When a train enters into a tunnel, a compression wave is generated by a front nose and a expansion wave is generated by a rear nose each other. Because the compression wave and expansion wave have interactions with the train in a tunnel repeatedly, the internal pressure of the train is dramatically varied. And this pressure variation gives passengers discomfort like ear-ache. In this paper, we had measured the internal pressure variation of TTX developed and being on Test-Running in Honam line and made an analysis of pressure variation rate. As a result, the internal pressure variation was different as to the length of tunnel. Though the entering velocity of TTX is similar on test tunnels, on the short tunnel, the pressure drop was lower then that of the long tunnel. And it was expected that the rates of internal pressure variation would be exceeded the limits on 160km/h entering velocity.
Journal of Korean Tunnelling and Underground Space Association
/
v.9
no.3
/
pp.287-298
/
2007
Recently, as the construction of new railway and the relocation of existing line increase, tunnel structures get longer. The railway fire accidents in long tunnel bring large damages of human life and disaster. The interest on safety in long tunnel has been growing and the safety standard for long tunnels is tightening. For that reason, at the planning stage of a long tunnel, the optimum design of safety facility for minimizing the risks and satisfying the safety standard is required. For the reasonable design of a long railway tunnel considering high safety, qualitative estimation for tunnel safely is required. In this study, QRA (Quantitative Risk Analysis) technique is applied to design of a long railway tunnel for assuring the safety function and estimating the risk of safety. The case study for safety design was carried out to verify the QRA technique for two railway tunnels.
Journal of Korean Tunnelling and Underground Space Association
/
v.11
no.4
/
pp.373-385
/
2009
A new indexing methodology so called KTH-index was developed to quantitatively evaluate a potential level for tunnel collapse hazard, which has been successfully applied to tunnel construction sites to date. In this study, an attempt is made to apply this methodology for validating an outcome of tunnel design by checking the variation of KTH-index along longitudinal tunnel section. In this KTH-index simulation, it is the most important to determine the input factors reasonably. The design factor and construction condition are set up based on the designed outcome. Uncertain ground conditions are arranged based on borehole test and electro-resistivity survey data. Two scenarios for ground conditions, best and worst scenarios, are set up. From this simulation, it is shown that this methodology could be successfully applied for providing quantitative validity of a tunnel design and also potential hazard factors which should be carefully monitored in construction stage. The hazard factors would affect sensitively the hazard level of the tunnel site under consideration.
Proceedings of the Korean Society for Noise and Vibration Engineering Conference
/
2005.05a
/
pp.772-775
/
2005
Most engineers, related to soil and civil dynamic field, have been interested in the direct dynamic design of building transmitted from soil and rock to structure due to blasting. However it is not easy to estimate the dynamic response of structures due to blasting by using analytical method because of difficulties of soil modeling, prediction of excitation force and so on. In this paper, dynamic analysis have been performed to predict vibration level and evaluate dynamic safety of structure adjacent to tunnel blast and the semi empirical method, which is based on vibration measurement data, has been employed to consider blast vibration characteristics.
Kim, Seoung-Soo;Kim, Hong-Sam;Kim, Dong-Gyou;Yoon, Ha-Young;Bong, Won-Yong
Proceedings of the Korea Concrete Institute Conference
/
2006.05b
/
pp.249-252
/
2006
Recently, as it has greatly increased the demand on the serviceability of subway, cable tunnel and underground storage, the stability of tunnel structures has been attracting the concern of engineers and researchers. Thus the aim of the present study is to evaluate acid attack resistance of shotcrete using in tunnel structures. And, in order to understand the deterioration mechanism, test using scanning electron microscopy(SEM) analysis and X-ray diffraction showed that the deterioration mechanism due to acid attack in shotcrete.
The existing monitoring and control systems of utility-pipe conduit (power tunnel, cable tunnel etc) have established communication lines using optical fiber, leaky coaxial cable (LCX), and several kinds of control cable. Due to the properties of the used media, the cost of equipment is considerably high and the maintenance of the system is difficult. Also, the term of carrying out is long so that the extension of the system is in difficulty. Now it is desirable to adopt Power Line Communication (hereinafter, PLC) technology in the monitoring and control systems and use the existing low-voltage power-line for lamplight as communication line. This will lead the reduction of the construction cost and the easy maintenance of the system. In this paper, we research the characteristics of PLC in conduit, design and manufacture the field test system, and analyze the performance of the system by field test. Then, we introduce the reliable monitoring and control system of utility-pipe conduit using PLC.
Journal of Korean Tunnelling and Underground Space Association
/
v.12
no.1
/
pp.43-49
/
2010
The escape connecting gallery in a tunnel on a road is one of emergency equipment to ensure safety for passer in the tunnel against the tunnel fire. Government stipulate over 500m tunnel has the cross passage at intervals of less then 250 m. However, this lump estimated interval is generated the concerns of exaggeration and under construction because peculiarity of the tunnel ex. The velocity of the tunnel airflow, an incline, degree of a fire, and innering area are not considered. The study indicate the way to estimate of the cross passage considered an incline and the velocity of the tunnel airflow for efficient application of cross passage on the tunnel design. As a result, in 0.0 m/s and 1.0 m/s of the velocity of the tunnel airflow case, the movement of smoke is influenced by the incline however, in 20 m/s case, it isn't influenced by incline much. According to the velocity of tunnel airflow and the incline, optimum interval of cross passage is not corresponded. Therefore established lump estimate that has 250 m intervals would be changed to estimate of optimum interval of cross passage that considered about the properties of tunnel, the velocity of the tunnel airflow, incline, degree of a fire and innering area of the tunnel.
Recently, the application of transverse ventilation system in accordance with oversized exhaust ports has been increased in bidirectional road tunnel in order to improving smoke exhaust ability. In this study, numerical simulations were carried out by using FDS (ver. 4.0) which includes variations of exhaust flow rates and heat release rate of fire to obtain the optimal smoke exhaust rate in case of fire in the transversely ventilation system. As a result, smoke exhaust amount tends to increase when the inner velocity is existing in the tunnel. In case of internal longitudinal air velocity 2.5m/s face to the fire, smoke moving distance should be restricted within 250m when the smoke exhaust rate which exceeds $244.8m^3/s$.
Kim Yong-Il;Hwang Nak-Yeon;Yoon Young-Hoon;Jie Hong-Keun;Jang Sung-Wook;Kim Dong-Hyun
Proceedings of the KSR Conference
/
2004.10a
/
pp.308-327
/
2004
As use of tunnels and subways increase there also are accidents proportionate to it. Daegu Subway Station fire, Hongjimoon tunnel fire led people to be conscious of disaster protection and as a result, there is a trend to adopt standards for fire protection. Accordingly, this thesis is focused on investigating various fire and water protection related issues for subaqueous tunnel under Ran river. The thesis developed evacuation and disaster prevention plan as fire level increases and have identified the suitability of disaster prevention through evacuation and fire simulation, countermeasure of a water leakage during construction and operation considering the subaqueous tunnel. And we selected EPB shield TBM equipment considering the ground condition and effect of boring hole, and accomplished reasonable water protection design through setting goals using event-tree method, as well as examining model test of boring hole and flooding in heavy rain. Also included structured total system consist of water leakage sensing system, water protection gate, pumping system and fire protection system to respond systematically in emergency.
Kim, Dong-Jin;Moon, Dae-Seop;Moon, Seong-Am;Hwang, Young-Ha
Journal of the Korean Society for Railway
/
v.10
no.1
s.38
/
pp.16-21
/
2007
Along with the opening of the high speed railroad in 2004, the number of long tunnels constructed is increasing and will be continued. In this respect, the fro inside the tunnels is a main cause of drastic damages to both facilities and lives of passengers on board, especially more severe consequences are expected if the fire occurs on a train in urban area. Even though, the threat to human lives due to the increasing number of tong tunnels and increasing train operation times inside such tunnels is getting bigger, the studies to measure safety of the tunnel and to enhance the safety of passengers have not been carried out enough in Korea. Therefore, in this paper, we will use the probabilistic method to predict the average number of deaths of passengers in case of fire on a train iii tunnel, and show the potential risk to passengers which can be a guide for safer design of tunnels to be constructed.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.