1 |
Harris, F.W., How many parts to make at once. Operations Research, 1990, 38(6): p 947-950.
DOI
|
2 |
Gupta, T. and Chakraborty, S., Looping in a multistage production system. The International Journal of Production Research, 1984, Vol. 22, No. 2, p 299-311.
DOI
ScienceOn
|
3 |
Rosenblatt, M.J. and Lee, H.L., Economic production cycles with imperfect production processes. IIE transactions, 1986, Vol. 18, No. 1, p 48-55.
DOI
|
4 |
Cheng, T., An economic order quantity model with demand- dependent unit production cost and imperfect production processes. IIE transactions, 1991, Vol. 23, No. 1, p 23-28.
DOI
|
5 |
Ben-Daya, M. and Hariga, M., Economic lot scheduling problem with imperfect production processes. Journal of the Operational Research Society, 2000, Vol. 51, No. 7, p 875-881.
DOI
|
6 |
Salameh, M. and Jaber, M., Economic production quantity model for items with imperfect quality. International Journal of Production Economics, 2000, Vol. 64, No. 1, p 59-64.
DOI
ScienceOn
|
7 |
Goyal, S.K. and Cardenas-Barron, L.E., Note on: economic production quantity model for items with imperfect quality -a practical approach. International Journal of Production Economics, 2002, Vol. 77, No. 1, p 85-87.
DOI
ScienceOn
|
8 |
Biswas, P. and Sarker, B.R., Optimal batch quantity models for a lean production system with in-cycle rework and scrap. International Journal of Production Research, 2008, Vol. 46, No. 23, p 6585-6610.
DOI
|
9 |
Jamal, A., Sarker, B.R., and Mondal, S., Optimal manufacturing batch size with rework process at a singlestage production system. Computers and Industrial Engineering, 2004, Vol. 47, No. 1, p 77-89.
DOI
ScienceOn
|
10 |
Chiu, S.W., Ting, C.-K., and Chiu, Y.-S.P., Optimal production lot sizing with rework, scrap rate, and service level constraint. Mathematical and Computer Modelling, 2007, Vol. 46, No. 3-4, p 535-549.
DOI
|
11 |
Chan, W., Ibrahim, R., and Lochert, P., A new EPQ model : integrating lower pricing, rework and reject situations. Production Planning and Control, 2003, Vol. 14, No. 7, p 588-595.
DOI
|
12 |
Pal, B., Sana, S.S., and Chaudhuri, K., Maximising profits for an EPQ model with unreliable machine and rework of random defective items. International Journal of Systems Science, 2013, Vol. 44, No. 3, p 582-594.
DOI
|
13 |
Ojha, D., Sarker, B., and Biswas, P., An optimal batch size for an imperfect production system with quality assurance and rework. International Journal of Production Research, 2007, Vol. 45, No. 14, p 3191-3214.
DOI
|
14 |
Chiu, S.W., Wang, S.-L., and Chiu, Y.-S.P., Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns. European Journal of Operational Research, 2007, Vol. 180, No. 2, p 664- 676.
DOI
|
15 |
Sarkar, B., An EOQ model with delay in payments and stock dependent demand in the presence of imperfect production. Applied Mathematics and Computation, 2012, Vol. 218, No. 17, p 8295-8308.
DOI
|
16 |
Sarkar et al., An economic production quantity model with random defective rate, rework process and backorders for a single stage production system. Journal of Manufacturing Systems, 2014, Vol. 33, No. 3, p 423- 435.
DOI
|
17 |
Sarkar, B., Mandal, P., and Sarkar, S., An EMQ model with price and time dependent demand under the effect of reliability and inflation. Applied Mathematics and Computation, 2014, Vol. 231, p 414-421.
DOI
|
18 |
Wee, H.M. and Widyadana, G.A., Economic production quantity models for deteriorating items with rework and stochastic preventive maintenance time. International Journal of Production Research, 2011, Vol. 50, No. 11, p 2940-2952.
|
19 |
Sana, S.S., A production-inventory model in an imperfect production process. European Journal of Operational Research, 2010, Vol. 200, No. 2, p 451-464.
DOI
|
20 |
Sana, S.S., An economic production lot size model in an imperfect production system. European Journal of Operational Research, 2010, Vol. 201, No. 1, p 158-170.
DOI
|
21 |
Sana, S.S. and Chaudhuri, K., An EMQ model in an imperfect production process. International Journal of Systems Science, 2010, Vol. 41, No. 6, p 635-646.
DOI
|
22 |
Khan, M. et al., A review of the extensions of a modified EOQ model for imperfect quality items. International Journal of Production Economics, 2011, Vol. 132, No. 1, p 1-12.
DOI
|
23 |
Bough Er, T.O., Lot sizing in group technology production systems. International Journal of Production Research, 1984, Vol. 22, No. 1, p 85-93.
DOI
|
24 |
Cardenas-Barron, L.E., The derivation of EOQ/EPQ inventory models with two backorders costs using analytic geometry and algebra. Applied Mathematical Modelling, 2011, Vol. 35, No. 5, p 2394-2407.
DOI
|
25 |
Barzoki, M.R., Jahanbazi, M., and Bijari, M., Effects of imperfect products on lot sizing with work in process inventory. Applied Mathematics and Computation, 2011, Vol. 217, No. 21, p 8328-8336.
DOI
|
26 |
Ullah, M. and Kang, C.W., Effect of rework, rejects and inspection on lot size with work-in-process inventory. International Journal of Production Research, 2014, Vol. 52, No. 8, p 2448-2460.
DOI
|
27 |
Kim, H., Maximizing expected profit via multiple truck operation under imperfect truck quality. Journal of the Society of Korea Industrial and System Engineering, 2012, Vol. 35, p 45-51.
|
28 |
Han, Y. and Kim, H., An optimal solution algorithm of the single product inventory with target in-stock ratio constant. Journal of the Society of Korea Industrial and Systems Engineering, 2012, Vol. 35, p 204-209.
|