This paper investigates the development of failure surfaces induced by an embankment on soft marine clay deposits and the characteristics of such surfaces through numerical simulations and its comparative study with monitoring results. It is well known that the factor of safety of embankment slopes is closely related to the vertical loading, including the height of the embankment. That is, an increase in the embankment height reduces the factor of safety. However, few studies have examined the relationship between the lateral movement of soft soil beneath the embankment and the factor of safety. In addition, no study has investigated the distribution of the pore pressure coefficient B value along the failure surface. This paper conducts a continuum analysis using finite difference methods to characterize the development of failure surfaces during embankment construction on soft marine clay deposits. The results of the continuum analysis for failure surfaces, stress, displacement, and the factor of safety can be used for the management of embankment construction. In failure mechanism, it has been validated that a large shear displacement causes change of stress and pore pressure along the failure surface. In addition, the pore pressure coefficient B value decreases along the failure surface as the embankment height increases. This means that the rate of change in stress is higher than that in pore pressure.
This thesis has been researched on optimized design method for the total cross section of embankment considering the fact that the size of embankment cross section is directly related with economic efficiency when dam designing. In general, embankment cross section of fill dam is either determined by cohesion and angle of internal friction, a strength parameter of embankment materials or by permeability of embankment. Therefore the size of embankment cross section depending on strength parameter of embankment materials was determined by using MIDAS-GTS program through stress-seepage coupled analysis at the time of fill dam design. As a result, determination of embankment cross section was more affected by the size of central core and permeability rather than by slope stability by shear strength and it was revealed that in case of embankment height being over 20m, stability against infiltration and slope action could be secured only when embankment slope is at least over 1:2.5. In addition, it was also revealed that in case of making the size of central core exceeding specification standard, total cross section of embankment could be reduced considerably and at the time of embankment design, adequate size and appropriateness of embankment cross section could be determined with referring the table suggested by this study.
Fattah, Mohammed Y.;Zabar, Bushra S.;Hassan, Hanan A.
Structural Engineering and Mechanics
/
제56권4호
/
pp.507-534
/
2015
The present work investigates the behavior of the embankment models resting on soft soil reinforced with ordinary and stone columns encased with geogrid. Model tests were performed with different spacing distances between stone columns and two lengths to diameter ratios (L/d) of the stone columns, in addition to different embankment heights. A total number of 42 model tests were carried out on a soil with undrianed shear strength $${\sim_\sim}10kPa$$. The models consist of stone columns embankment at s/d equal to 2.5, 3 and 4 with L/d ratio equal 5 and 8. Three embankment heights; 200 mm, 250 mm and 300 mm were tested for both tests of ordinary (OSC) and geogrid encased stone columns (ESC). Three earth pressure cells were used to measure directly the vertical effective stress on column at the top of the middle stone column under the center line of embankment and on the edge stone column for all models while the third cell was placed at the base of embankment between two columns to measure the vertical effective stress in soft soil directly. The performance of stone columns embankments relies upon the ability of the granular embankment material to arch over the 'gaps' between the stone columns spacing. The results showed that the ratio of the embankment height to the clear spacing between columns (h/s-d) is a key parameter. It is found that (h/s-d)<1.2 and 1.4 for OSC and ESC, respectively; (h is the embankment height, s is the spacing between columns and d is the diameter of stone columns), no effect of arching is pronounced, the settlement at the surface of the embankment is very large, and the stress acting on the subsoil is virtually unmodified from the nominal overburden stress. When $(h/s-d){\geq}2.2$ for OSC and ESC respectively, full arching will occur and minimum stress on subsoil between stone columns will act, so the range of critical embankment height will be 1.2 (h/sd) to 2.2 (h/s-d) for both OSC and ESC models.
상주 공검지는 조성 이후 지속적으로 제방을 증축하며 현재에 이르렀다. 통일신라시대 1,220년 BP 경 제방을 처음 축조한 후 고려 초기인 980년 BP까지 거의 50년마다 네 번 증축하였다. 그 가운데 초기 두 번의 증축은 고도를 상대적으로 많이 높였으나, 이후 두 번은 약간 높이는 정도에 머물렀다. 제방 증축 후 시간이 지남에 따라 수심은 점차 얕아지고 부유성 규조보다 저서성과 부착성 규조 비율이 증가하며 수질이 나빠진다. 이것은 소유역의 식생파괴로 인하여 공검지로 유입하는 퇴적물이 증가한 결과이다. 약 980년 BP 년 이후 50 여 년 동안에는 강수량이 많아서 저수지 수위가 상승하였다.
수평흐름에 의한 제체내의 비정상침투류를 실험을 통하여 구명한 것으로 흐름의 속도와 수위의 변동에 따른 제체내에서의 침투류영향을 고려하므로써 하천제방의 안정성증대에 목적을 두었다. 실험은 투수계수가 서로 다른 3가지 모델($K_1=3.52{\times}10^{-1}cm/sec$, $K_2=1.94{\times}10^{-1}cm/sec$, $K_3=4.19{\times}10^{-2}cm/sec$)에 대하여, 각기 흐름의 속도를 60, 70, 80, 90 cm/sec로 변화시키고 동시에 수위를 상승 또는 하강시키는 방법으로 제체내에 발생하는 수위변화를 실험을 통하여 분석하였다. 분석결과 제체내의 침투현상은 제체의 투수계수가 크고, 흐름의 속도가 작을수록 유속의 변화에 따른 영향을 많이 받음을 알 수 있으며, 제외지 수위의 상승과 강하에 따른 배면부 및 표면부에서의 수위가 유속의 영향에 따라 변화함을 알 수 있다.
본 연구에서는 현재 실존하는 제방을 대상으로 제방겸용도로 건설에 따른 안정성의 변화를 살펴보기 위해 건설단계별로 도로건설을 위한 성토 후, 겸용도로 건설 후 도로를 주행하는 차량에 의한 교통하중이 재하될 경우로 구분하여 안정성 변화를 분석하였다. 연구결과 겸용도로 건설을 위한 성토 후와 교통하중(DB-24)을 적용하였을 경우 모두 일반적인 안전율 기준인 1.3을 상회하고 있어 겸용도로 건설에 따른 제방의 안전은 확보되는 것으로 분석되어 제방겸용도로의 건설은 부지 확보 비용 절감을 위해 건설이 가능할 것으로 판단된다. 그러나 겸용도로의 건설로 인해 제방의 안전율 감소 현상이 발생하기 때문에 안정성에 대한 사전 검토가 충분히 이루어져야 할 것이다. 특히 안전율 감소가 가장 큰 경우는 비정상류 상태의 수위상승의 경우로 분석되어 하천제방과 같이 수위변화가 빈번한 경우에는 비정상류 해석으로 설계하는 것이 바람직하며 제내지의 사면경사는 기존제방과 동일한 1:2의 경사를 유지하도록 설계하는 것이 필요할 것으로 판단된다. 또한, 교통하중에 의한 안전율 감소현상도 발생하는 것으로 분석되어 겸용도로 건설 후 주행차량의 하중제한 등 유지 관리에도 지속적인 관심을 기울여야 할 것으로 판단된다.
A high rock embankment by means of dynamic compaction has hardly carried out in domestic area. For the successful accomplishment of such a high rock embankment, construction quality and measurement control are conducted. Plate loading tests are carried out to verify the bearing capacity and safety against the long term settlement. In addition, settlement of each layer is measured in order to verify the effect of dynamic compaction and to predict long term settlement.
This study examined the coastal sand dune vegetation before and after the construction of an embankment on Anmado Island in order to compare vegetation in relation to the development of islands. A total of 24 species distributed on the sand dunes. 18 species were found to be in common before and after the construction of the embankment, which included Vitex rotundifolia, Imperata cylindrica var. koenigii, Zoysia sinica, etc. The species which were not found in this survey included Rumex japonicus, Setaria viridis, Portulaca oleracea, Artemisia japonica, Poiygonum aviculare, etc, and new species included Arena fatua, Carex boottiana, Lycium chinense, Leonurus sibiricus, Torilis japonica, Solanum carolinense, etc. The washing away of sand brought about the changes in habitat and the increase in naturalized plants, which included Oenothera odorata, Lepidium apetalum, Bidens bipinnata, Erigeron canadensis, Datura stramonium, Xanthium strumarium, Arena fatua, Solanum carolinense etc. In addition, the disturbance to this habitat led to the changes in vegetation. The main plant communities in the surveyed site were classified as Vitex rotundifolia-Imperata cylindrica var. koenigil community, Zoysia sinica-Calystegia soldanella community and Messerschmidia sibirica community. The sand dune vegetation on Anmado Island changed with regard to the community and the composition of species after the construction of the embankment, due to the sand being severely eroded. While Vitex rotundifolia community and Commelina communis community were found before the construction of the embankment, they were replaced by Vitex rotundifolia-Imperata cylindrica var. koenigii community, Zoysia sinica-Calystegia soldanella community and Messerschmidia sibirica community, after the construction of the embankment.
연약지반상 성토시, 성토하중은 연약지반에 편재하중으로 작용하게 되어 기초 연약지반의 과도한 침하와 측방유동을 야기할 수 있다. 연약지반의 과도한 변형은 결국 성토체 자체와 인접 지반 및 구조물의 안전을 위협하게 된다. 연약지반의 변형거동에 영향을 미치는 요인은 크게 성토하중 조건과 지반조건으로 구분할 수 있다. 따라서 본 연구에서는 이들 조건을 달리한 5회의 모형실험을 수행하여, 성토하중 재하가 기초 연약지반의 변형거동에 미치는 영향을 평가하였다. 모형실험 결과, 성토하중 재하가 지중 측방변위 발생에 영향을 미치는 영향거리는 성토체 선단부로부터 재하폭의 2배까지인 것으로 나타났다. 또한 모형실험 결과를 근거로, 성토속도(v, kPa/day)와 일평균 침하량(${\Delta}s$, mm/day) 사이의 관계식과 성토속도와 일평균 지중 최대수평변위(${\Delta}y_m$, mm/day) 사이의 상관관계식을 제안하였다.
In order to control differential settlement and to secure the safety of super structure on a high rock embankment the designed static compaction is changed with dynamic compaction and piled raft method. The parameters for dynamic compaction design are obtained from a pilot test. In addition, numerical analyses are also carried out to figure out the length and quantity of piled raft that can restraint the differential settlement within allowance range.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.