The substation grounding design,"IEEE Guide for Safety in AC Substation Grounding (ANSI / IEEE Std 80)"has been widely used. Substation grounding design and substation grounding resistance of grounding network site to predict the voltage at the risk of a very important task, which is a ground fault current due to the influx of the ground network and due to rise in the Earth's potential can be applied to human dangerous Voltage within safe tolerances be configured to be the ground because the network. IEEE Std. 80 for the substation construction safety equipment on the ground securing the ground electrode and the mesh around the boundary potential distribution in terms of risk analysis by the touch voltage and the reference was to clean up the definition and the basic steps of the voltage of the voltage limits the risk of peripheral grounding electrode Suppression by the simulator through a new secure from dangerous voltage design techniques were presented.
There are two kinds of ground fault diagonosis system(GFD), which are for AC and DC power line. The ground fault current of a DC power line Is, first, analyzed for a description of a GFD system for DC power line and then the construction method of the GFD system, which could be processed and analyzed a ground fault current, are explained. Main functions of the system are that the detected ground fault current could be converted to the line insulation resistance by a program and saved in the system memory continuously. Finally a DC power line insulation safety could be decide by a change of the saved Insulation resistance for a given time. This system can detect the ground fault resistance to 100㏀.
This paper proposes a single-phase buck-boost AC-AC converter. It consists of three legs with six switching units (each unit is composed of an active switch and a diode) and its input and output ports share a common ground. It can provide buck-boost voltage operation and immune from shoot-through problem. Since only two switching units are involved in the current paths, the conduction losses are low, which improves the system efficiency. The operation principle of the proposed circuit is firstly presented, and then, various operation conditions are introduced to achieve different output voltages with step-changed frequencies. Additionally, the parameters design and comparative analysis of the power losses are also given. Finally, experimental results verify the correctness of the proposed converter.
Ground Complex, which is located at Naro Space Center, consists of Assembly Complex(AC) and Launch Complex(LC) which is necessary for successful launch of KSLV-I(NARO). AC consists of Assembly/Testing Building(ATB), Payload Processing Building(PPB), Kick Motor Building(KMB). The purpose of AC is accepting of KSLV-I components, testing, checkout, assembly(disassembly) of the launch vehicle(LV), readiness for transferring LV to LC, accepting of integrated Launch Vehicle(ILV) in case of launch cancellation and short/long time storage, and so on. Qualification tests(QT) for the total system at AC are carried out to check hardware used for operations with first stage unit mockup, upper stage unit Mockup and integrated mockup(GTV). The qualification tests is carried out according to program and procedures of QT. By course of this process, AC is certificated that all the systems and facilities of AC are guaranteed by the fulfillment of technological operations envisioned in the program of qualification tests during the work with the mock-up.
With recent ESS (Energy Storage System) fire accident, the fault protection performance is becoming more important. However, there has never been any experiments with the protection performance on the faults in the ESS system level. In this study, the effect of AC ground fault and IGBT (Insulated Gate Bipolar mode Transistor) short-circuit failure on MW class ESS was performed experimentally for the first time in the world. First of all, the effect of the AC single line ground fault on battery was analyzed. Moreover, the transient voltage was investigated as a function of the battery capacity and the power level. Finally, the breaking capability and insulation performance of ESS were examined under PCS short-circuit fault condition. Through the tests, it was found that ESS protection system safely blocked the faulty current regardless of the faults, whereas the electronic parts such as IGBT and MC (Magnetic Contactor) were broken by the fault current. Also, the electrical breakdown in ESS resulted from the transient voltage during the protection process.
In contrast to AC grounding systems, the ground electrode in DC systems continuously maintains positive or negative polarity. Ground electrodes with (+) polarity proceeds by oxidation reaction. Thus, the DC current should flow opposite to the polarity of the leakage current flowing through the (+) ground electrode by using a compensation electrode, and the current flowing through the (+) ground electrode can be 0A. However, according to protecting the (+) ground electrode, the compensation electrode corrodes and gets damaged. Thus, the (+) ground electrode must be protected from corrosion, and the service life of the compensation electrode must be extended. As an alternative, the average value of the current flowing through the compensation electrode should be equal with the value of the leakage current flowing through the (+) ground electrode by using the square waveform. Throughout the experiment, the degree of corrosion on the compensation electrode is analyzed by the frequency of the compensation electrode for a certain time. In the experiment, the frequencies of the square waveform are considered for 0.1, 1, 10, 20, 50, 100 Hz, and 1 kHz. Through experiments and analysis, the optimal frequency for reducing the electrolytic damage of the (+) electrode and compensation electrode in an LVDC grounding environment is determined.
In this paper, a new energy recovery circuit for AC PDP(Plasma Display Panel) is proposed to decrease a sustain voltage and voltage stress on switching elements. In the proposed circuit, two auxiliary capacitors are connected directly to the power source through switching elements and inductors when ground potential is supplied to the panel. Therefore, the voltage across auxiliary capacitors can be increased by turns over the half of the source voltage. Because the intrinsic capacitance of PDP is charged sufficiently from the auxiliary capacitors, the level of sustain voltage and the voltage stress on the switching devices are decreased. To verify the validity of the proposed energy recovery circuit, computer simulations using PSpice program are carried out.
KIEE International Transactions on Electrophysics and Applications
/
제3C권4호
/
pp.117-122
/
2003
The AC power lines and signal lines of info-communication networks are routed on overhead poles and are highly exposed to lightning strikes. Due to the potential difference between grounding points of AC power lines and signal lines, the electronic equipments connected to the signal lines can easily be damaged by lightning surges. In this work, in order to develop reliable methods of protecting information and communication facilities from lightning surges, the reliability and performance of SPDs (surge protective devices) were experimentally investigated in an actual-sized test circuit. The behaviors of SPDs against lightning surges from AC power lines and signal lines and the coordinated effects of SPD installation methods were evaluated. As a consequence, it was confirmed that the bypass arrester methods and common grounding system are both highly effective.
This paper deals with the dynamic property of ground overvoltage relay in large turbine generator. Relay operation is based on detecting the fundamental voltages originating from the generator. Calculations of fault voltage and current are reviewed for the neutral ground resistance. The frequency, ampitude and waveform of individual harmonics were measured using power quality analyzer and memory hi-corder at the secondary side of ground potential transformer. The ac and dc high-potential tests were applied to evaluate the condition of generator, main and auxiliary transformer, isolated phase bus, potential transformer, surge capacitor and arrester.
This study evaluated the impedance characteristics of earth termination system and developed a variable frequency-typed inverter (measuring tool) for the utilization in ground design for lightning protection. The variable-frequency-typed inverter were composed of rectification part, voltage adjuster, IGBT controller and measuring part. Meanwhile, the square wave signal of variable frequency converted its frequency up to lightning surge band by using an IGBT after rectifying an alternating current (AC). It conducted performance evaluation of ground impedance of actual earth termination system by using the developed measuring tool for ground impedance and confirmed that such impedance-oriented performance evaluation was effective in the design of lightning protection.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.