A Case Study Of Construction Quality And Measurement Control of High Rock Embankment

고성토 암버력 지반의 시공품질 및 계측관리 사례

  • Bae, Kyung-Tae (Institute of Construction Technology, DAEWOO Engineering & Construction Co. Ltd.) ;
  • Cha, Kyung-Seob (Institute of Construction Technology, DAEWOO Engineering & Construction Co. Ltd.) ;
  • Park, Yong-Man (Kyungin Transmission & Distribution Construction Office, Korea Electric Power Corporation) ;
  • Kim, Kang-Kyu (Kyungin Transmission & Distribution Construction Office, Korea Electric Power Corporation) ;
  • Kim, Hyung-Suk (Kyungin Transmission & Distribution Construction Office, Korea Electric Power Corporation) ;
  • Yi, Chang-Tok (ILETECH consulting engineers Co. Ltd.)
  • Published : 2009.09.25

Abstract

A high rock embankment by means of dynamic compaction has hardly carried out in domestic area. For the successful accomplishment of such a high rock embankment, construction quality and measurement control are conducted. Plate loading tests are carried out to verify the bearing capacity and safety against the long term settlement. In addition, settlement of each layer is measured in order to verify the effect of dynamic compaction and to predict long term settlement.

Keywords