• Title/Summary/Keyword: Young Dong Tunnel

Search Result 143, Processing Time 0.026 seconds

Three Dimensional Characteristics of the Airflow in Unidirectional Vehicle Tunnels

  • Kim, Sang-Hyun;Kim, Doo-Young;Choi, Pan-Gyu;Lee, Chang-Woo
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2008.10a
    • /
    • pp.287-300
    • /
    • 2008
  • Airflow distributions along tunnel and over the cross section are critical in selecting installation location of the velocity monitor to obtain the representative data for ventilation as well as fire safety systems. This paper aims at performing CFD and on-site studies to analyze the longitudinal and cross-sectional distributions of the air velocity in tunnels employing longitudinal and semi-transversal ventilation systems. This study can ultimately contribute to selecting the monitor type as well as the optimal installation locations in vehicle tunnel.

  • PDF

A basic study on the location of mirror reflector system to improve illumination environment (터널의 조명환경 개선을 위한 반사거울 시스템의 위치 선정에 관한 기초연구)

  • Jeong, Myeong-Soon;Joo, Jae-Sung;Jeong, In-Young;Song, Kyoo-Dong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.5
    • /
    • pp.385-393
    • /
    • 2011
  • As the economic growth achieved and the straight road was increased. so, the tunnel built more than before. In these days, lighting of tunnel entrance is important for safety and comfortable driving. Most of the tunnel lighting depend on artificial lighting and they use a lot of energy. In this paper, as a research for illumination improvement and saving energy at tunnel, reflecting mirror system is suggested. The performance of the system was evaluated with respect to various aspects. By applying a reflective mirror system, tunnel lighting and environment can be improved. This study is a preliminary study for developing a system to save energy of tunnel artificial lighting.

Distance between the Parallel Shield tunnel and Application (병렬 쉴드터널의 이격거리와 적용사례)

  • Kwak Chul-Hong;Kim Jae-Young;Kim Dong-Hyun;Lee Du-Hwa;Lee Seung-Bok;Kim Eung-Tae;Shim Jai-Beom
    • 한국터널공학회:학술대회논문집
    • /
    • 2005.04a
    • /
    • pp.225-232
    • /
    • 2005
  • The construction of parallel tunnel by using the shield TBM method was increased recently. Accordingly the application and the propriety of the parallel shield TBM tunnels were studied through domestic and foreign construction cases herein. Also the behavior of tunnel structure and ground was evaluated by a numerical analysis with various ground conditions and the distance between the parallel tunnels. As a result, it was concluded that a deep investigation as well as a ground reinforcement was required with a ratio(L/D) of the distance between the parallel tunnels(L) to tunnel outer diameter(D) less than 0.5 because the Interference phenomenon was expected to occur. And the appropriateness of the application method of parallel shield TBM tunnel was validated through the 2-dimensional numerical analysis simulated the process of excavation after the ground reinforcement in the starting area of the OOO construction site with the ratio(L/D) of 0.35.

  • PDF

Analysis of Reduction Effect on Noise Discharge from Lightweight Soundproof Tunnels Installed with Lateral Sound-absorbing Panels (직각 흡음체 설치 경량방음터널의 토출소음 저감효과 분석)

  • Jeong, Young Do;Ahn, Dong-Wook;Noh, Myung-Hyun
    • Journal of the Korean Society for Advanced Composite Structures
    • /
    • v.7 no.1
    • /
    • pp.19-24
    • /
    • 2016
  • Most of the soundproof tunnels generate significant discharge noise through their inlets and outlets so that the length of the tunnel has been extended frequently than required to minimize the effect on such discharge noise. Thus, in this paper, we investigate reduction capability of discharge noise from the sound proof tunnel installed with lateral sound-absorbing panels on the partitioned truss members in the longitudinal direction of the tunnel. In conclusion, noise field analysis results shows that the sound proof tunnels with lateral sound-absorbing panels have an effect on discharge noise abatement and thereby tunnel's length reduction.

Results of Microsurgical Anterolateral Tunnel Approach for Cervical Disc Herniation (경추간판탈출증에 대한 미세 전측방 Tunnel Approach의 결과)

  • Jang, Woo-Young;Kim, Keun-Soo;Lee, Jung-Chung;Kim, Chul-Jin;Choi, Ha-Young;Xuan, Xiu-Nan;Han, Dong-Han
    • Journal of Korean Neurosurgical Society
    • /
    • v.30 no.5
    • /
    • pp.600-604
    • /
    • 2001
  • Objective : The authors report the microsurgical anterolateral tunnel approach for the treatment of the cervical disc diseases and its postoperative surgical results. Methods : All surgical procedures followed the method of classical microsurgical anterior discectomy. Small tunnel(7-8mm) was made on the disc space reaching to the posterior longitudinal ligament. The disc materials and bony spurs were removed through this tunnel. Thirty-one patients of cervical disc herniation(24 cases with pure disc herniation, 7 cases with combined cervical spondylosis) were evaluated on the symptoms, conformation in plain X-ray, C-T, and MRI. The follow up time was over 2 years. Results : Postoperatively the result(following the out come scale) was excellent and good in Twenty-nine patients. One with fair result showed remnant disc particle and spur and another one is combined with cord contusion. One patient with lesion in C 3-4 space and two cervicothoracic junction showed excellent result. Two patients with osteoporosis also showed good results. Cervical spine curvature and disc space height were not changed on the plain X-ray and MRI in all patients. Twenty-nine patients were discharged within 3 days after surgery without any postoperative complications. Conclusions : The microsurgical anterolateral tunnel approach could be indicated for the treatment of patients with cervical disc diseases and with difficulty in achieving interbody fusion(the higher cervical level and cervicothoracic junction, osteoporosis etc.).

  • PDF

Section enlargement by reinforcement of shotcrete lining on the side wall of operating road tunnel (운영중인 도로터널의 측벽하부 숏크리트 보강에 의한 단면확대)

  • Kim, Dong-Gyou;Shin, Young-Wan;Shin, Young-Suk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.14 no.6
    • /
    • pp.637-652
    • /
    • 2012
  • The protector with the shape of '${\sqcap}$' in cross section can be set up in the tunnel, which can be constructed for enlargement of cross section, to keep traffic flow in the tunnel. It is impossible to install the rockbolt in the side wall of tunnel due to a limited space between the protector and cutting surface of side wall. The objective of this study is to suggest the optimum thickness of shotcrete lining without rockbolt on the side wall and to evaluate the stability of tunnel enlarged. Numerical analysis was performed to evaluate the displacement at the center of tunnel, the convergence of tunnel, and the stress in shotcrete lining in 4-lane NATM road tunnel enlarged from 3-lane NATM road tunnel. The vertical displacement at the center of tunnel and the convergence of crown in the tunnel with rockbolt in the side wall were almost similar to those in the tunnel without rockbolt in the side wall. The convergence of bench/invert and the stress in shotcrete lining without rockbolt on the side wall were greater maximum 0.57 mm and 1,300 kN/$m^2$ than those with rockbolt in the side wall. The increased convergence and the stress in shotcrete lining can be reduced in incerasing of thickness of shotcrete lining about 20% (5 cm) of standard thickness, 25 cm, of shotcrete lining.

perforation of tunnel in limestone formation (석회암층의 터널관통사례)

  • Kim, Yong-Il;Hwang, Nak-Yeon;Jeong, Du-Seok;Hong, Jong-Sang;Lee, Nae-Yong
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2007.03a
    • /
    • pp.64-80
    • /
    • 2007
  • This paper presents a case study on the excavation of a long tunnel(16.2km) named as "Sol-An tunnel", which connects between Mt. Dongbaek station and Dokye station in the Young-dong Railroad. This site is located in a complex geological region with faults, cavities and coal measures as sedimentary rocks area. It occurred geotechnical problems unexpectedly by running water when tunnelling in limestone area within those geological structures. This tunnel caused surface settlements through the decrease of ground water level and soil washed-out affecting by cavities and faults within limestone formation. This paper presents a analysis of source through a close investigation and measures. And also, does preventive measures about returns of settlements reflected by properties of limestones.

  • PDF

New Construction and Design Method of Two Arch Tunnel (최신 투 아치 터널의 굴착 공법과 구조 및 설계)

  • Yun, Seok-Ryul;Kwon, Oh-Hyun;Seo, Dong-Hyun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.938-945
    • /
    • 2004
  • In order to cope with ever growing traffic flow and complexity in the urban area, construction demands for expanding and realigning of existing urban roads and massive development of underground space within the urban area are in its increasing trend, it is fact that, mainly due to lack of statistical data accumulation through real construction, technology and construction practice to support such demands can hardly be said to have been established enough and leave many things still to be developed. These circumstances therefore came to motivate me to get into a study for a particular subject of "Design Basics for Closely Neighbored Twin Tunnel" among others, and also to put forward subjects required to be further studied in this connection in the future as follows: 1) To make a new economical design model for closely neighbored twin tunnel not only to make a drain for center perfect but also a tunnel construction safe. 2) Further efforts should be exerted for establishment of general standards for design and construction of various types of large cross-section tunnels including Twin structure.

  • PDF