• 제목/요약/키워드: Work-order system

검색결과 2,802건 처리시간 0.031초

수주 산업에서의 작업지시 시스템 (Work-order System for Make-to-orders)

  • 목학수;신현창
    • 산업공학
    • /
    • 제11권2호
    • /
    • pp.177-190
    • /
    • 1998
  • The work-order performs an important role in make-to-order production. The development of work-order system in this production is more complex than work-order system in planing production. To construct work-order system, load of directors for work-order must be decreased, and production management between scheduling of master plan and current workshop conditions must be considered. In this study, we grasped troubles in present work-order system and flows of information for work order. Using these results are made database schemas and data flow diagrams for effective development of work-order system. And then, for successful establishment of work-order system and actual use of directors, we considered systematic and easy user-interface. For a case study, development procedures of work-order system are presented for plant factory.

  • PDF

ORR(Order Review and Release)을 이용한 중${\cdot}$소 사출금형업체 일정계획시스템 개발 (A scheduling management system (SMS) using order review and release (ORR) for small & medium sized mold & die makers)

  • 길국호;김봉혁;김동원
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2004년도 춘계공동학술대회 논문집
    • /
    • pp.620-623
    • /
    • 2004
  • Conventionally injection molds & dies are manufactured through an order-oriented manner. This brings unexpected orders into the shop floor such as hot order, re-work, and new types of mold & dies. Thus, there needs appropriate resource assignment plans considering the available times of machines and workers. Further, a scheduling system is required that can create work schedules periodically or by customers' requests. Yet, in small & medium sized mold & die makers, production schedules usually depend on the shop floor workers' experience and their manual preparation. Hence, developed in this study is a scheduling management system (SMS) based on order release and review (ORR) in small and medium sized mold & die companies. The proposed SMS considers delivery dates as well as flexible work schedules, so as to meet frequent changes of customers' order. The system can provide effective resource assigning and work scheduling plans, securing standard data associated with shop floors. Furthermore, the system pursues economical schedules for companies' needs, equipped with an available to promise (ATP) function that can effectively accommodate the changes of production plans.

  • PDF

병원약국의 외래조제업무에 대한 컴퓨터의 이용 (Utilization of Computer System for Outpatient's Dispensing Affairs in Hospital Pharmacy)

  • 노환성
    • Journal of Pharmaceutical Investigation
    • /
    • 제23권2호
    • /
    • pp.97-102
    • /
    • 1993
  • Hospital pharmacy services are divided into dispensing affairs for inpatients and outpatients, pharmaceutical service, stock control, intravenous admixture service, drug information service, pharmacokinetic consultation service, education and research work, etc. But among those affairs, dispensing affair for outpatient is perceived as the most important work in Korea, because it is linked directly with hospital service for patients. Therefore, total computer system for dispensing area was adopted from opening point of hospital in 1989 in Asan Medical Center. Utilization of computer system for outpatient dispensing area is as follows; 1) Order communication system of prescription by Total Hospital Information System, 2) Automatic print-out system of direction for use by sticker connected with on-line net work, 3) Use of automatic tablet counting and packaging machines connected with on-line net work. Those computer system resulted in curtailment of pharmacy manpower and shortening of waiting-time for outpatient.

  • PDF

실적공사비 적산방식 도입을 위한 조경공사 공종분류체계에 관한 연구 -주택단지 조경공사를 중심으로- (A Study of Landscape Construction Work Classification for System Instruction of New Estimation System based on Historical Construction data. - With regard to Housing Landscape Construction -)

  • 박원규;김두하;안동만
    • 한국조경학회지
    • /
    • 제25권1호
    • /
    • pp.82-99
    • /
    • 1997
  • The purpose of this study is to establish work classification system of landscape construction in order to offer the basis of new estimation system of public landscape construction. New estimation system is based on historical construction data. For application of this system, the standard work classification system is necessary. Because extensive cost data should be accumulated under an unified construction work classification system. In the study of new estimation system carried by KICT(Korea Institute of Construction Technology), landscaping works belong to earth work of civil engineering. It looks very unreasonable work classification, because landscape archtecture has its own specialties and professional domain. In this study, information classification systems in the construction industry and various landscaping works of housing developments are analysed. As a result. a standard work classification system of housing landscape construction is proposed in section VI-3. This standard work classification structure consists of three levels divisions (i.e large work division, middle work division, small work division) . Now in this study, housing landscape construction works are divided into four large works and twenty six middle works. According to work attributes, middle and small work division is possible to subdivide into details.

  • PDF

Suggestion of Model Change Work Improvement by REBA and Therblig

  • Lee, Sung-Koon;Park, Peom
    • 대한인간공학회지
    • /
    • 제30권6호
    • /
    • pp.757-764
    • /
    • 2011
  • Objective: The aim of this study was to provide a method to improve the compliance and reduce the time by reducing the workload during the model change work. Background: The enterprises are constructing the small quantity batch production system by increasing the number of model change and reducing model-changing. However, the compliance is low because the work is strenuous and high skills are needed, so the system management is facing with many difficulties. Method: After classifying the model change work according to the purposes(preparation, change and adjustment) with the target of mascara filling machine, element tasks time were measured and the motion analysis(therblig symbol) and REBA analysis were performed. The study incorporated 3 independent variables as the number of motion, REBA score and the element time. The dependent variable is the type of element work as preparation, change and adjustment. The statistical test was performed by one-way ANOVA(${\alpha}$ < 0.05). Results: For the preparation, the number of motions appeared in the order of Use(U), Transport Loaded(TL), and Position(P). The order appeared in change is Use(U), Release Load(RL), and Grasp (G). The adjustment appeared in the order of Position(P) and Use(U). The results of average motion time as the element work times divided by the number of motion appeared in the order of adjustment(1.85sec/motion), preparation(1.11sec/motion), and change(0.62sec/motion). The results of REBA showed that the average risk level of change and adjustment were medium, but 53.1% of change and 42.9% of adjustment were evaluated as high. Conclusion: Reducing the avoidance and improving the compliance of work could be expected if the job autonomy were improved by improving the working postures with high risk level. Application: It is expected to solve the problem of reducing the time of model change work in the small quantity batch production system. The future work is to carry out the improvement directions found in the results and compare the results after improvement.

Mathematical Verification of a Nuclear Power Plant Protection System Function with Combined CPN and PVS

  • Koo, Seo-Ryong;Son, Han-Seong;Seong, Poong-Hyun
    • Nuclear Engineering and Technology
    • /
    • 제31권2호
    • /
    • pp.157-171
    • /
    • 1999
  • In this work, an automatic software verification method for Nuclear Power Plant (NPP) protection system is developed. This method utilizes Colored Petri Net (CPN) for system modeling and Prototype Verification System (PVS) for mathematical verification. In order to help flow-through from modeling by CPN to mathematical proof by PVS, an information extractor from CPN models has been developed in this work. In order to convert the extracted information to the PVS specification language, a translator also has been developed. ML that is a higher-order functional language programs the information extractor and translator. This combined method has been applied to a protection system function of Wolsong NPP SDS2(Steam Generator Low Level Trip). As a result of this application, we could prove completeness and consistency of the requirement logically. Through this work, in short, an axiom or lemma based-analysis method for CPN models is newly suggested in order to complement CPN analysis methods and a guideline for the use of formal methods is proposed in order to apply them to NPP Software Verification and Validation.

  • PDF

작업지시 및 작업실적 보고의 효율적 운영을 위한 모델 개발 (Development of the Model for Effective Operation of Work Order and Report of Work Performance)

  • 공명달;김정자
    • 산업경영시스템학회지
    • /
    • 제21권46호
    • /
    • pp.147-158
    • /
    • 1998
  • Work order and report of work performance are essential activities of work management in the shop floor. This study suggests the model for the communication methods and Information exchange systems which can enhance faultless accuracy about these informations in the client/server architecture.

  • PDF

주거시설공사의 하도급 통합발주 프로세스 개발 (Integrating Order Process in Residential Building Construction)

  • 김용원;박형진;정진현;구교진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 추계 학술논문 발표대회
    • /
    • pp.84-85
    • /
    • 2013
  • Integrating multi-trade works system helps to reduce to minimize the conflict of subcontract business and improve communication to increase productivity of construction. However it takes such a big risk if subcontract of integrating multi-trade works went bankrupt during the project so some of construction companies executed to only small project and it's not sufficient to adopt overall project. This paper suggested the improvement scheme of work classification integrating multi-trade works, which takes a consideration into work zoning in order to apply current work situation.

  • PDF

생산계획 및 우선순위규칙에 따른 Order Release 정책의 유효성에 관한 연구 (The Effectiveness of Order Release Strategies considering Production Plan and Dispatching Rules)

  • 최병대;이기창;박찬권;박진우
    • 한국시뮬레이션학회논문지
    • /
    • 제8권4호
    • /
    • pp.73-87
    • /
    • 1999
  • Order Review/Release (ORR) System is the linkage between planning system and actual production. Reduction of the waiting time on the machines, work in process and lead time variation may be achieved by adopting ORR strategies. But researchers on the ORR do not agree on the effectiveness of ORR. Some say that the overall system flow time may be increased if ORR is adopted, but others say that ORR can reduce work in process, flow time and variation of flow time. The objective of this research is to clarify under what environments order release strategy is effective. Simulation study was conducted in a hypothetical job shop. The experimental results show that dispatching rule is much more important than ORR is in controlling the shop floor. But the results indicate that ORR can reduce mean shop flow time, average work in process and variation of shop flow time under such environments where utilization level is high and planned order is weekly released to the order pool. And the results also show that the effect of plan smoothing on the ORR is insignificant, which is inconsistent with the results of the previous researches.

  • PDF

전기공사 분리발주의 이론적 고찰 - 정책집행 이론을 중심으로 - (Theoretical Consideration About Separate Order for the Electrical Work - Focusing on the Policy Implementation Theory -)

  • 김효진
    • 전기학회논문지
    • /
    • 제60권11호
    • /
    • pp.2165-2170
    • /
    • 2011
  • The separate order for the electrical work is an institutional plan to improve the electrical construction quality and strengthen the competitiveness of the electrical contractors. The systematic approach for the policy implementation of the separate ordering system can make its adaptability higher and lead to a policy success. There are many kinds of effects on the implementation of the separate order, but institutional foundation is needed for increasing the policy adaptability. The necessity of the systematic and theoretical foundation was detected in various factors by considering policy implementation theory. In order to fix the separate ordering system, reasonable methods such as finding inducements and offering incentive are more effective than legal procedures. At last, a variety of policy adaptability plans must be founded in order to invigorate the separate ordering system in a view of the policy implementation.