• Title/Summary/Keyword: Work-in-Process Management

Search Result 1,897, Processing Time 0.028 seconds

Business Process Efficiency in Workflows using TOC

  • Bae Hyerim;Rhee Seung-Hyun
    • Proceedings of the Korea Association of Information Systems Conference
    • /
    • 2003.11a
    • /
    • pp.55-63
    • /
    • 2003
  • Workflow Management System (WFMS) is a software system to support an efficient execution, control and management of complex business processes. Since traditional commercial systems mainly focus on automating processes, they don't have methods for enhancing the task performer's efficiency. In this paper, we propose a new method of executing business processes more efficiently in that a whole process is scheduled considering the degree of the participants' workload. The method allows managing the largest constraints among constituent resources of the process. We utilize DBR scheduling techniques to develop the method. We first consider the differences between workflow process models and DBR application models, and then develop the modified drum, buffer and rope. This leads us to develop WF-DBR (WorkFlow-DBR) that can control the proper size of the task performers' work list and arrival rate of process instances. Use of WF-DBR improves the efficiency of the whole process as well as the participants' working condition. We then carry out a set of simulation experiments and compare the effectiveness of our approach with that of scheduling techniques used in existing systems.

  • PDF

On the Construction of Requirements DB to Improve the Work Environment of Locomotive Cabs (철도차량 운전실의 작업환경 개선을 위한 요구사항 DB 구축에 관한 연구)

  • Sim, Sang-Hyun;Lee, Jae-Chon;Park, Chan-Woo
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.4
    • /
    • pp.71-79
    • /
    • 2011
  • The work environment of locomotive cabs has long been an important issue in the design of railload systems since it is quite critical in terms of system's operational safety. It is getting more attention as the running speed of the trains goes up these days. To this end, this paper describes how to systematically construct a DB for the requirements set in the course of the improvement process for the aforementioned cab work environment. As a solution approach, we have adopted the requirement architecture concept to cover the whole activities required to do such as in requirements generation, DB construction, change management, and traceability management. Specifically, based on the requirement architecture framework a requirement process to collect requirements for improvement is discussed, and the guide lines are suggested for verification and validation of the developed requirements. In addition, a base schema and requirements templates are developed, which will be used in generating requirements and constructing a DB. Finally, it is demonstrated how the requirements DB for locomotive cabs can be constructed using a computer-aided tool in an integrated fashion.

A Study on the Productive Capacity Setting of Women's Jacket (여성 재킷의 생산능력 설정을 위한 연구)

  • Kim, Jin-Sun;Shim, Kyu-Nam;Oh, Soon
    • Fashion & Textile Research Journal
    • /
    • v.13 no.2
    • /
    • pp.269-278
    • /
    • 2011
  • This study aims at setting up productive capacity which can be usefully utilized for work management of apparel manufacturers. So as to achieve this goal, an apparel manufacturing company which has been operated by miniline system in Seoul was selected. Standard time and man-hour were calculated to create the accurate productive capacity by observing and measuring a work flow included cutting, sewing and finishing processes. And the result is as following. The standard time for each process was presented as cutting process 47004.5s, sewing process 671050.5s and finishing process 22426.3s. And 15284.4ms was computed as total procession man-hour per day of the manufacturer which is organized of 16 people. Also, the procession man-hour for each process was revealed as cutting process 396.7ms(2.6%), sewing process 14509.3ms(94.9%) and finishing process 378.5ms(2.5%). +Surplus was found in the productivity for each process included the cutting process(outshell, lining and seam process), the sewing process(preparation and arrangement process) and the finishing process. But, additional man-hour 52436.18ms was required because the productive capacity was calculated as -surplus(-13.9%) in the sewing process(part and assembly process). Therefore, a work schedule was planned based on the previous result. However, loading can be ideal when a capacity and a load become '0'. The object company should find the way to reduce allowance(26.25%) of the sewing process through reconstruction of consciousness and improvement in functions with analyzing works of operators. Also, they need to consider an additional supplement of the personnel.

Defect Classification and Management System Using CBR technique Based Internet in Apartment Housing Project (인터넷기반 공동주택 하자분류 및 관리 시스템 구축에 사례기반 추론기법을 활용한 연구)

  • Kim, Gwang-Hee;Shin, Han-Woo;Seo, Deok-Seok;Yoon, Jie-Eon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.1
    • /
    • pp.63-70
    • /
    • 2008
  • Management process of apartment buildings construction has increased because the after service of construction company meet the needs of customers. Many defect data, which was inspected by construction company or customers before moving into a new apartment house, were classified by field engineers and then communicated to corresponding subcontractors. The classification process needs to be performed by an expert engineer because there is so much data, it is unfeasible to complete in a short period of time. For this classification process, an automatic classification system using case base reasoning (CBR) should be considered. This research proposed a defect management system with automatic classification system using CBR. This constructed defect management system consists of cyber after service system for tenants and the whole defect management process of construction, preservation and management of apartment buildings. This system could improve the efficiency of expert work in terms of time and accuracy, as well as helping laymen users to conduct defect classification work as experts do.

Developing a Data Model of Product Manufacturing Flow for an IC Packaging WIP System

  • Lin, Long-Chin;Chen, Wen-Chin;Sun, Chin-Huang;Tsai, Chih-Hung
    • International Journal of Quality Innovation
    • /
    • v.6 no.3
    • /
    • pp.70-94
    • /
    • 2005
  • The IC packaging industry heavily relies on shop floor information, necessitating the development of a model to flexibly define shop floor information and timely handle manufacturing data. This study presents a novel data model of product manufacturing flow to define shop floor information to effectively respond to accelerated developments in IC package industry. The proposed data model consists of four modules: operation template setup, general process setup, enhanced bill of manufacture (EBOMfr) setup, and work-order process setup. The data model can flexibly define the required shop floor information and decision rules for shop floor product manufacturing flow, allowing one to easily adopt changes of the product and on the shop floor. However, to handle floor dynamics of the IC packaging industry, this work also proposes a WIP (i.e. work-in-process) system for monitoring and controlling the product manufacturing flow on the shop floor. The WIP system integrates the data model with a WIP execution module. Furthermore, an illustrative example, the MIRL WIP System, developed by Mechanical Industrial Research Laboratories of Industrial Technology Research Institute, demonstrates the effectiveness of the proposed model.

The Organization Performance Reinforcement by a Utilization Level of the Smart Work (스마트워크 활용 수준에 따른 조직성과 강화에 관한 연구)

  • Jung, Byoungho
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.14 no.4
    • /
    • pp.189-204
    • /
    • 2018
  • The purpose of this study is to examine an organizational performance difference by individual utilization level of the smart work. The Smart work help minimizing business process and improving organization productivity based on information technology. This new technology provides a flexible way of the task through smart-work center, videoconferencing, telecommuting, mobile(remote control) and business-only messenger. This investment changes organizational culture, institutions and behavior by new technology applying. The organization system change due to smart work has trouble between alteration preferences and existing maintains a group. In response, the organization should make investment justification of smart work for institutional and culture stabilized by a new system in organization. I set up the analytical process of four stages for empirical research. It will analyze an operation difference of the smart work between pre and post investment in the first-step analysis. The two-step analysis will conduct a text mining analysis of smart work operations. The three-step analysis will identify organization performance differences among individual levels in smart work. The four-step analysis will identify a factor difference in organizational performance by individual utilization level on smart work. According to the study, It has been revealed a difference between the pre and post investment performance on smart work. The text mining analyses many appeared an improvement opinion of organizational culture. Next, there is a difference in organization performance among utilize groups of smart work. Furthermore, the factors of organizational performance among groups appeared differently. The theoretical contribution of this study provided to expand the organizational theory of organization change and resistance. The practical implications provided to require a strong guideline an organizational culture and institution for smart work.

The DEVELOPMENT OF WORK PERFORMANCE ANALYSIS SYSTEM

  • Lim, Chul-Woo;Yu, Jung-Ho;Kim, Chang-Duk
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.738-746
    • /
    • 2009
  • The purpose of this study is to develop the web-based system for work performance analysis(WPAS). The need of work performance analysis system has already been suggested in many previous researches on the computerization of the performance measurement in the construction site by using the indicators such as time, cost and quality. However, they had focused on measuring or analyzing the result when the project would be over. The WPAS suggests three indicators - work reliability, work effectiveness and work efficiency - to manage the performance of the construction site. It can help the manager more easily recognize the status of on-going work in the construction site by measuring and analyzing the work reliability rate, the work effectiveness and work efficiency every day. This research includes the procedures for WPAS measurement process, database structure of WPAS which was analyzed by the IDEF0 and the data flow diagram. Finally, this research introduces the result of WAPS's case studies and validation in the Korean construction site.

  • PDF

Effects of Chemical Accident Risk Warning System in High Risk Workplaces of Major Industrial Accidents (중대산업사고 고위험 사업장에서의 화학사고위험경보제의 효과)

  • Woo Sub Shim;Ji Ung Choi
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.26 no.5
    • /
    • pp.765-774
    • /
    • 2023
  • The Ministry of Employment and Labor implemented the process safety management(PSM) system from 1996 to prevent major industrial accidents caused by chemical substances, but the number of accidents did not drastically decrease. Even in workplaces with excellent PSM ratings, large-scale chemical accidents still occur due to non-compliance with safety work procedures and insufficient safety measures during maintenance and other work. Accordingly, the chemical accident risk warning system was introduced in 2014 to supplement the PSM system and prevent accidents that may occur during regular or unexpected maintenance and repair work. In the meantime, changes in the safety management system have been checked since the introduction of the chemical accident risk warning system at chemical handling workplaces, and based on the results, a plan for upgrading this system has been proposed. The effect of the CARW system was found to directly prevent accidents through wired and on-site consulting and post-management at the workplace and indirectly contribute to the establishment of a safety and health management system at the workplace, such as improving safety culture awareness.

Repetitive Strain Injury on Automobile Assembly Process and Alexander Technique

  • Dae Sig, Kim
    • Journal of the Korea Safety Management & Science
    • /
    • v.6 no.2
    • /
    • pp.67-78
    • /
    • 2004
  • In the trim line of an automobile assembly process, 52.9% of the subjects complained the shoulder and low back pain simultaneously. The Alexander Technique is an educational method which shows people how they are misusing their bodies and how their daily habits of work can be harmful. It also teaches people how to avoid work habits which create excessive amounts of static work and how to reduce the amount of unnecessary muscular force they are applying to their bodies. The purpose of this paper is to investigate the importance of repetitive strain injury on automobile assembly line process and contribute reducing the repetitive strain injury through Alexander Technique.

Process Planning for Finishing Works of High-rise Residential Buildings Project (고층 공동주택 마감공사의 공정계획 프로세스)

  • Baek, Tae-Yong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.11
    • /
    • pp.110-117
    • /
    • 2017
  • In the construction of high-rise residential buildings in which the finishing works are done repetitively in each housing unit, the construction period and cost can be reduced, while maintaining the quality, if the work process is properly managed in order for the resources to be input continuously. Time management methods such as the Bar Chart, CPM and LOB are not appropriate, due to the difficulties involved in the diagraming of repetitive works and applying them to the project. The Tact method also has difficulties in maintaining a constant work flow and needs significant effort and cooperation from the subcontractors to allocate the resources consistently. Partitioning, base works for finishing, floor mortar plastering and the final finishing work are done sequentially in residential buildings projects, and there are many repetitive activities which differ in terms of the work method, work area and productivity. If these repetitive activities are synchronized or converged toward the last work area, the goal of process management can be achieved effectively. Therefore, a process planning method for the finishing works of residential building projects is proposed, which takes into consideration elements, such as the sequential relation between the activities in each housing unit and classification of repetitive works in terms of their management method, work area and production rate, for the continuous input of resources into the housing units.