• Title/Summary/Keyword: Work-in-Process Management

Search Result 1,890, Processing Time 0.032 seconds

Claim Management Process of General Contractors in South Korea

  • Seo, Wonkyoung;Kang, Youngcheol
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.207-215
    • /
    • 2020
  • The purpose of this study is to investigate the current status of claim management process of general contractors in South Korea. As the claim management becomes more important nowadays, maintaining the process for claim management systematically and consistently becomes more important as well. To improve the claim management process, it is necessary to diagnose the current status of claim management process so companies establish their targets for improvement. This study develops a survey to identify the current status of claim management process that major general contractors in South Korea have. Questions in the survey are classified into four categories including entitlement check, potential claim event check, time bar check, and tasks for substantiation. By conducting a series of statistical analyses with 94 survey data collected from employees working in the general contractor companies in South Korea, this study examines and analyzes their claim management process in terms of the several categories. It is expected that the results contribute to diagnosing how practitioners maintain their claim management, which will help them establish the direction of management enhancement.

  • PDF

Influence of perceived patient safety culture on patient safety management activity in the dental hygienists (치과위생사의 환자안전문화 인식이 환자안전관리활동에 미치는 영향)

  • Lee, Da-Jung;Han, Su-Jin
    • Journal of Korean society of Dental Hygiene
    • /
    • v.16 no.6
    • /
    • pp.863-877
    • /
    • 2016
  • The study aimed to investigate the influence of perceived patient safety culture on patient safety management activity in the dental hygienists. Methods: A self-reported questionnaire was completed by 292 dental hygienists in Seoul, Incheon and Gyeonggido from March 1 to April 8, 2016. The questionnaire consisted of general characteristics of the subjects (9 items), patient safety culture (44 items), and patient safety management activity (25 items) by Likert 5 point scale. Data were analyzed by t test, one way ANOVA, stepwise multiple regression test, and post-hoc Tukey test using SPSS 18.0 program. Results: The perceived patient safety culture was 3.50 on average. Entire organization was the highest score (3.68) and followed the communication process (3.55), the environment of work unit (3.47), the attitude of supervisor/manager (3.45), and the frequency of events reported (2.98). The average of patient safety management activity was 3.71. As for the factors of patient safety culture on patient safety management activity, communication process was the most influential factor (${\beta}=0.268$), and followed the entire organization (${\beta}=0.265$), the environment of work unit (${\beta} =0.166$), the frequency of events reported (${\beta}=0.104$), and among the control variables. Work place proved to be the only significant variable. Conclusions: In order to promote patient safety management activity of dental institutions, the patient safety culture should be created and established. The influence of communication process and patient safety culture at entire organization level was huge. So the environment of work unit and the perceived patient safety culture in the process of reported events were influencing factors. The strategy for patient safety management activity should be considered because of low level of perceived patient safety culture.

A Study on the Business Process Model for sustainable Supply Chain (지속가능한 공급사슬(Supply Chain)을 위한 비즈니스 프로세스 모델 연구)

  • Ahn, Kyeong Rim;Lee, Ju Yeon
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.10 no.1
    • /
    • pp.181-193
    • /
    • 2014
  • The environment of supply chains is rapidly changed to global and eco-freindly work process. However, at current environment, it is not easy to grasp work flow and to analyze energy efficiency. Improving energy efficiency and visibility for goods flow can contribute to increases in customer attitudes and reductions in overall production costs Additionally, it can lead to increases in work efficiency and reductions in overall production costs. Until recently, efforts to improve energy performance focused on manufacturing industry. Those efforts have expanded to the supply chain. In this paper, we perform business process modeling about supply chain for visibility and sustainability - information and component flows - from assembly plants to logistics. This paper defines the work and information flows by modeling the underlying logical structures of the supply chain and the business processes that determine impact of visibility and sustainability. We model processes using the modeling methodology specified by UN/CEFACT. This methodology explains business process functionality and business transactions by UML diagram. The output of this paper would be useful in grasping work flow and capturing the used energy.

Development of Construction Project Management System Applicable to Earth-Work Field (토공 현장관리 중심의 시공관리시스템 개발에 관한 연구)

  • Kwon, Oh-Yong;Jo, Jae-Ik;Kim, Do-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.301-304
    • /
    • 2008
  • The purpose of this study is to embody the integrated working management system for public works, focused on the management of surplus soil at a field of public works. The contents and results of this study can be classified into the design of working management DB for public works and the embodiment of working management DB. First, the design of working management DB for public works consists of three DBs - process management to analyze work plan and performance. for backhoe loader, working management and resources management for equipment and labor management - in connection with work and resources classification system. Secondly, the working management system for public works can describe work plan and performance on a floor plan using graphic. Based on this, the status of process and progress report with visual expression had been developed to facilitate the communications and performance of duties among staff in charge at the field of public works. This study is a specialized system for a company specializing in public works and a system that can be put into practical use if practicality is proved through test-bed with regard to business.

  • PDF

A Study of Inventory Models for Imperfect Manufacturing Setup Considering Work-in-Process Inventory (재공품 재고를 고려한 제조 시스템에서의 재고 관리 모델 연구)

  • Ullah, Misbah;Kang, Chang W.;Qureshi, Shehereyar Mohsin
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.37 no.4
    • /
    • pp.231-238
    • /
    • 2014
  • Optimum lot size calculation for real world manufacturing environment has been focused since last few decades. Several extensions have been made to the basic economic order and production order quantity models to realize the possible practical situations in industry. However, focus on work-in-process inventory has been ignored relatively. This paper provides a comprehensive review of the models developed for group technology based manufacturing environment focusing on work-in-process inventory. Models have been extended from a perfect manufacturing conditions to an imperfect manufacturing situation considering rework, rejection and inspection. Optimum lot size has been evaluated using a simple algebraic optimization approach. Significant parameters are highlighted using sensitivity analysis for the developed models. Numerical example is used to illustrate the utilization of such models in day-to-day production setups and the impact of significant factors' variation on total cost and optimum lot size.

Measurement of Physician's Work for Korean Medicine Services Using Analytic Hierarchy Process (계층화 분석법(Analytic Hierarchy Process)을 활용한 한의사 업무량 산출)

  • Lim, Byung-Mook;Kwon, Hyuk-Sang;Han, Chang-Ho;Shin, Byung-Cheul
    • Journal of Society of Preventive Korean Medicine
    • /
    • v.13 no.1
    • /
    • pp.105-115
    • /
    • 2009
  • Background: The resource-based relative value scale has been applied to Korean medicine services as part of the National Health Insurance, yet the proper scoring method for physician's work needs to be developed. Objectives: To measure physician's work for Korean medicine services using Analytical Hierarchy Process(AHP) and to compare results abstracted by AHP with those by Magnitude Estimation method. Methods: We developed the AHP questionnaires for Korean Medicine services and administered it to 12 Korean medicine insurance experts. Weighted scores were calculated and were converted into physician's work scores. Results: In AHP measurement, the physician's work scores for acupuncture activities, especially special acupunctures, far increased, while those for diagnosis and basic consultations decreased. Variations in the scores enlarged. Conclusions: As an alternative, AHP method can be considered for measuring the physician's work for Korean medicine services with careful management of scoring variation.

  • PDF

Work Condition Analysis Process for Improving Reliability of Work Plan (작업계획의 신뢰도 향상을 위한 작업여건분석 체계)

  • Song, Ji-Won;Yu, Jung-Ho;Kim, Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.36-44
    • /
    • 2009
  • The sum of each work duration are entire period in construction project. Each work occurs to be late, the total period of construction project will delays. Therefore, the total period of construction project will not be delayed if probability of work progress makes higher. Finding each work constraints performs constraints analysis in process of construction for checking probability of work progress. Grasp work constraints through the constraints analysis and removes. This research will show preventing delay of construction project, through work condition analysis process.

Impact Analysis of Construction Delay: The Case of Defects In the Top-down Construction Method

  • Suk, Janghwan;Kwon, Woobin;Soe, Jang-woo;Cho, Hunhee
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.213-221
    • /
    • 2022
  • Defects are the risk factors in the construction process of buildings. They cause damage, delaying the construction duration. They especially cause adverse effects on the top-down construction method. This study analyzed the degree of construction delay induced by each work type, focusing on defects in the top-down method. Then, we derived construction delay induction coefficient from different work types in order by using the severity of construction delay per defect and the occurrence probability of defect; this assessment model measures the impact of defects on construction delay for each work type. Furthermore, by comparing each work type based on the defect frequency and the construction delay induction coefficient, we found work types that need to be administered attentively. We identified that plastering work was easy to overlook, requiring caution in defect management. This study provides an efficient defect management system suitable for the buildings that are built using the top-down construction method.

  • PDF

Risk Factor Selaction and Safety Management Plan in the Underground Excavation Construction (지반굴착공사에서의 위험요인 선정과 안전관리방안 연구)

  • Won, Yu-Jin;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.21 no.4
    • /
    • pp.31-37
    • /
    • 2019
  • When the foundation work of the underground part of the building structure or the excavation work of the civil engineering structure is carried out, there is the earthwork work by the inevitable process. As the economic situation continues to develop, construction in urban areas is becoming bigger and higher in scale due to the expansion of infrastructure and the rescue of urban dwellings in urban areas, and excavation of underground roads is inevitable. Excavation of the underground part may cause problems in the process difficulty and safety of the earthworks due to the complexity and various characteristics of the ground selected without consideration of the ground characteristics and site conditions. In order to complete the required facilities, it is necessary to secure the design and construction of the retaining walls. In order to complete the required construction, It is an important factor satisfying construction period and economical efficiency.

Exposure Characteristics for Chemical Substances and Work Environmental Management in the Semiconductor Assembly Process (반도체 조립공정의 화학물질 노출특성 및 작업환경관리)

  • Park, Seung-Hyun;Park, Hae Dong;Shin, In Jae
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.24 no.3
    • /
    • pp.272-280
    • /
    • 2014
  • Objectives: The purpose of this study was to evaluate the characteristics of worker exposure to hazardous chemical substances and propose the direction of work environment management for protecting worker's health in the semiconductor assembly process. Methods: Four assembly lines at two semiconductor manufacturing companies were selected for this study. We investigated the types of chemicals that were used and generated during the assembly process, and evaluated the workers' exposure levels to hazardous chemicals such as benzene and formaldehyde and the current work environment management in the semiconductor assembly process. Results: Most of the chemicals used at the assembly process are complex mixtures with high molecular weight such as adhesives and epoxy molding compounds(EMCs). These complex mixtures are stable when they are used at room temperature. However workers can be exposed to volatile organic compounds(VOCs) such as benzene and formaldehyde when they are used at high temperature over $100^{\circ}C$. The concentration levels of benzene and formaldehyde in chip molding process were higher than other processes. The reason was that by-products were generated during the mold process due to thermal decomposition of EMC and machine cleaner at the process temperature($180^{\circ}C$). Conclusions: Most of the employees working at semiconductor assembly process are exposed directly or indirectly to various chemicals. Although the concentration levels are very lower than occupational exposure limits, workers can be exposed to carcinogens such as benzene and formaldehyde. Therefore, workers employed in the semiconductor assembly process should be informed of these exposure characteristics.