Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.462-466
/
2006
The startingpoint of successful buildingproduction process is the feasibility study of the project. If the feasibility study is poor which is affected in direct production processes such as designing and engineering, it incurs a great unrecoverable loss to the company. The governmentinstitutionalized the feasibility study for projects that budgets over 50billion won in an effort to ensure competitiveness of the construction industry after IMF; however, the system and effort to created systematic studies or guidance preparation for private construction development projects are lacking in great deal. Therefore, the objective of this study is to establish the analysis factors of feasibility study and evaluation standard by systematic analysis in consideration of the changes of various variables and mutual relationships using system dynamics technique for office buildings among commercial buildings.
This study examined the effects of entrepreneurship education on the career decision of students in the College of Engineering. The purpose of this study was to examine the perceived desirability, perceived feasibility and the career decision - making effects of career decision - making self - efficacy as subjects of entrepreneurship education. This study was carried out by using PLS 3.0 for engineering students in an university. The results of this study are summarized as follows. First, it shows that entrepreneurship education has a positive impact on perceived desirability, perceived feasibility. Second, perceived desirability and perceived feasibility have different effects on career decision making and entrepreneurship intention. Third, career decision self - efficacy affects entrepreneurship intention and career intention in career decision making. The results of this study suggest the importance of entrepreneurship education for career decision making and provide meaningful implications for educators and policy developers.
Journal of Korean Library and Information Science Society
/
v.47
no.2
/
pp.175-200
/
2016
As a part of the feasibility study of constructing the Maritime and Ocean Digital Library, we focused to examine the basic economic feasibility of the library in this study. In order to achieve the purpose, we analyzed related governmental policies, investigated the demand of the digital library, and tested the economic feasibility. As the tools of economic test, we calculated the size of benefit by Contingent Valuation Method, and estimated the Benefit/Cost Ratio, Net Present Value and Internal Rate of Return. As the result, we could get an assessment of positive economic feasibility mainly from the quite high level of WTP for the Maritime and Ocean Digital Library.
Proceedings of the Korea Inteligent Information System Society Conference
/
2005.11a
/
pp.241-250
/
2005
New product development (NPD) is defined as the transformation of a market opportunity and a set of assumptions about product technology into a product available for sale. Managers charged with project selection decisions in the NPD process, such as go/no-go choices and specific resource allocation decisions, are faced with a complicated problem. Therefore, the ability to develop new successful products has identifies as a major determinant in sustaining a firm's competitive advantage. The purpose of this study is to develop a new evaluation model for NPD project selection in the high -tech industry using support vector machines (SYM). The evaluation model is developed through two phases. In the first phase, binary (go/no-go) classification prediction model, i.e. SVM for high-tech NPD project selection is developed. In the second phase. using the predicted output value of SVM, feasibility grade is calculated for the final NPD project decision making. In this study, the feasibility grades are also divided as three level grades. We assume that the frequency of NPD project cases is symmetrically determined according to the feasibility grades and misclassification errors are partially minimized by the multiple grades. However, the horizon of grade level can be changed by firms' NPD strategy. Our proposed feasibility grade method is more reasonable in NPD decision problems by considering particularly risk factor of NPD in viewpoints of future NPD success probability. In our empirical study using Korean NPD cases, the SVM significantly outperformed ANN and logistic regression as benchmark models in hit ratio. And the feasibility grades generated from the predicted output value of SVM showed that they can offer a useful guideline for NPD project selection.
Journal of the Korean Society of Systems Engineering
/
v.1
no.1
/
pp.1-13
/
2005
The purpose of this paper analyze development feasibility and alternatives for infrared detector development in both technology and cost. Infrared Detector is core component of Thermal Imaging System and developed by ADD from 2006 10 2008 year. We got raw input data from development and technical expert, and then analyze cost and technology for development feasibility, and alternatives study. Technology level is analyzed by TRL(Technology Readiness Level) and AOA(Analysis of Alternatives) is done by development cost estimate. Estimating the development cost, we use SEER-H that is parametric cost estimating tool based on Knowledge Base. This study can help those who are related to the cost and development feasibility analysis of other weapon systems.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.249-254
/
2007
The main bodies of housing markets of today need to carry out a systematic and objective feasibility analysis even from the step of planning in order to succeed in a diverse and complex market environment. Therefore, it is meaningful to understand this housing market environment and propose a necessary model for the feasibility analysis of hosing business. In this vein, the aim of this study was to extract an actual and practical feasibility analysis factor and its importance for housing market, and then present and apply a feasibility analysis factor model to an on-site example, in order to verify the model's validity. For this, the investigator interviewed with and carried out a questionnaire survey of experts in housing development projects. Study findings are as follows:First, the feasibility analysis factor, derived in this study, could provide a ground to evaluate the feasibility of subject projects in the planning of development through an analysis index. Second, when feasibility is under the level of carrying out the projects, it is possible to reexamine the projects through extracting analysis factors of which points are under the standard and via a feedback process for improvable analysis factors. Therefore, the result of applying the feasibility analysis model of this study to actual housing development projects analytically shows that the model could provide a practical evaluation criterion to the person in charge of project development through an analysis index.
Journal of Korean Society of Disaster and Security
/
v.14
no.3
/
pp.1-16
/
2021
Recently, large-scale projects are required in the water resources sector considering safety and publicitythe due to uncertainty of securing water resources and changes in the ecological environment by climate change. Among these large-scale projects, the projects that fall under the preliminary feasibility study are determined by comprehensive analysis based on economic analysis, policy analysis, and balanced regional development analysis. However, most of the results of the preliminary feasibility study showed a tendency to depend heavily on economic analysis. For this reason, projects in non-metropolitan areas sometimes fail in the preliminary feasibility study. To supplement this point, the Korea Development Institute revised the standard guidelines for preliminary feasibility studies for water resources sector projects that place a high weight on policy feasibility analysis. Therefore, the objective of this study is to analyze the cases of the preliminary feasibility study conducted previously and to suggest the direction of policy analysis in the preliminary feasibility study for water resources sector projects. For this, we analyze preliminary feasibility studies conducted for 18 years from 2002 to 2019, and suggest direction of policy analysis method using the benefit items not included in the economic analysis.
Kim, Soo-Jin;Bae, Seung-Jong;Yoo, Seunghwan;Kim, Yoonhyung;Yoon, Sungeun;Kim, Jeonghoon
Journal of Korean Society of Rural Planning
/
v.27
no.1
/
pp.21-28
/
2021
Since 2001, the Pangyo district multipurpose rural water development project has been promoted as a new target project for stable supply of agricultural water and improvement of the living environment of rural areas in Seocheon-gun. Detailed data analysis and logic must be reinforced, focusing on the items reorganized by the reorganization of the preliminary feasibility study. The purpose of this study is to promote the smooth promotion of projects by conducting a policy effect assessment following the reorganization of the preliminary feasibility study system. This study conducted a policy assessment of agricultural infrastructure improvement project for preliminary feasibility study. The policy assessment is divided into three parts: project implementation conditions, policy effects and special assessments. The newly established policy effect is to assess the job effects, living conditions impact, environmental evaluation, and safety evaluation that contribute to the quality of life. Sixteen policy assessment items were selected and evaluated quantitatively and qualitatively. The results of the study are expected to provide basic data for the comprehensive judgment of the preliminary feasibility study of agricultural infrastructure improvement project in the future.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.347-352
/
2001
Midtown redevelopment project is intended for restoration of city's declining function and promoting the utilization of land, but several factors such as participants of different nature in the project, different expectation level from them, high land value accompanied by geographical location as a city and the demand for high density development, nature of business that requires long duration to complete and vast amount of fund contribute to complication of feasibility study. Due to these characteristics of midtown redevelopment project, consideration of various factors involved with it and reliable analysis are required but suggested complication of feasibility study is causing halt in project, preventing from launching it and delaying it. So, this study was undertaken to be a help to feasibility study of midtown redevelopment project by suggesting main elements that need to be dealt with analysing questionnaire survey result attained from related expert in this area and arranging total 45 factors essential to feasibility study for midtown redevelopment project that can be classified into 5 main category such as economic/financial factors, legal/institutional factors, market related factors, technical factors and conflict related factors through documental investigation, case study and interview with specialist concerned.
Korean Journal of Construction Engineering and Management
/
v.5
no.3
s.19
/
pp.97-105
/
2004
Planning phase became very important because the construction market in Korea is often unpredictable. The existing feasibility analysis cannot fulfill its purpose in development projects because they are based on intuitive approach rather than systematic approach. The purpose of this study is to make a prototype of feasibility model to be a good investment. To build the model, first, risk factors which can be occurred in project had to be selected. Risk factors were divided into several groups in basis of characteristical risk. Economical risk factors were input on financial analysis. Then, to catch the relevance and influence of all risk factors, influence diagram and decision tree were made. Finally, sensitivity analysis was activated, then what the critical factors were, and how those factors could be solved. Through these procedures, the feasibility model that was made in this study could include both quantitative and qualitative factors. This model is expected to be used as a guide of feasibility analysis including all risk factors and is to serve systematic frame in planning and feasibility stage.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.