Proceedings of the Korean Geotechical Society Conference (한국지반공학회:학술대회논문집)
- 2009.09a
- /
- Pages.891-898
- /
- 2009
A Case Study Of Construction Quality And Measurement Control of High Rock Embankment
고성토 암버력 지반의 시공품질 및 계측관리 사례
-
Bae, Kyung-Tae
(Institute of Construction Technology, DAEWOO Engineering & Construction Co. Ltd.) ;
- Cha, Kyung-Seob (Institute of Construction Technology, DAEWOO Engineering & Construction Co. Ltd.) ;
- Park, Yong-Man (Kyungin Transmission & Distribution Construction Office, Korea Electric Power Corporation) ;
- Kim, Kang-Kyu (Kyungin Transmission & Distribution Construction Office, Korea Electric Power Corporation) ;
- Kim, Hyung-Suk (Kyungin Transmission & Distribution Construction Office, Korea Electric Power Corporation) ;
- Yi, Chang-Tok (ILETECH consulting engineers Co. Ltd.)
-
배경태
((주)대우건설 기술연구원) ;
- 차경섭 ((주)대우건설 기술연구원) ;
- 박용만 (한국전력 경인건설처) ;
- 김강규 (한국전력 경인건설처) ;
- 김형석 (한국전력 경인건설처) ;
- 이장덕 ((주)파일테크)
- Published : 2009.09.25
Abstract
A high rock embankment by means of dynamic compaction has hardly carried out in domestic area. For the successful accomplishment of such a high rock embankment, construction quality and measurement control are conducted. Plate loading tests are carried out to verify the bearing capacity and safety against the long term settlement. In addition, settlement of each layer is measured in order to verify the effect of dynamic compaction and to predict long term settlement.