Proceedings of the Korean Institute Of Construction Engineering and Management
/
2004.11a
/
pp.51-58
/
2004
The input-oriented project promotion system private participation in infrastructure projects currently in use in Korea has encountered difficulties in securing the primary benefits of private sector creativity problem solving and inflow of private capital. As such, the performance (or output)-oriented procurement process implemented in England and other developed countries should be evaluated for introduction. In Korea, private participation projects are currently identified as either solicited or unsolicited projects, each with different promotional procedures, the problem with these procedures is that competition is not pre-activated, the private sectors creativity is under utilized, and the rationality of project evaluations is inconsistent. Korea should, in order to raise the level of private sector creativity and efficiency, go beyond the currently applied Input Specification project promotion system to a Performance-oriented system similar to those implemented in England and other countries. To achieve this, we mate several proposals for the introduction of the performance-oriented system. We divide the main features of our proposals into three categories, including a reformed concessionaire selection system, a performance orientation in preparation of the concession agreement, and a performance orientation in contract management, and discuss each. 1'his study describes performance-oriented promotion systems in an output-focused way As this is an initial study on the introduction of performance orientation in private participation, various key points and proposals were identified. However, in the future, detailed research in technical fields and systems, legal research, and practical projects will be needed for implementation
Yeo, Donghoon;Jeong, Wooyong;Han, Seung Heon;Lee, Young Cheon
KSCE Journal of Civil and Environmental Engineering Research
/
v.29
no.3D
/
pp.381-389
/
2009
Korean government is investing 1.8 billion won on infrastructure and investment on PPP projects constitutes 16.3%. This phenomenon is to promote private investment as well as lessening government burdens of public budgeting. However, the only criterion to be considered is government financial status in selecting public or private highway investment projects. So systematic decision support model is required in choosing public or private highway investment projects. So, this paper suggests a systematic decision support model for deciding public or private highway investment at the early stage of project planning. Furthermore, this paper identifies key decision variables with respect to economic, politic, project management criterions based on the related literatures and feedbacks from experts. This paper analyzed 30 cases of government investment and PPP projects and got the survey result from highway specialists. As a result, this paper presents an interval with respect to economic criteria using mean and standard deviation and a logistic regression equation which can predict the possibility of PPP project. Through this study, decision maker of central or local government can decide public or PPP highway project more systematically and reasonably.
Patrick T.I. Lam ;Albert P. C. Chan ; Akintola Akintoye ;Arshad Ali Javed
International conference on construction engineering and project management
/
2011.02a
/
pp.389-394
/
2011
In many parts of the world, low cost housing used to be built and maintained by the governments, based on designs and detail specifications prepared by the public sector with construction carried out by contractors. Results vary due to differences in design standards, workmanship and property management, depending also on the neighbourhood's care of the estates and their pattern of usage. In the UK, where Private Finance Initiative (PFI) has been used for infrastructure projects, there have been successful cases of city estate being transformed by PFI. These PFI housing schemes involve new-build, refurbishment as well as facility management. Unlike traditional construction, which is based on prescriptive specifications, PFI housing is based on output specifications. A study has been undertaken to compare the two specification approaches as they are applied to housing estate. Results are enlightening and serve as good reference to cities such as Hong Kong SAR and Singapore, where public housing provisions have been a major concern of their citizens as the building stock gets older.
The purpose of this study is to understand the perceptions of stakeholders in environmental conflicts. The private rental housing project in Busan Sasang-gu Jurye 3 District, which took place in 2017 is one of many cases of environmental conflicts between developers and local residents. The case is considered as a typical failure of collaborative governance that has consequently caused negative impacts to both local residents and government. To understand why local residents could not come to consensus even though the majority of them were against the development project, we analyzed residents' perceptions and subjective opinions towards environmental conflicts. This study adopted 'Q methodology' to investigate human subjectivity. The results showed three distinguished types of subjectivity structures. Each type was named as 'collaborative governance advocates', 'public administration distrusters', and 'current local government supporters' based on their characteristics. Participants in all three types showed opposition to environmental damages that can be caused by the private rental housing development, but they revealed different perspectives on the importance of public participation and institutional responsibility in the process of decision-making. This study makes better understand what makes it difficult to build collaborative governance as a means of overcoming environmental conflicts.
Asia-Pacific Journal of Business Venturing and Entrepreneurship
/
v.8
no.4
/
pp.57-66
/
2013
Domestic PCB industry formed by orders of demand companies is extremely vulnerable in its innovation infrastructure including high value-added technology development and information exchange. The majority of PCB products produced in the country relies on the imports from abroad and it causes its vulnerability to external market changes. Due to the negative perceptions about the industry (e.g., 3D job), low treatment (especially SMEs) and expertise employment avoidance in PCB industry, the job market conditions of PCB industry is not so good. In these circumstances, the PCB industry is completely dependent on the demand market such as cellular phones, and tablet PC, and as a result the responsiveness of PCB industry to the changes in demand market is also vulnerable. In this PCB industry, Korean government is trying to build the research infrastructure for PCB industry that realizes the sharing of information among companiesthrough the operation of the PCB industry innovation forum (information innovation), builds SME suppot platform and supports quality improvement (technology innovation), and supports enterprise collaboration processes (material-process-equipment) utilizing PCM open laboratory. The PCB industry technology infratstructure project is going to be promoted by the government(1.3 billion won, each year) and the private investmen(434 million won each year) from 2013 to 2017(5 years project)(table 1). This study analyzes the feasibility of the project, by using the AHP analysis and the results shows that this project is considered feasible because the AHP overall score is evaluated as 0.841, the overall score is greater than or equal to 0.55.
PFI(Private Finance Initiative) for suppling SOC and public facilities instead of Government Infrastructure Project introduced from 1994. BTO(Build-Transfer-Operate) project had been major type of PFI system from 1994 to 2005. But after changed the Law of PFI on SOC, the BTL project newly introduced. In BTO system, the Government retrieves the investment through the operating income, but in BTL system, the government lease the facilities. As the BTO and BTL projects are widely adopted and implemented to ease the fiscal burden of government, but it has caused the tremendous fiscal burden each year over the period operation. Therefore this study attempted to analyze the question, that is, why government fiscal burden tipping? Hence, this paper, compares the difference of business structure between BTO and BTL project and explore the vicious and virtuous business structure, with the method of circular causal loop analysis. As a result, it has shown that there are some positive feedback and negative feedback loops cause the tipping and easing of government fiscal burden.
Korean Journal of Construction Engineering and Management
/
v.14
no.3
/
pp.167-175
/
2013
In 2005, the government introduced BTL(Build-Transfer-Lease) projects as one of the methods of private investment in infrastructure. In a BTL project, a private company builds a public facility and leases it to the government to withdraw its invested capital. But there appear several problems with it due to a short period of preparation and lack of experiences. Specifically, private companies that plan to participate in this project have to take a risk since serious problems are likely to take place because of unrealistic estimation of construction costs, etc., and they finally avoid participating in this project. A case study was made over advanced countries, Japan and the United Kingdom, to find out how to resolve the problems, and rational 7 improvement method were presented from a perspective of Special Purpose Company (SPC), which could be accepted by both of SPC and government agencies. The findings of the study are expected to provide workable solutions to BTL projects from a standpoint of private companies to facilitate the rational improvement of BTL projects, and this study is ultimately expected to stimulate the active participation of SPC to make a contribution to the vitalization of domestic BTL projects.
Objectives: This study aimed to share with experiences of a demonstration program based on a community for prevention and management of hypertension and diabetes mellitus, and to supply the evidence of accessible strategies within the community through the public-private partnershipin the near future. Methods: This study case was "the program of registration and management of hypertension and diabetes mellitus patients" which was conducted in Hogncheon-gun in Gangwon-province, 2012. Results: The infrastructure of this center was constructed with the public-private sector partnership according to the basic model of demonstration program since November, 2012. So, the total registered rate of hypertension and diabetes mellitus patients were 26.6% in comparison with suspected patients (to the result of 2011 Korea National Health and Nutrition Examination Survey), 37.8% in comparison with the real number of outpatient (to the claims data of 2011 Branch Honcheon-gun, National Health Insurance Corporation), and 107.8% in comparison with the project goal, sequentially. To the patients who were not treated for 30 and 60 days among the registered patients, a recall service was conducted. Through this intervention, it was monitored that this program has enhanced the consecutive treatment rate of the registered patients. Conclusions: To improve the continuous management of hypertension and diabetes mellitus patients, we are gotten to know that the community need the joint participation and mutual cooperation with public-private sector partnership.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.123-130
/
2006
Recently, Korean government promotes BTL(Build-Transfer-Lease) for their public construction project to apply private sector's experience and finance initiatives. Many of public buildings and civil infrastructure projects were planned to be delivered by BTL and it helps to continue public projects under tight budget conditions. Since the characteristics of BTL projects, creative ideas for the project function, performance and its LCC (Life Cycle Cost) become more important than usual public work project. This paper introduces the systematic "VE job Plan" application techniques for BTL project and shows the process. This study shows the application of "VE job Plan" for BTL project to help decision making and value improvement. Also, Project cost was estimated by LCC (Life Cycle Cost) analysis. Technical "FAST diagram"was developed and used to find major functions of the project. So, it helps to improve performance of functions and make creative ideas. FAST diagram also help to find relationships between functions and cost. A case study (Daegu Art Gallery BTL Project) was conducted using proposed "VE job Plan. Study demonstrates how value management helps save money and increase functional performance. Researcher found that project can save cost and improve performance of functions significantly by using appropriate VE analysis process at appropriate time.
Lam, Patrick T.I.;Chan, Albert P.C.;Akintoye, Akintola;Javed, Arshad Ali
Journal of Construction Engineering and Project Management
/
v.1
no.2
/
pp.43-48
/
2011
In many parts of the world, low cost housing used to be built and maintained by the governments, based on designs and detail specifications prepared by the public sector with construction carried out by contractors. Results vary due to differences in design standards, workmanship and property management, depending also on the neighbourhood's care of the estates and their pattern of usage. In the UK, where Private Finance Initiative (PFI) has been used for infrastructure projects, there have been successful cases of city estate being transformed by PFI. These PFI housing schemes involve new-build, refurbishment as well as facility management. Unlike traditional construction, which is based on prescriptive specifications, PFI housing is based on output specifications. A study has been undertaken to compare the two specification approaches as they are applied to housing estate. Results are enlightening and serve as good reference to cities such as Hong Kong SAR and Singapore, where public housing provisions have been a major concern of their citizens as the building stock gets older.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.