• 제목/요약/키워드: Work-in-Process Management

검색결과 1,890건 처리시간 0.029초

효율적 작업자 실수 예방 관리 사례연구 (A Case Study on Efficiency Worker blunder Preventive Management)

  • 유병우
    • 대한안전경영과학회지
    • /
    • 제8권1호
    • /
    • pp.27-42
    • /
    • 2006
  • Considering in view of China's low price and Japan's high technology, the most important point is the quality of product. To increase the comparative power internationally all workingmen have to fulfill the responsibility to maximize the quality, and this is possible practiced under 'Zero Defect' spirit. To reduce the defect ratio to 'Zero' the workingmen have to recognize own fault, all the manufacturing process should be conducted under 'Fool Proof System', If done under this circumstances, then labor force can work comfortably and safely without nervousness and tiresome. The productivity and quality can increase ultimately and even foreign labor, imbecile child, old-aged labor can participate in work, which can reduce shortage of labor source. Therefore, in this study all defects in manufacturing process, it would be recognized the errors and mistakes caused by human.

반도체 공정정보 관리 시스템 개발 (Development of semiconductor process information system)

  • 이근영;김성동;최락만
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1988년도 한국자동제어학술회의논문집(국내학술편); 한국전력공사연수원, 서울; 21-22 Oct. 1988
    • /
    • pp.401-406
    • /
    • 1988
  • Various types and huge volume of information such as process instructions, work-in process and parametric data are created in a wafer fabrication process and should be provided to personnels inside or outside the facility. This article describes design criteria and functional description on the information system for small-scale wafer fabrication process to accomplish paperless fab and to support efficient fab management.

  • PDF

생산현장의 안전성 향상을 위한 실시간 공정관리 시스템 개발 (Development of Real-time Process Management System for improving safety of Shop Floor)

  • 이승우;남소정;이재경;이화기
    • 대한안전경영과학회지
    • /
    • 제15권4호
    • /
    • pp.171-178
    • /
    • 2013
  • Workers are avoiding production/manufacturing sites due to the poor working environment and concern over safety. Small and medium-sized businesses introduce new equipment to secure safety in the production site or ensure effective process management by introducing the real-time monitoring technique for existing equipment. The importance of real-time monitoring of equipment and process in the production site can also be found in the ANSI/ISA-195 model. Note, however, that most production sites still use paper-based work slip as a process management technique. Data reliability may deteriorate because information on the present condition of the production site cannot be collected/analyzed properly due to manual data writing by the worker. This paper introduces the monitoring and process management technique based on a direct facility interface to secure safety in the field by improving the poor working environment and enhance there liability and real-time characteristics of the production data. Since the data is collected from equipment in real-time directly through the SIB-based interface and PLC-based interface, problems associated with workers' manual data input are expected to be solved; safety can also be improved by enhancing workers' attention to work by minimizing workers' injuries and disruption.

기업의 제품 개발업무 최적화를 위한 Collaborative Work-Flow System Architecture 연구 (The Study of Collaborative Work-Flow System Architecture for Optimization of Product Development in Enterprise)

  • 이재철;방헌;안대중;김태윤;이승호;유영선;송병재;최영준;안계호;장정렬;조상석;류병일;황창규
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 2001년도 추계학술대회 논문집
    • /
    • pp.25-28
    • /
    • 2001
  • Today enterprises are bringing forward the strong needs for the Global Work Space that is able to realize the collaboration of the virtual enterprise in order to achieve the rapid entrance to market, the quality improvement as well as the cost reduction of their new products. Especially, they are building the efficient Product Management Infrastructure in parallel with the real-time knowledge management for the information generated in the course of a product lifecycle and the Process Innovation making the Concurrent Engineering possible. Building a system in the web environment cannot be the entire effort to realize the Global Work Space within an enterprise that is an essential factor for the reduction of a product development period which in turn contributes to Time to Market. Various work models and processes are found in enterprises and many different application programs are developed and utilized to support these. This study proposes a scheme for the optimized Collaborative Workflow System Architecture that is able to take in and apply various application programs accompanied by the product development work process. Through this, we are to examine various limits and problems existing in the real-time collaborative system between enterprises and to reform these.

  • PDF

AN AUTOMATED FORMWORK MODELING SYSTEM DEVELOPMENT FOR QUANTITY TAKE-OFF BASED ON BIM

  • Seong-Ah Kim;Sangyoon Chin;Su-Won Yoon;Tae-Hong Shin;Yea-Sang Kim;Cheolho Choi
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1113-1116
    • /
    • 2009
  • The attempt to use a 3D model each field such as design, structure, construction, facilities, and estimation in the construction project has recently increased more and more while BIM (Building Information Modeling) that manages the process of generating and managing building data has risen during life cycle of a construction project. While the 2D Drawing based work of each field is achieved in the already existing construction project, the BIM based construction project aims at accomplishing 3D model based work of each field efficiently. Accordingly, the solution that fits 3D model based work of each field and supports plans in order to efficiently accomplish the relevant work is demanded. The estimation, one of the fields of the construction project, has applied BIM to calculate quantity and cost of the building materials used to construction works after taking off building quantity information from the 3D model by a item for a Quantity Take-off grouping the materials relevant to a 3D object. A 3D based estimation program has been commonly used in abroad advanced countries using BIM. The program can only calculate quantity related to one 3D object. In other words, it doesn't support the take-off process considering quantity of a contiguous object. In case of temporary materials used in the frame construction, there are instances where quantity is different by the contiguous object. For example, the formwork of the temporary materials quantity is changed by dimensions of the contiguous object because formwork of temporary materials goes through the quantity take-off process that deduces quantity of the connected object when different objects are connected. A worker can compulsorily adjust quantity so as to recognize the different object connected to the contiguous object and deduces quantity, but it mainly causes the confusion of work because it must complexly consider quantity of other materials related to the object besides. Therefore, this study is to propose the solution that automates the formwork 3D modeling to efficiently accomplish the quantity take-off of formwork by preventing the confusion of the work which is caused by the quantity deduction process between the contiguous object and the connected object.

  • PDF

Work package 개념을 활용한 현장의 공정관리와 공사비 통합관리 효율화 방안 (Development of Integrated Cost and Schedule Management System using Work Package Concept for Efficient Project Management)

  • 김용표;이용준;이민재
    • 한국건설관리학회논문집
    • /
    • 제18권5호
    • /
    • pp.32-40
    • /
    • 2017
  • 최근 국내 건설산업은 성장의 시기를 지나 침체기로 접어들고 있으며 경쟁력 향상을 위해 건설사업관리 특히 공정관리의 중요성이 더욱 부각되고 있다. 이러한 상황에 토목 건설업계는 생존을 위한 다양한 공사관리 방안의 연구 및 현장 적용에 부단한 노력을 하고 있으며 많은 성과를 이루고 있으나 아직도 체계적이며 효율적이고 현장 활용도가 높은 공정관리 기법의 정착은 이루어지지 못하고 있다. 이에 본 연구에서는 공사관리의 핵심인 공정관리의 활용에 대해 설문조사방식으로 현장기술자들의 인식 및 이해의 정도를 파악하며 현장에서 실제 사용하고 있는 공정표의 작성수준과 활용 현황을 파악을 위해 방문 조사하여 현재 국내 공정관리 현주소 및 문제점을 파악하였다. 아울러, 기존문헌 및 연구논문의 고찰, 현장에의 적용성을 바탕으로 현장 활용성이 높은 WBS 분류에서부터 work pacckage 도출과 Activty도출, 공정표 작성 및 관리방안을 제안하였다.

Work Productivity Analysis of High-performance PC Slab Installation

  • Shin, Young-su;Cho, Kyuman;Cho, Chang-geun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.616-617
    • /
    • 2015
  • Demand is increasing for large, high-rise, and complex buildings, which is leading to advances in the development of high-performance structural systems. In this context, precast concrete (PC) technology has received a large amount of attention owing to its benefits in terms of schedule reduction, high quality, and easy installation. In addition, advanced methodologies that improve the PC performance by the addition of various materials have recently been reported. Research on analyzing the effects of such high-performance PC on the construction process and productivity is very limited. This makes it difficult for decision-makers to apply PC to particular projects. Thus, the aim of this research was to analyze the work productivity of the high-performance PC slab installation process by using a construction simulation tool to resolve critical issues. In this study, a real construction project that adopted PC slab installation work was analyzed, and a sensitivity analysis was performed to confirm the reliability of the analysis results.

  • PDF

무기체계 시험업무에 대한 리스크 관리 표준 프로세스 연구 (A Study on Standard Process of Risk Management for Defense Systems Test Works)

  • 나태흠;허동은;김영민;이주연
    • 한국군사과학기술학회지
    • /
    • 제27권3호
    • /
    • pp.364-374
    • /
    • 2024
  • Today, risks created by uncertainty must be managed for successful project execution. From this perspective, applying a risk management process is very important for successful defense systems test works. This paper describes 'the implentation of risk management process for test work' carried out by DTERI's process improvement activities. In this study, the concept of risk management process, and details of the risk management process are examined through PMBOK and ISO/IEC/IEEE 15288, CMMI. After that, we defined 'Standard Process for Risk Management' of defence systems test works. And, we describe 'Risk Management Function' of DTERI's Project Management System(PMS) and the risk management process of DTERI. Finally, the effectiveness of the risk management standard process is verified through quantitative analysis.

맞춤형 야구복의 효율적 생산관리를 위한 공정관리 분석 (Process Control Analysis for Efficient Production Management of Customized Baseball Uniforms)

  • 최경미;황현정;전정일;박용수
    • 한국의류산업학회지
    • /
    • 제14권4호
    • /
    • pp.597-606
    • /
    • 2012
  • To increase the productivity and product quality of customized baseball jerseys, this study developed a multi-variable system for a production process that efficiently controls diverse production management factors. The working time was measured through the establishment of a standard process where skilled workers and Chinese factory workers manufactured 5 sets of the same basic design jerseys. Based on the measured working time (1,136 seconds/per unit), the multi-variable process control system was developed, where hourly production management is possible according to the involved workers and equipment types. Each process was assigned accoding to the production management factors for a total of 28 standard processes. The processes were developed based on consideration of work characteristics according to the order of needlework of open-type set baseball jerseys with sleeves(the basic design of baseball jerseys)to result in a customized production system structure that could be set up with multi-variables. As a result, a total 12 types of systems were developed in consideration of the personnel involved and the number of equipments. The optimal production management system (with the highest efficiency compared to the number of workers)was A-2, B-1, C-1. D-2, E-2, F-1, and G-1. This system had extremely high efficiency and showed 99% assignment efficiency for the 7-person team. Though not optimal, possible process assignment for each working personnel is proposed as a reserve process in case work modification is inevitable due to malfunctions and the absence of equipments.

ICT와 경영을 융복합적으로 활용한 스마트워크 도입 기업의 시·공간 제약 극복과 조직 성과 달성에 관한 연구 (A Study on Organizations Adopting Convergence-based Smart Work for Overcoming Constraints and Achieving Performance)

  • 오상조;김용영
    • 디지털융복합연구
    • /
    • 제13권6호
    • /
    • pp.113-124
    • /
    • 2015
  • 정보통신기술(ICT)과 경영을 융복합적으로 활용한 스마트워크는 언제, 어디서나 편리하고 효율적으로 업무를 수행하는 "일하는 방식의 변화를 통한 일과 삶의 균형"을 추구할 목적으로 2010년 시작되었다. 5년여가 경과한 현재까지 대부분의 스마트워크 관련 연구는 조직에서 스마트워크를 수용하기 전이나 초기 수용 단계에서 진행되었다. 이 때문에 수용 기업에서 스마트워크를 수용하는 과정에서 나타나는 변화관리의 노력, 추진하면서 발생하는 문제점, 활용하면서 얻는 성과 등을 제시하는 데 한계가 있다. 정보시스템을 도입하여 실질적인 성공을 달성하기 위해서는 도입 자체보다는 지속적 사용이 필수적이다. 왜냐하면 사용 빈도가 낮고, 사용 방법이 적절하지 못하고, 사용의 효과가 없을 경우, 해당 정보시스템의 도입은 실패로 규정되기 때문이다. 따라서 본 연구에서는 스마트워크를 성공적으로 도입하여 지속적으로 활용하고 있는 기업을 대상으로 조직에서 시 공간 제약을 극복해 가는 과정과 이를 통해 조직적 성과를 달성하는 과정을 살펴보고자 한다. 이러한 목적을 달성하기 위해 시간지리학과 수용 모델에 기반한 프레임워크를 개발하고, 이를 토대로 도입 기업의 시 공간 제약 극복 과정과 조직 성과를 제시하고자 한다.