soaked in 1% NaOH solution to increase digestibility. Among the tested pretreatment conditions, soaking rice straw at $50^{\circ}C$ for 72 h removed ~66% of the lignin, but retained ~84% of the cellulose and ~71% of the hemicellulose. By using an undefined cellulose-degrading butyrate-producing microbial community as butyric acid producer in batch fermentation, about 6 g/l of butyric acid was produced from the pretreated rice straw, which accounted for ~76% of the total volatile fatty acids. In the repeated-batch operation, the butyric acid production declined batch by batch, which was most possibly caused by the shift of microbial community structure monitored by denaturing gradient gel electrophoresis. In this study, batch operation was observed to be more suitable for butyric acid production.

A Design for the Symbol Park and the Waterfront Park for the Second Stage Development in the Eastern Rear Complex of Gwangyang Harbor (광양항 동측배후단지 2단계 사업지구 상징공원 및 수변공원 설계)

  • Hong Hyoung-Soon;Kim Do-Kyong;Jeong Han-Ho
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.34 no.3 s.116
    • /
    • pp.104-119
    • /
    • 2006
  • The eastern rear business complex of the Gwangyang Harbor (second stage) has undergone the 'alternative bid' process by which a construction company is selected based on their suggestions for an alternative plan and the bid for the construction expenses is based on the previously completed original plan, thereby implicitly accepting the arrangement and scale of the park which was presented in the original plan. It is possible, however, that the concept and plan of each park needs to be approached in a new way within the extent of given design guidelines. This study focuses on the alternative plan process and the Symbol Park (the second neighborhood park) and Waterfront Park (the third neighborhood park) among the five neighborhood parks in the eastern rear business complex (second stage). These two parks provide scale and function for the structure of the park and greenways system at the eastern rear complex. The neighboring waterway is a significant resource for emphasizing the pre-development features of the site. The alternative plan process focuses on determining the resources for the park's plan based on the environmental analyses of the site and utilizing the results. That is, through an analysis of the current state, all available resources are determined and the facilities and activities are derived based on these results. By this, Symbol Park and Waterfront Park reflect the regional features of the eastern rear complex, and these parks will feasibly perform the role of the region's key parte. The limit of this study is the fact that there is no chance for landscape architecture to actively play a role in the creation of the master plan, land utilization plan, and plan for the complex. Therefore there is a problem that the function scale and location of the park are not distributed appropriately in the rear complex. Also the plan for protecting the waterway's shore, a significant resource, only considers the structural stability of the engineering works, degrading the visual and ecological quality. These experiences will be used as a case for further designing the industrial complex and for the resulting park plan.